ATTACHMENT N - PDAT Summary - IOTA - Elizabethtown.pdf

PDF 139 KB Posted

Attached to
Q702--Elizabethtown Initial Outfitting Transition and Activations (IOTA) Services
Solicitation number
36C77625Q0214
Issued by

About this file

The document is a Position/Task Risk Designation Levels Matrix for a federal contract opportunity related to Elizabethtown Initial Outfitting Transition and Activations (IOTA) Services. The matrix outlines 17 specific tasks across project management, design, acquisition planning, relocation, activation, and warehousing services, all designated at a LOW sensitivity level. The document includes a comprehensive list of 25 sample labor categories mapped to these tasks, with risk designations ranging from Low (NACI) to Moderate (MBI) and High (BI). Key labor categories include Project Director, Project Manager, Acquisition Specialist, Designer, Construction Manager, and Engineer, with most positions categorized at the LOW sensitivity level.

View the file

Other files

File Type Posted
ATTACHMENT R- Pricing Worksheet - Elizabethtown- REV1.xlsx XLSX spreadsheet
36C77625Q0214 0002.docx DOCX document
Questions and Answers Elizabethtown IOTA - UPDATED.docx DOCX document
36C77625Q0214 0001.docx DOCX document
Questions and Answers Elizabethtown IOTA.docx DOCX document
S02 - 36C77625Q0214_1 - RFQ.docx DOCX document
ATTACHMENT R- Pricing Worksheet - Elizabethtown.xlsx XLSX spreadsheet
ATTACHMENT L - 6500.6 Appendix A.pdf PDF
Attachment A - Elizabethtown IOTA - Final PWS.pdf PDF
ATTACHMENT M - QASP DRAFT.pdf PDF
ATTACHMENT K - Procurement Package Template 11.6.2024.pdf PDF
ATTACHMENT O - VSC Security Package 3.4.2024.pdf PDF
ATTACHMENT I - Proposed FTE Report.xlsx XLSX spreadsheet
ATTACHMENT H - Integrated Move Plan Template.xlsx XLSX spreadsheet
ATTACHMENT E - Change Management Plan and Log Template.xlsx XLSX spreadsheet
ATTACHMENT D - Risk Management Plan and Register Template.xlsx XLSX spreadsheet
ATTACHMENT B - Travel Authorization Request.pdf PDF
ATTACHMENT Q - Elizabethtown Rooms Contents List.xlsx XLSX spreadsheet
ATTACHMENT P - Wage Determination 2015-4681.pdf PDF
ATTACHMENT J - Furniture IDIQ Templates.pdf PDF
ATTACHMENT G - Contents Acq Plan Template 9.21.2023.xlsx XLSX spreadsheet
ATTACHMENT F - WBS Template.pdf PDF
ATTACHMENT C - Contract Staff Roster.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POSITION/TASK RISK DESIGNATION LEVELS MATIX

TASK TASK DESCRIPTION POSITION SENSITIVITY LEVEL

(LOW/NACI),

(MODERATE/MBI),

(HIGH/BI)

16.1 Comprehensive Project Management Services LOW

16.2 Comprehensive Interior Design, FF&E and Space

Planning Services

LOW

16.3 Concept of Operations (CONOPS) and Transition Planning LOW

16.4 Acquisition Planning Services LOW

16.5 Acquisition Packages Development LOW

16.6 Relocation of Reuse and Personnel Files LOW

16.7 Activation Services and Post Occupancy Support LOW

16.8 Staff Training and Orientation LOW

17.1 Warehousing and Warehousing Management Services LOW

***Sample Labor Categories under the specific Tasks listed above

LABOR CATEGORY LOW

(NACI)

MODERATE

(MBI)

HIGH

(BI)

Administrative Assistant X

Database Developer X

Project Director X

Project Manager X

Quality Assurance Manager X

SharePoint Manager X

IT Specialist X

Scheduler X

StratCom Manager X

Transition Planner X

Designer X

Equipment Planner X

Acquisition Project Manager X

Acquisition Specialist X

Warehouse Laborer X

Warehouse Supervisor X

BMET X

Installer – FF&E X Relocation Supervisor X

Trainer X

Truck Driver X

Construction Laborer X

Construction Manager X

Engineer X

File details come from the government source that posted it. Updated .