Attachment_-_Submittal_List.xls

XLS spreadsheet 620 KB Posted

Attached to
Riverbank Stabilization Federal contract opportunity
Solicitation number
140P6422R0001
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal List

SUBMITTAL LIST
CUVA 239037 | Riverbank Stabilization Milepost 54.2
SUBMITTALREQUIREMENTS (indicate with an "X")
Spec. Sec.Par. No.DescriptionINFORMATIONALACTION
CERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSHOP DRAWINGSAMPLEMfg. DATA

& INSTRUCTIONS

0131001.4Signed Contractx
1.4Alternative Payment Protectionx
1.4Certificate of Liability Insurancex
1.4Letter designating project manager and superintendentx
1.4Accident Prevention Plan (Ref. 01 35 23)x
1.4Construction Schedule (Ref. 01 32 16)x
1.4Quality Control Plan (Ref. 01 40 00)x
1.4Schedule of Values (Ref. 01 32 16)x
1.4List of individuals working on the projectx
1.4Written Statements from Subcontractors certifying compliance with applicable labor standard clauses (SF1413)x
1.4Temporary Storm Water Pollution Prevention Plan - UPPP (Ref. 01 57 23)x
0132331.2Construction Images - Existing Condtionsx
1.2Construction Images - Weekly Progressx
0140001.4Qualification datax
1.4Quality control daily reportsx
1.4Test reportsx
1.4Permits, licenses and certificatesx
0157231.3Inspection schedulex
1.3Erosion control productsx
0173401.2Certificates by land surveyorx
1.2Landfill receiptsx
1.2Certified Surveyx
01 77 001.3Warranties, guaranties, workmanship bonds, final certifications, similar as applicable.x
1.3Project Record Documentsx
310519.131.3Product data for Geotextile productsx
1.3Manufacturer Certificatex
1.3Manufacturer Instructionsx
3120001.4Material test reportsx
313716.131.3Producct data for riprapx
1.3Manufacturer's Certificatex
3292001.4Certification of grass seedx
1.5Maintenance data recommendations for seedx

&L&"Times New Roman,Regular"&11SECTION 01 33 23 SUBMITTAL PROCEDURES &L&"Times New Roman,Regular"&11HOSP - 247251&R&"Times New Roman,Regular"&11 01 33 23 - &P

SUBMITTAL LIST

Review Estimate Template

SUBMITTAL LIST AND REVIEW ESTIMATE
SUBMITTALS LISTACTION SUBMITTAL REVIEW ESTIMATE
Park/PMIS/Project Title(Complete this portion for AE Const. Serv. task order negotiation.)
SUBMITTALREQUIREMENTS
(indicate with an "X")A/E REVIEW TIME

(indicate number of hours)

Spec. Sec.Par. No.DescriptionINFORMATIONALACTIONARCH (hrs)CE (hrs)SE (hrs)ME (hrs)EE (hrs)PM - Coor. (hrs)LA (hrs)
CERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSHOP DRAWINGSAMPLEMfg. DATA

& INSTRUCTIONS

Total 0 0 0 0 0 0 0

Template Instructions

SUBMITTAL LIST AND REVIEW ESTIMATE

INSTRUCTIONS

PHASE OF WORKRESPONSIBLE PARTYDESCRIPTION OF TASKS
DESIGN SERVICES
(CONSTRUCTION DOCUMENTS PHASE)Design A/E1. Fill out Park/PMIS/Project Title cell with project reference information.
2. Use this form to record construction submittal requirements for the project. Fill out the Specification Section, Paragraph number, Description columns on the left side of the form. Insert Additional rows, as required for sections containing multiple submittals.
3. In the columns designated "REQUIREMENTS", indicate the submittal requirement(s) by placing an "X" in the appropriate box(es). Insert additional columns as necessary under the headings of Informational or Action to correctly show the type of submittal. Refer to Specification Section 01 33 23 for clarification on what are Informational submittals or Action submittals. (Action submittals require Government responsive action and informational do not.) All Division 01 Specification Submittals should be shown as Informational Submittals.
4. Attach a black and white version to the end of Specification Section 01 33 23 in the project manual. Delete instructional note on the top of the page.
CONSTRUCTION SERVICES
(CONSTRUCTION PHASE)Construction COR1. Utilize the "Submittal List" form submitted with the Final Construction Documents. Copy/paste submittal information into the Submittal List and review estimate. If amendments have been issued, make adjustments to the submittal requirements if necessary.
2. Attach this form to the "A/E Construction Services" Scope of Services.
3. Utilize this form to the generate the estimated time required for the A/E to accomplish the Action submittal reviews by inserting your estimated number of hours per discipline under corresponding column headings.
4. Add discipline heading columns, as required.
5. Use the total number of hours per discipline at the bottom of the form and apply the hourly rates listed in the IDIQ contract (using appropriate option period rates) to formulate the Government estimate for submittal reviews. Refer to the sample by selecting an appropriate tab below.
6. Use the information contained within this form to negotiate the submittal review portion of the A/E Construction Services task order.
7. Provide this form to the CMR so they have an understanding of which submittals they are responsible for and which are to be forwarded to the A/E.

All Informational submittals will be reviewed by the CMR.

