Attachment_B_-_Specifications.pdf

PDF 2 MB Posted

Attached to
Construction Services for MPD Compartmented Access Area in Marion Barry Building
Solicitation number
DCAM-26-CS-IFB-0004
Issued by
District of Columbia

About this file

This is a specifications attachment for a construction services solicitation issued by the District of Columbia Department of General Services for the Metropolitan Police Department's compartmented access area at Marion S. Barry, Jr. Building located at 441 4th Street NW, Washington, DC 20001. The specifications document outlines detailed construction standards and requirements for the project, including acceptable and unacceptable wall sealing methods, open storage construction standards, perimeter air duct penetration details, acoustic wall construction specifications, and door requirements. The document provides visual references and technical guidance to ensure contractors understand the quality standards expected for wall finishes, including requirements that walls be uniformly finished and painted from true floor to true ceiling, sealed where walls abut floor pans, and that all wall penetrations be properly sealed. The specifications emphasize acoustic rating compliance and continuous wall assembly integrity as critical components of the construction work.

The specifications document serves as Attachment B to the Invitation for Bids and provides the technical framework by which contractors must execute the compartmented access area construction. These detailed specifications work in conjunction with Attachment A (Drawings) to define all products, materials, and construction methodologies required for project completion. The document includes multiple reference standards and typical construction details to guide contractor performance and ensure consistency with District of Columbia Department of General Services standards for federal government construction projects.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOVERNMENT OF THE DISTRICT OF COLUMBIA

DEPARTMENT OF GENERAL SERVICES

ACCEPTABLE WALL SEALING

[ATTACHMENT WILL APPEAR ON THE FOLLOWING PAGE]

UFC 4-010-05

26 May 2023

Figure 3-6 Wall Finish

UNACCEPTABLE

• Wall not uniformly finished and painted.

• Wall assembly does not meet acoustic rating

- Wall not continuous and sealed where wall abuts floor pan.

• Wall penetrations not sealed.

UNACCEPTABLE

• Not uniformly finished and painted.

• Gap between finished and unfinished GWB

• Gap between unfinished GWB and duct penetration

• Not finished and painted and the penetrations are not sealed and finished.

ACCEPTABLE

• Wall is true floor to true ceiling

• Wall is sealed where wall abuts floor pan.

• Wall is uniformly finished and painted from true floor to true ceiling

• Wall penetrations are sealed.

OPEN STORAGE CONSTRUCTION STANDARDS

TYPICAL PERIMETER AIR DUCT PENETRATION

STANDARD ACOUSTIC WALL CONSTRUCTION

DOOR REQUIREMENTS

DOOR REQUIREMENTS