This Statement of Work (SOW) details the installation of four Elkay water dispensers at the VA Palo Alto Health Care System (VAPAHCS) in Building 520. The project requires the contractor to provide all necessary personnel, equipment, tools, and materials to install surface-mounted bottle filling stations, including mounting stainless steel stand-offs, connecting water supply and waste lines, and providing line covers. The contractor must complete the installation within 30 calendar days, coordinate work with the Contracting Officer's Representative (COR) to minimize disruption to residents, follow applicable health care and safety codes, and provide a one-year warranty on the installation. Additional requirements include obtaining daily security badges, working during normal business hours (8:00am - 4:30pm Monday-Friday), and providing project management, technical support, and manufacturer documentation upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment - VAAR 852.219-75 VA Notice of Limitations on Subcontracting JAN 2023 DEVIATION.pdf | ||
| Attachment - RFQ 36C26126Q0084_1.docx | DOCX document | |
| Attachment - Service Contract Act WD No. 2015-5623 07-07-2025.pdf | ||
| 36C26126Q0084_2.docx | DOCX document | |
| Attachment - REQUEST FOR INFORMATION RFI FORM.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1.0 General Intent
1.1 The contractor must provide personnel, equipment, tools, materials, supervision, and other items and services necessary to install 4 Water Dispensers in Bldg. 520 located at VA Palo Alto Health Care System (VAPAHCS), 3801 Miranda Ave, Palo Alto, CA 94304.
1.2 The contractor must perform to the standards in this contract. This project shall take no longer than 30 calendar days from the start of on-site work after parts are received.
1.3 This project shall be coordinated with the appointed COR to insure minimal impact to resident’s day to day activities and minimal noise. Scheduling of work shall be at the convenience of the VAPAHCS.
2.0 General Information and Requirements
2.1 The objective of this project is to install 4 Water Dispensers in Bldg. 520 located at VA Palo Alto Health Care System (VAPAHCS), 3801 Miranda Ave, Palo Alto, CA 94304.
2.2 The contractor shall provide operation and maintenance instructions, and manufacturer documentation at the completion of the project. Manufacturer documentation and maintenance schedule to be provided in close out documents.
2.3 The contractor shall provide tools, equipment, and personal protective equipment necessary to complete this project as deemed by industry standards, this SOW, all related specifications, applicable code requirements, and site policy.
2.4 The contractor shall provide daily cleanup and securing of work site, including securing tools and equipment. Disposal of all waste and debris is at the contractor’s own expense.
2.5 The contractor will warranty all work on installation for (1) year upon final acceptance.
2.6 The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses.
2.7 All work shall be coordinated with the COR assigned to this project and only commence once approved.
2.8 Badges: Contractor will obtain required ID badges for all employees used on project at start of each workday; Report the COR for escort to the station police service for sign in and badge issuance.
2.9 Security: The contractor and their personnel shall be subject to the same Federal laws, regulations, standards, and VA policies as VA personnel regarding information and information system security.
2.10 Schedule: Normal work hours will be 8:00am – 4:30 pm Monday-Friday excluding Government holidays unless otherwise approved by the COR. Any request to utility shutdowns must be requested in writing at a minimum of 14 days prior to the requested day of shutdown.
2.11 Codes and Standards: The Contractor shall follow applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, Lock-out-Tag-out, Rules of Station, NFPA, and etcetera. If any code/standard is found to be contradictory; the authority having jurisdiction (COR) shall make the final determination and work shall proceed at no additional cost to the Government.
2.12 Storage area laydown is the only support offered for this project.
3.0 Specific Tasks
3.1 The contractor shall provide all supervision, administrative and technical support, labor, subcontractors, tools, transportation, materials, supplies and equipment. The contractor shall plan, schedule, and ensure effective completion water dispenser installation.
3.2 The contractor will conduct the following repairs:
Bldg. 520 3801 Miranda Ave, Palo Alto, CA 94304
1. The contractor will provide project management support for duration of project.
2. The contractor will provide labor to install four (4) owner furnished Elkay EZ8WSSMC Surface mount bottle filling stations.
3. The contractor will provide four (4) 14-gauge T304 stainless steel stand-offs 6” in depth to mount to wall and for the Elkay bottle filling stations to mount to stand-off.
4. The contractor will furnish and install a water supply line from bottle filling station to existing sink supply line adjacent to the fill station. Cut necessary holes through the cabinet to allow installation. All tie-ins to existing supply line to be on the existing cold-side water stub out.
5. The contractor will furnish and install the waste line from bottle filling station to existing sink waste line adjacent to the fill station. Cut necessary holes through the cabinet to allow installation. All tie-ins to waste line to be on existing sink waste stub-out.
6. The contractors will provide covers for waste and supply lines from stand-off to existing cabinets.