A/E1. Indicate level of effort required for each Action submittal review by inserting the number of hours for each discipline under the "A/E Review Time (indicate number of hours)" column.
2. All Informational submittals will be reviewed by the CMR.
3. Use the total number of hours indicated for each discipline and apply the appropriate rates from the IDIQ contract (using the appropriate option period rates) to formulate your estimate. Refer to the sample by selecting an appropriate tab below.
4. Use this estimate to negotiate the submittals review portion of the A/E Construction Services portion of the task order.

Submittal List Sample

SUBMITTAL LIST
Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities
SUBMITTALREQUIREMENTS

(indicate with an "X")

INFORMATIONALACTION
Spec. Sec.Par. No.DescriptionCERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSHOP DRAWINGSAMPLEMfg. DATA

& INSTRUCTIONS

21101.3Excavation safety planX
21201.4Signed copies of manifestX
23201.2Procedures for trench dewateringX
25011.3Water and sewer test accuracy cert.X
25021.2Water line marking tape sampleX
25171.2Fire Hydrants
Manufactures information: x-sectionX
Certification with AWWA C502-94X
27251.2Aggregate base courseX
27781.2Walks, curbs and gutters, mix designXX
33001.3Cast in-Place Concrete
Steel placement shop drawingX
Batching and hauling planX
Rebar certificationX
41001.2Mortar
Cured mortar sampleX
Material certification & test reportsX
42011.3Masonry Work
Shop drawingsX
Masonry unit sampleX
Mfg. information on admixturesX
51201.4Structural steelX
53111.3Steel roof deck shop drawingsX
54001.3Cold Formed Metal Framing
Shop drawings and erection diagramsX
Mill certificatesX
Welder certificatesX
64021.3Interior architectural woodworkXXX
71001.4Cold Fluid Applied Waterproofing
Product dataX
Shop drawingsX
Installer certificationX
Product test reportsX
72601.2Vapor retarder mfg. installation instructionsX
76101.3Sheet metal roofingXXX
81101.3Steel Doors and Frames
Shop drawingsX
Catalog cuts and install instructionsX
Door scheduleX
85201.3Aluminum windowsXX
87101.2Finish hardware scheduleX
93101.6Ceramic Tile
SampleX
Mfg. literatureX
CertificationX
99011.4Painting
Mfg. color chartX
Paint sample applied to like materialX
Mfg. informationX
108001.7Toilet and bath acc.mfg.infoX
114521.2Kitchen appliances, product dataX
125001.3Horizontal louver blindsX
150601.4Piping and accessoriesXXX
158001.3DuctworkXX
164701.4Panel boardsXXX

Review Estimate Sample

SUBMITTAL LIST AND REVIEW ESTIMATE
SUBMITTAL LISTSUBMITTAL REVIEW ESTIMATE
Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities(Complete this portion for AE Const. Serv. task order negotiation)
SUBMITTALREQUIREMENTS
(indicate with an "X")A/E REVIEW TIME

(indicate number of hours)

INFORMATIONALACTIONARCH (hrs)CE (hrs)SE (hrs)ME (hrs)EE (hrs)PM - Coor. (hrs)LA (hrs)
Spec. Sec.Par. No.DescriptionCERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSSAMPLESHOP DRAWINGMfg. DATA

& INSTRUCTIONS

21101.3Excavation safety planX
21201.4Signed copies of manifestX
23201.2Procedures for trench dewateringX
25011.3Water and sewer test accuracy cert.X
25021.2Water line marking tape sampleX2
25171.2Fire Hydrants
Manufactures information: x-sectionX
Certification with AWWA C502-94X
27251.2Aggregate base courseX
27781.2Walks, curbs and gutters, mix designXX32
33001.3Cast in-Place Concrete
Steel placement shop drawingX12
Batching and hauling planX1
Rebar certificationX
41001.2Mortar
cured mortar sampleX11
Material certification & test reportsX
42011.3Masonry Work
Shop drawingsX4
Masonry unit sampleX1
Mfg. information on admixturesX1
51201.4Structural steelX4
53111.3Steel roof deck shop drawingsX4
54001.3Cold Formed Metal Framing
Shop drawings and erection diagramsX4
Mill certificatesX
Welder certificatesX
64021.3Interior architectural woodworkXXX6
71001.4Cold Fluid Applied Waterproofing
Product dataX
Shop drawingsX2
Installer certificationX
Product test reportsX
72601.2Vapor retarder mfg. installation instructionsX
76101.3Sheet metal roofingXXX32
81101.3Steel Doors and Frames
Shop drawingsX3
Catalog cuts and install instructionsX
Door scheduleX
85201.3Aluminum windowsXX6
87101.2Finish hardware scheduleX
93101.6Ceramic Tile
SampleX2
Mfg. literatureX
CertificationX
99011.4Painting
Mfg. color chartX3
Paint sample applied to like materialX2
Mfg. informationX
108001.7Toilet and bath acc.mfg.infoX
114521.2Kitchen appliances, product dataX
125001.3Horizontal louver blindsX
150601.4Piping and accessoriesXXX3
158001.3DuctworkXX3
164701.4Panel boardsXXX3
Total297246300