Attachment-R_Cost_Estimate_Form.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- HAFC_BITH_WAYSIDES Federal contract opportunity
- Solicitation number
- 140P2124R0043
About this file
This document is a cost estimate form, likely an attachment to a federal solicitation or contract. It provides a detailed breakdown of estimated costs for various line items related to the "BITH - Wayside Planning, Design, Fabrication" project. The line items include project management, proposals and layouts, proofs/samples/prototypes, exhibit structures, display objects and specialty elements, graphic panels, audio description, project closeout, shipping, and installation. Each line item includes estimated material and labor costs. The document appears to be a template for the contractor to provide pricing information. It does not contain any details about the specific federal contract opportunity, other than referencing the related solicitation number "140P2124R0043" for the "HAFC_BITH_WAYSIDES" project. The document does not provide an overview of the project requirements or objectives.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gov't Est
| Attachment R: BITH - Wayside Planning, Design, Fabrication - Cost Estimate Form | |||
| PROJECT MANAGEMENT | $0.00 | ||
| PROPOSALS and LAYOUTS | $0.00 | ||
| PROOFS/SAMPLES/PROTOTYPE | $0.00 | ||
| EXHIBIT STRUCTURES | $0.00 | ||
| DISPLAY OBJECTS & SPECIALTY | $0.00 | ||
| GRAPHIC PANELS | $0.00 | ||
| AUDIO DESCRIPTION | $0.00 | ||
| PROJECT CLOSEOUT | $0.00 | ||
| SHIPPING | $0.00 | ||
| INSTALLATION | $0.00 | ||
| TRAVEL | $0.00 | ||
| TOTAL | $0.00 |
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
$0.00
TOTAL Project Management $0.00
| PROPOSALS and LAYOUTS | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount |
| Designer | hours @ | $0.00 |
| Writer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Proposals and Layouts $0.00
| Proofs/Samples/Mock-ups/Prototypes | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Prototype 1/2 scale (one per tactile element) | each | $0.00 | |||
| Full Size Proofs (2 per ex: 1 for park + 1 for COR) | ea | $0.00 | |||
| Sample Materials | sets | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Samples $0.00
| Exhibit Structures/Bases | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| 36x48 upright wall mounted frame for existing kiosk | ea | $0.00 | |||
| 36x24 low profile | ea | $0.00 | |||
| 36x48 double in-line | ea | $0.00 | |||
| 36x48 tri-sided kiosk | ea | $0.00 | |||
| pedestal base for tactile | ea | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| exhibit spec-fabrication | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Exhibit Structures $0.00
| Display Objects and Specialty Elements | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Tactile above 10" x 10" | ea | $0.00 | |||
| Tactile at or below 10" x 10" | ea | $0.00 | |||
| Illustration | ea | $0.00 | |||
| 2D map | ea | $0.00 | |||
| 3D map | ea | $0.00 | |||
| Photos | ea | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Cartographer - 2D Map | hours @ | $0.00 | |||
| Illustrator | hours @ | $0.00 | |||
| Exhibits Specialist Fabrication | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL DO and SE $0.00
| Graphic Panels | |||||
| MATERIALS: | qty. | unit | dig output | amount | |
| 36x48 Double-Sided Aluminum | ea | $0.00 | |||
| 36x24 Double-Sided Aluminum | ea | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibits Specialist Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Audio Description and Translations | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Misc. | ea | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | |||
| LABOR | x | rate | amount | |
| Audio Describer | hours @ | $0.00 | ||
| Spanish Translations | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing | job @ | $0.00 | |||
| Shipping | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Spec - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
INSTALLATION
| TRAVEL | qty. | unit | unit cost | amount | |
| Air Fare | job @ | $0.00 | |||
| Per Diem | days @ | $0.00 | |||
| Per Diem - Travel Days | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| Rental Car and Gas | days @ | $0.00 |
| Materials/Misc. Concrete, Weights, and Equipment Rental | job @ | $0.00 |
| Identify Items included in costs | ||
| TOTAL MATERIALS | crew | $0.00 |
| LABOR (Contractor to propose number needed) | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| Exhibit Spec - Laborer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Installation $0.00
| TRAVEL | |||||
| Post Award | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Air Fare | job @ | $0.00 | |||
| Per Diem | days @ | $0.00 | |||
| Per Diem - Travel Days | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| Rental Car and Gas | days @ | $0.00 | |||
| Misc. | job @ | $0.00 |
TOTAL MATERIALS team $0.00
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| Writer | hours @ | $0.00 | |||
| Designer | hours @ | $0.00 | |||
| Audio Describer | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
Total Travel $0.00
File details come from the government source that posted it. Updated .