ADDM-1, Page 1
ADDENDUM NO. ADDM-01 National Park Service – Interior Regions 3, 4 5 Facilities, Planning and Infrastructure to the 601 Riverfront Drive Bidding Documents Omaha, NE 68102 for 24 November 2021
CUYAHOGA VALLEY NATIONAL PARK – RIVERBANK RESTORATION MILEPOST 54.2
15610 Vaughn Road Brecksville, OH 44141 PMIS No. 239037
NOTICE TO BIDDERS: The Specifications and Drawings for the above referenced project are hereby amended as follows:
SPECIFICATIONS – GENERAL
ITEM NO. G-1 TABLE OF CONTENTS
a. DELETE Section 01 26 01 Contract Modification Procedures
b. DELETE Section 01 67 00
ITEM NO. G-2 SECTION 01 11 00 SUMMARY OF WORK
a. Part 1.2, WORK COVERED BY CONTRACT DOCUMENTS, A. Project Location, ADD the following language: Project is located adjacent to the Cuyahoga Valley Scenic Railroad (CVSR) at Milepost 54.2, between I-271 and the Ohio Turnpike (I-80), Boston Township, Summit County, Ohio (coordinates 41.2575 N, -81.5570 W).
b. Part 1.3, WORK PHASES, change title ‘WORK PHASES’ to PERIOD OF
PERFORMANCE. Part A., DELETE ‘The Work shall be conducted in a single phase.
Work of this phase shall be substantially complete within 120 business days after notice to proceed’ and replace the sentence with The Period of Performance shall be conducted in a single phase. The Period of Performance work shall be completed within 150 calendar days after issuance of the Notice to Proceed (NTP).
c. Part 1.4, CONTRACTOR USE OF SITE, Part E., DELETE ‘Coordinate safety training with Railroad and Park personnel’ and replace the sentence with The Contractor must coordinate with Railroad and Park personnel to complete required safety training for all employees working on site.
ITEM NO. G-3 SECTION 01 26 01 CONTRACT MODIFICAITON PROCEDURES
a. DELETE section 01 26 01 in its entirety.
ITEM NO. G-4 SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION
a. Part 1.4 SUBMITTALS, A. and B., DELETE in its entirety and replace with the following language:
A. General Submittal Procedures: Submittals shall be prepared and provided for the individual Specification Sections. Types of submittals are indicated in individual specific sections. CM-16 Transmittal Form: All submittals shall be transmitted via email using National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Contractor shall submit to Contracting Officer (CO) and Contracting Officer Representative (COR).
1. Documents to be submitted to Contracting Office before Notice to Proceed (NTP) will be issued (all are due 10 calendar days after notice of contract award):
ADDM-1, Page 2
1. Signed Contract
2. Alternative Payment Protection - Must provide either a Payment
Bond or Irrevocable Letter of Credit for construction contracts greater than $35,000, but not greater than $150,000
a. Payment Bonds - Must be provided for construction contracts exceeding $150,000
b. Performance Bond - Must be provided for any construction contracts exceeding $150,000
3. Certificate of Liability Insurance
4. Letter Designating the Project Manager and Site Superintendent and their authority as it pertains to this project
5. Safety/Accident Prevention Plan – must be approved before work can commence/start
If all of the documents listed above have not been received, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
2. Documents to be submitted to Contracting Office after NTP has been issued and work can be performed on-site/begin (all are due 10 calendar days after issuance of NTP or otherwise specified below):
The following submittals shall be submitted with a CM-16 transmittal cover sheet to the CO/COR and submitted for approval as outlined below:
1. Work/Project Schedule -- delineating the various stages of work by phase
(milestones)
2. Contractor shall provide, when applicable but not limited to, copies of product specifications, manufacturer’s literature and installation instructions of all materials and products to be furnished and installed. COR will verify that product specifications meet contract requirements.
3. Quality Control Plan
4. Schedule of Values (if applicable)
5. Documentation of licensing or certifications as an approved installer by manufacturer of materials for each individual product submittal and shop drawing (if required)
6. List of individuals working on the project
7. SF1413 – Statement of prime contractor/acknowledgement of subcontractor
8. Safety Data Sheets (SDS) for each individual product submittal and shop drawing (if required)
9. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP) Submitted to CO.
3. The following submittals are required to be submitted before final payment is made:
1. Unless otherwise specified in the specifications, Contractor is required to provide at the end of the project a series of before, during and after pictures of what was completed. The pictures will include all areas the contractor is authorized to work on.
2. Manufacturers recommended care and cleaning requirements (if applicable)
3. Receipts from recycling companies showing quantity of material being recycled.
4. Warranty documentation for workmanship (as outlined in the Specifications/Statement of Work: Start date of warranty will be the date shown on the Final Inspection Checklist/Report)
5. Product warranties (if applicable)
ADDM-1, Page 3
6. Pay applications
7. Certified payrolls – should be sent weekly
8. Contractor quality control daily reports (any outstanding)
9. Release of Claims - must be for the full amount of the contract (to include modifications)
10. SF1413 (any outstanding) - Statement of prime contractor/ acknowledgement of subcontractor
11. Drawings/pictures (if applicable), etc.
12. Testing Reports (if applicable)
13. Final Inspection Checklist/Report (initiated by the COR, all parties sign once complete)
B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
C. If all of these documents have not been received in the timeframe outlined above, the Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify the Contractor of tentative date for the Pre-Construction Conference after contract award.
