This document is Addendum #1 for Request for Proposals (RFP) #24-033 issued by El Paso County's Contracts and Procurement Division for the Fountain Creek Nature Center ADA project. The addendum extends the project completion date from August 1, 2024, to September 1, 2024, and adds a line item for traffic control to the bid form. The County will only accept electronic bid proposals through the Rocky Mountain E-Purchasing system, with a requirement that vendors ensure their full response is uploaded prior to the specified due date and time. Contractors are expected to order and install basins, use the parking lot as a staging area, and follow specific guidelines for project execution, including temporary shed relocation and concrete work.
The addendum provides clarifications on various project details, including that the contractor will handle concrete washout, the County will manage public communications, and no landscaping work is required. Contractors must submit a comprehensive proposal including a cover sheet, addendum acknowledgment, required documentation, evaluation criteria, submission form, completed W9, and proof of SAM.gov eligibility. Failure to include any of the specified documentation may result in the submittal being returned as non-responsive. The project involves constructing an ADA-compliant ramp at the Fountain Creek Nature Center, with specific technical requirements such as drilling concrete and installing anchor bolts for handrails.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals #RFP-24-033 Page 1 of 3
THIS ADDENDUM SHALL BECOME A PART OF THE SOLICITATION
AND MUST BE ACKNOWLEDGED
Request for Proposal RFP-24-033 – Fountain Creek Nature Center ADA - dated February 14, 2024
CLARIFICATIONS:
The completion date for this project has been extended from August 1, 2024, to September 1, 2024.
A line item for traffic control has been added to the fee schedule. Please use the updated bid form (Attachment No.3 Bid Form Rev1.pdf) with all proposals.
The 2024 summer event schedule for the Fountain Creek Nature Center has been uploaded for reference (FCNC Schedule.pdf).
Please direct all communication to Jake Harper, Procurement Specialist, for this solicitation going forward. Jake Harper can be reached by email at JakeHarper@elpasoco.com or by phone at 719-520- 6857.
El Paso County will only accept electronic bid proposals submitted through the Rocky Mountain E-Purchasing system. A Submittal Log will be posted after the County has had an opportunity to review and verify the submittals offered to the County.
The original Offer must be received before the due date and time through an electronic package transmitted through the Rocky Mountain E-Purchasing system. The Vendor is responsible for ensuring its Response is posted in its entirety by the due date and time outlined in the solicitation document. No allowances will be provided to those Vendors whose submittal is not uploaded prior to the due date and time outlined in the solicitation.
If the submittal arrives late and/or is not uploaded in its entirety, it will not be included in the electronic lockbox.
ADMINISTRATION:
• The question period has expired
• Responses should follow the Response Format on pages 24-25 and include all responses to all mandatory requirements.
• We will be verifying submittals include the following:
• Submittal properly acknowledged (Cover Sheet)
• Addendum acknowledged
• Required Documentation
• Evaluation Criteria Documentation
• Submission Form
• Completed W9
• Proof of SAM.gov eligibility (certificate of good standing)
El Paso County Contracts and Procurement Division
15 East Vermijo Avenue Colorado Springs, Colorado 80903
REQUEST FOR PROPOSAL RFP #24-033
Addendum #1 – February 28, 2024 mailto:TraciGorman@elpasoco.com
Request for Proposals #RFP-24-033 Page 2 of 3
If a submittal is missing any of the above-mentioned documentation the submittal may be returned to the vendor as non-responsive and be deemed ineligible to participate.
RESPONSE TO QUESTIONS:
1) Is the contractor expected to order basins, or is the County providing basins to be installed?
1A) The contractor is expected to both order and install basins.
2) Where can contractors stage equipment?
2A) The Contractor may use the parking lot as a staging area. Specific location will be determined between the County and Contractor after the contract award. El Paso County has also reached out to the adjoining property owner regarding temporary access to the nature center.
3) Will there be any field trips or events between May 20 and August 1?
3A) See attached nature center schedule.
4) Will there be any summer camps and if so, what are the dates?
4A) See attached nature center schedule.
5) Is the contractor expected to do landscaping after completion or during the project?
5A) The contractor is not expected to complete any landscaping work during the project or upon project completion.
6) Will there be terrain hoppers at this location?
6A) Yes, the nature center currently operates a terrain hopper.
7) Where will washout go?
7A) The contractor is responsible for providing a concrete washout. Location will be determined along with laydown and staging area discussions. The contractor is responsible for proper disposal.
8) Will the shed near the parking lot be temporarily located?
8A) The shed can be temporarily relocated by the Contractor if necessary. The shed must remain accessible to the County. Upon completion of the project, the Contractor shall reinstall the shed.
9) From the plans on sheet C-5, figure 2 C4 C4 – would it be better to drill the 4”plates?
9A) Concrete shall be drilled, and anchor bolts installed which will allow the County to remove the handrail if necessary in the future. The handrails shall not be set directly into the concrete or via sleeve into the subgrade.
10) Is it possible to change the end date? Can it be extended?
10A) The end date shall be revised to September 1, 2024.
Request for Proposals #RFP-24-033 Page 3 of 3
11) Can we add a traffic control line item to the bid form?
11A) A traffic control line item added to bid form. El Paso County has also reached out to the adjoining property owner regarding temporary access to the nature center.
12) Wil the County handle public interface/communications or is the Contractor expected to do so?
12A) The County will conduct public communication regarding construction work at the site.
Signature below indicates that applicant has read all the information provided above and agrees to comply in full.
This addendum is considered as a section of the Request for Proposals and therefore, this signed document shall become considered and fully submitted with the original package.
PRINT OR TYPE YOUR INFORMATION
Company Name: ________________________________________ Fax: __________________________________________________
Address: _______________________________________________ City/State/Zip: _________________________________________
Contact Person: _________________________________________ Title: _________________________________________________
Email: _________________________________________________ Phone: ________________________________________________
Authorized Representative’s Signature: ___________________________________________________ Date: _____________________
Printed Name: __________________________________________ Title: _________________________________________________
Email: _________________________________________________ Phone: ________________________________________________
El Paso County