This is a detailed price breakdown attachment for a construction services solicitation issued by the District of Columbia Department of General Services for a compartmented access area project at the Marion S. Barry, Jr. Building for the Metropolitan Police Department. The project encompasses approximately 422 square feet of construction work on the sixth floor of the building located at 441 4th Street NW, Washington, DC, and includes selective demolition, interior partitioning, flooring installation, ceiling systems, wall finishes, door and hardware installation with security access controls, HVAC systems, electrical systems with lighting and power distribution, telecommunications cabling, fire alarm systems, and radiofrequency and electromagnetic shielding. A mandatory pre-bid conference and site visit is scheduled for March 2, 2026, at 10:00 AM, with written questions due by March 4, 2026, at 4:00 PM, and bids due by March 16, 2026, at 12:00 PM. The contract term extends from Notice to Proceed through a Substantial Completion Date of June 1, 2026, and Final Completion Date of June 30, 2026, with liquidated damages of $500 per day for failure to meet the Substantial Completion Date.

The price breakdown is organized by MasterFormat construction divisions and requires contractors to submit detailed cost estimates for labor, materials, and overhead. The estimated project budget is approximately $287,500 based on the detailed price breakdown provided, though the final contract value will be determined by the lowest responsive and responsible bid. The solicitation mandates a 35 percent minimum allocation of contract work to Small Business Enterprises or Certified Business Enterprises, with enhanced credit multipliers available for resident-owned businesses and disadvantaged businesses under D.C. Law 24-39. Certified Business Enterprise preferences apply with bid reductions ranging from 2 percent to 12 percent depending on certification type. Contractors must comply with Davis-Bacon prevailing wage requirements and the Living Wage Act minimum of $17.50 per hour, increasing to $17.95 per hour on July 1, 2025, with First Source Employment Agreement requirements mandating 51 percent District resident hiring. Insurance requirements include Commercial General Liability of $1,000,000 per occurrence, Automobile Liability of $1,000,000, and Workers' Compensation insurance, and contractors must submit a 5 percent bid bond or cashier's check guarantee and evidence of ability to furnish Performance and Payment Bonds equal to 100 percent of the contract amount.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Construction Services for MPD Compartmented Access Area
To Be Completed by ContractorTo be completed by DC Government
DESCRIPTIONProposalCapitalIneligibleComments
Division 01General Requirements$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 02Existing Conditions$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 03Concrete$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 04Masonry$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 05Metals$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 06Wood, Plastics, Composites$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 07Thermal and Moisture Protection$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 08Openings$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 09Finishes$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 10Specialties$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 11Equipment$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 12Furnishings$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 21Fire suspension$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 22Plumbing$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 23Heating, Ventilation and Air Conditioning$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 26Electrical$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 27Communications$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 28Electronic Safety and Security$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Division 31Earthwork$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Sub Total$ - 0$ - 0$ - 0
Allowances$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Grand Total$ - 0$ - 0$ - 0

Sheet2

42500
12375
25250
4500
16625
12375
40250
59000
5500
10000
18250
15500
19750
5625
287500