Attachment No.3 Bid Form Rev1.pdf

PDF 142 KB Posted

Attached to
Fountain Creek Nature Center ADA
Solicitation number
RFP-24-033
Issued by
El Paso County, Colorado

About this file

This document is a Fee Schedule (Rev 1) for Request for Proposal #RFP-24-033 issued by El Paso County, Colorado for the Fountain Creek Nature Center ADA project. The document provides a detailed line-item breakdown of demolition, grading & erosion control, and site improvement work, with specific quantities for various construction elements. The project involves constructing an ADA-compliant ramp at the Fountain Creek Nature Center, with work anticipated between May 20, 2024, and August 1, 2024. The scope includes removing existing infrastructure, preparing subgrade, installing new concrete pavement, curbs, pipes, drainage basins, and other site improvements.

The fee schedule lists 34 line items across three major categories, with quantities measured in various units such as linear feet (LF), square yards (SY), cubic yards (CY), and lump sum (LS). A force account line item of $15,000 is included, which typically allows for additional unforeseen work or modifications. The document does not explicitly state unit prices for most items, suggesting that bidders will need to provide those details. Key site improvement elements include 383 square yards of 5-inch concrete pavement, 355 linear feet of handrail, various HDPE pipe installations, drainage basins, and the relocation of existing site amenities like bike racks and benches.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE ITEM /

CATEGORY

DESCRIPTION QUANTITY UNIT UNIT

PRICE

EXTENDED

TOTAL

DEMOLITION

1 CLEAR AND GRUB 0.02 AC

2 REMOVE TREE 4 EA

3 REMOVE INLET 5 EA

4 REMOVE PIPE 84 LF

5 REMOVE CONCRETE WALK 281 SY

6 REMOVE CURB AND GUTTER 42 LF

7 REMOVE FENCE 48 LF

8 SAW CONCRETE, 6" 40 LF

9 REMOVE TIMBER CURB 60 LF

10 REMOVE BENCH 2 EA

11 REMOVE & RELOCATE BIKE

RACKS AND TRASH

RECEPTACLE

1 LS

GRADING & EROSION CONTROL

11 SUBGRADE SOIL

PREPARATION 3,348 SF

12 EROSION LOG TYPE 1 (12

INCH)

101 LF

13 AGGREGATE BAG 46.5 LF

14 CONCRETE WASHOUT

STRUCTURE

1 EA

15 SEEDING (NATIVE) 0.02 AC

16 RIP RAP (9 INCH) 4 CY

17 EROSION CONTROL BLANKET 500 SY

SITE IMPROVEMENTS

18 CONCRETE PAVEMENT, 5

INCH 383 SY

19 CONCRETE CURB, 6 INCH 224 LF

20 CONCRETE CURB, 12 INCH 115 LF

21 CONCRETE CURB AND

GUTTER, 6 INCH 27 LF

22 HAND RAIL 355 LF

23 HDPE PIPE, 6 INCH 27 LF

24 HDPE PIPE, 12 INCH 72 LF

25 HDPE PIPE, 15 INCH 50 LF

26 NYLOPLAST DRAIN BASIN W/

24"X36" GRATE 1 EA

27 NYLOPLAST DRAIN BASIN (30

INCH) 1 EA

28 HDPE END SECTION, 12" AND

15" 2 EA

29 TRENCH DRAIN (6 INCH) 37 LF

30 IRRIGATION SLEEVE, 2.5 INCH

HDPE 106 LF

31 NEW BENCH 2 EA

32 MOBILIZATION 1 LS

33 TRAFFIC CONTROL 1 LS

34 FORCE ACCOUNT 1 LS

$15,000.00

TOTAL $

REQUEST FOR PROPOSAL #RFP-24-033

FEE SCHEDULE (REV 1)

File details come from the government source that posted it. Updated .