ITEM NO. G-5 SECTION 01 32 16 CONSTRUCTION SCHEDULE
a. Part 1.3 SUBMITTALS, A.,DELETE part A. language in its entirety and replace with NOT
USED.
b. Part 1.3 SUBMITTALS, F.2.,DELETE part F.2. in its entirety.
c. Part 2.2 CONSTRUCITON SCHEUDLE REQUIREMENTS, Part 7.g. DELETE
Substantial Completion: Allow time for Government administrative procedures necessary for certificationof Substantial Completion (For more information, refer to Division 01 Specification 01 77 00 Closeout Procedures.) in its entirety. Part 9., DELETE Substantial Completion from the sentence and REPLACE with Final Completion in the sentence.
d. Part 3.1 B. 1., DELETE substantial completion and REPLACE with Final Completion in the sentence.
ITEM NO. G-6 SECTION 01 32 33 PHOTO DOCUMENTATION FOR HISTORIC PRESERVATION
PROJECTS
a. Part 3.1 CONSTRUCTION IMAGES, D,3,b. and c., DELETE parts b. and c. in their entirety.
ITEM NO. G-7 SECTION 01 33 23 SUBMITTAL PROCEDURES
a. Part 2.1 ACTION SUBMITTALS, A.3.b., DELETE substantial completion from the sentence and replace with final completion.
b. INCORPORATE Submittal List attachment included in this addendum into Section 01 33
23.
ITEM NO. G-8 SECTION 01 35 23 SAFETY REQUIREMENTS
a. Part 3.4 SAFETY MEETINGS, A.,REVISE the last sentence which states Document and submit meeting minutes to the Contracting Officer within one day after the meeting to read Contractor Quality Control Daily Reports shall record documentation of each meeting taking place and be available to the Contracting Officer Representative upon request.
b. Part 3.4 SAFETY MEETINGS, B., DELETE Part B. in its entirety.
ITEM NO. G-9 SECTION 01 40 00 QUALITY REQUIREMENTS
ADDM-1, Page 4
a. Part 1.4 SUBMITTALS, E. and F. DELETE Part E. and Part F. in their entirety.
ITEM NO. G-10 SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
a. Part 3.5 OPERATION, TERMINATION, AND REMOVAL, C., DELETE Substantial Completion from the sentence and replace with Final Completion. Part D, DELETE or no later than Substantial Completion from the first sentence.
ITEM NO. G-11 SECTION 01 67 00 PRODUCT REQURIEMENTS
a. DELETE Section 01 67 00 in its entirety.
ITEM NO. G-12 SECTION 01 73 40 EXECUTION
a. Part 1.1 SUMMARY, A.6. DELETE item 6. Starting and adjusting.
b. Part 1.2 SUBMITTALS, D. DELETE item D. Quantity Surveys in its entirety.
b. Part 3.5 INSTALLATION, C., DELETE Substantial Completion from the sentence and replace with Final Completion.
c. Part 3.6 PROGRESS CLEANING, E., DELETE Substantial Completion from the sentence and replace with Final Completion. Part G. DELETE Substantial Completion from the sentence and replace with Final Completion.
d. Part 3.7 PROTRECTION OF INSTALLED CONSTRUCTION, A., DELETE Substantial Completion from the sentence and replace with Final Completion.
ITEM NO. G-13 SECTION 01 77 00 CLOSEOUT PROCEDURES
a. Part 1.1 SUMMARY, A.3., DELETE Substantial Completion
b. Part 1.3 CLOSEOUT SUBMITALS, A.3.4., DELETE items 3. (temporary facilities removal) and 4. (Complete final cleaning requirements) in their entirety.
b. Part 1.4 FINAL INSPECTION, SUBSTANTIAL COMPLETION AND ACCEPTANCE
PROCEDURES, DELETE SUBSTANTIAL COMPLETION. Part 1.4.B., DELETE Letter of Substantial Completion from the sentence.
c. Part 1.5 PERMIT CLOSURE AND TRANSFER, B., DELETE substantial completion and from the sentence.
d. Part 1.6 WARRANTIES, A., DELETE other than date of Substantial Completion from the sentence.
e. Part 3.1 FINAL CLEANING, B., DELETE for certification of Substantial Completion. Part e., DELETE and ready for occupancy.
ITEM NO. G-14 SECTION 01 77 00 CLOSEOUT PROCEDURES
a. Part 1.6, WARRANTIES, ADD Part C. Construction Warranty for workmanship shall be based on date of final acceptance of the work and remain in effect for one year.
END OF ADDENDUM