Attachment Two - ITB 2025-1200-0074 Bid Schedule - Updated.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- ITB 2025-1200-0074 - P/V Stimson Shipyard Repairs
- Issued by
- Alaska
About this file
This document is an attachment providing a bid schedule for ITB 2025-1200-0074 - P/V Stimson Shipyard Repairs, a state and local contract opportunity for the State of Alaska. The bid schedule includes line items for various temporary services, miscellaneous accounts, dry docking, hull services, hull painting, ballast and fresh water tank inspections, and hull plate and sea chest non-destructive testing inspections. Bidders must respond to all line items to be considered responsive. The bid deadline is 1:30 p.m. AKST on September 26, 2026, and bids must be submitted electronically. An inter-port differential cost is to be added to bid prices in accordance with Alaska state statute.
The bid schedule provides a breakdown of estimated hours and unit costs for each line item. Bidders must provide a total cost for each section as well as a grand total. Other required information includes the number of days guaranteed for re-delivery, the company name and address, and the name of the authorized representative. Funding requirements and sources are not specified in the document.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Schedule | ||||
| ITB 2025-1200-0074 P/V Stimson Shipyard Repairs | ||||
| All line items must be responded to in order to be considered responsive. | ||||
| Section | Estimated hours (if applicable) | Cost per unit (if applicable) | Line Item Totals | |
| Sec. 1.0 Temporary Service | ||||
| 1.1 | Mooring | |||
| 1.2 | Shore Power | |||
| 1.3 | Telephone | |||
| 1.4 | Potable Water | |||
| 1.5 | Ship's Service Air | |||
| 1.6 | Gangway | |||
| 1.7 | Fire Protection | |||
| 1.8 | Deck Covering | |||
| 1.9 | Garbage | |||
| 1.10 | Parking | |||
| 1.11 | Toilet Facilities | |||
| 1.12 | Tank Access and Testing | |||
| Section 1.0 Sub Total | $ - 0 | |||
| 2.0 Miscellaneous Accounts | ||||
| 2.2 | Welding Account | 200 | $ - 0 | |
| 2.3 | General Painting Account | 200 | $ - 0 | |
| 2.4 | Crane and/or Boom Truck Service Account | 10 | $ - 0 | |
| Section 2.0 Sub Total | $ - 0 | |||
| 3.0 Dry Docking | ||||
| 3.1 | Dry Docking | |||
| 3.2 | Lay Days | |||
| Section 3.0 Sub Total | $ - 0 | |||
| 4.0 Hull Services | ||||
| 4.1 | Inspection and Cleaning of Propellers | |||
| 4.2 | Transformer Testing | |||
| 4.3 | Install Crows Nest for Aft Mast | |||
| 4.4 | Rolling Chalk Brace Repairs | |||
| 4.5 | Install New Forward Mast Flood Lights | |||
| 4.6 | Engine Air Intake Space (Fiddley) | |||
| 4.7 | Inspect and Service Propeller & Rudder Shafts | |||
| 4.8 | Oily Water and Waste Oil Removal | |||
| 4.9 | Auto Pilot Replacement | |||
| 4.10 | Electrical Generator Muffler Replacements | |||
| 4.11 | AFFF Disposal | |||
| 4.12 | Deck Board Replacement | |||
| 4.13 | Black Water Tank Plumbing | |||
| 4.14 | Sea Valve and Overboard Discharge Valve Maintenance | |||
| 4.15 | Bow Thruster | |||
| 4.16 | Inspection and Replacement of Hull Zinc's | |||
| 4.17 | Bilge Cleaning | |||
| Section 4.0 Sub Total | $ - 0 | |||
| 5.0 Hull Painting | ||||
| 5.1 | Paint Bid Items | -- | ||
| 5.1.1 | Underwater Hull - Power Wash and Paint - Definite Bid Item | |||
| 5.1.2 | Underwater Hull – Spot Power Tool Cleaning – Contingent Bid Item | |||
| 5.1.3 | Main Deck inner Bulwarks and deck vents – Commercial Blast and Coat– Definite Bid Item | |||
| 5.1.4 | Preparation and Coating of New Steel Prior to Shipment | |||
| 5.1.5 | Prerequisites to Coating Application | |||
| 5.1.6 | Requirements during Coating Application and Curing | |||
| 5.1.7 | Correction of Damage from Paint Overspray and Grit Blasting | |||
| 5.1.8 | Paint Manufacturer | |||
| 5.1.9 | Documentation | |||
| 5.2 | Paint Schedule | -- | ||
| 5.2.1 | Coating System - Primer | |||
| 5.2.2 | Coating System - Exterior Freeboard, Bulwarks, House, Mast, and Cranes | |||
| 5.2.3 | Coating System - Decks | |||
| 5.2.4 | Decal Replacement | |||
| 5.2.5 | Coating System - Underwater Hull | |||
| 5.2.6 | Coating System - Interior Voids | |||
| 5.2.7 | Coating System - Potable Water Tank | |||
| Section 5.0 Hull Painting | $ - 0 | |||
| 6.0 Ballast and Fresh Water Tank Inspections | ||||
| 6.2 | Modifications and Installations | -- | ||
| 7.0 Hull Plate and Sea Chest NDT Inspections | ||||
| 7.2 | Contractor-Provided Field Technician | |||
| 7.3 | Testing | |||
| Section 7.0 Sub Total | $ - 0 | |||
| Additional Line Items | ||||
| Re-Delivery Fee / Shipyard tax, if applicable | ||||
| Inter-port Differential Costs* |
GRAND TOTAL (Sections 1.0 - 7.0 + Additional Line Items) $ - 0
| Date | Number of Days | |
| Guaranteed Re-Delivery |
Company Name
Company Address
| Typed Name of Authorized Representative | |
| *NOTE TO BIDDERS: An interport cost differential is to be added to bid prices in accordance with Alaska State Statute Sec 36.90.049 (e2) and policies for determining bid award. See Attachment One: Technical Specifications for Scope of Work for identification of applicable interport cost. |