This is a Design-Build Agreement Form for the New River Terrace Recreation Center issued by the District of Columbia Department of General Services (DGS) on behalf of the Department of Parks and Recreation (DPR). The project involves comprehensive design-build services for a new recreation center located at 500 36th Street NE, Washington, DC 20019 (Ward 7, Lot 5017/0137, 0.22 acres). The Design-Builder must provide all design, preconstruction, and construction services to deliver a fully operational, code-compliant facility including flexible multipurpose community spaces, fitness studio, indoor half basketball court, technology lounge, support amenities (kitchenette, staff breakroom, restrooms, storage), complete building systems (HVAC, electrical, fire protection, plumbing, security, access control), site improvements, landscaping, ADA accessibility, and exterior amenities including a community gardening area. The project has a total budget of $18,000,000, with scheduled Substantial Completion by July 6, 2029, and Final Completion by October 9, 2029. The contract includes an Administrative Term expiration date of February 8, 2030. The Design-Builder must submit the Existing Conditions Assessment Report within 12 weeks of Notice to Proceed, Concept Design within 12 weeks, Schematic Design documents, Design Development Documents, and GMP Basis Project Documents by January 2028. Key preconstruction deliverables include geotechnical surveys, environmental site assessment, zoning and historical analysis, utility surveys, programming documents, cost estimates, and a detailed baseline schedule.

The compensation structure includes an Initial NTE amount to be determined and a Design-Build Fee comprising a base component (60 percent) and an at-risk component (40 percent), along with a lump-sum general conditions cost and preconstruction fee (15 percent of base Design-Build Fee). The GMP includes specified allowances: Permit Allowance ($250,000), Public Art Allowance ($100,000), Utility Allowance ($75,000), Public Space Improvements Allowance ($100,000), and Owner Allowance ($1,000,000), with contingency to be determined at GMP execution. Liquidated damages are $500 per day for failure to meet completion dates, and a disincentive fee of $7,500 plus $500 per day applies for failure to timely submit required deliverables. Key Personnel replacement carries a cost of $25,000 per replacement. The project requires LEED Gold certification minimum, Net Zero Energy design with an Energy Use Intensity (EUI) target of 20 or less, compliance with DC Energy Code (zEPI of 30 or lower), all-electric building systems, and solar-ready roof design. An Add-Alternate for rooftop gathering space design, engineering, and permitting is available, which may be paused or terminated by DGS at design milestones if costs exceed the project budget. The Design-Builder must obtain all required permits, comply with DC Building Code amendments (2017), provide 40-year life cycle cost analyses for HVAC and other major systems, and develop a subcontracting plan identifying Local, Small, and Disadvantaged Business Enterprise participation. If the Department and Design-Builder cannot reach agreement on the GMP or schedule, the Department may terminate the agreement and retain the Design-Builder's trade subcontracts and architect agreements, with the Design-Builder forfeiting 50 percent of the preconstruction fee.

View the file

Other files

File Type Posted
Attachment_Y_-_Campaign_Finance_Reform_Act_Self-Certification.pdf PDF
Attachment_X_-_DGS_Standard_Specifications_&_Owner's_Projects_Requirments.pdf PDF
Attachment_V_-_Building_Information_Modeling_(BIM)_Guide.pdf PDF
Attachment_U_-_DGS_Project_Turnover_Protocol.pdf PDF
Attachment_T_-_Payment_&_Performance_Bond.pdf PDF
Attachment_S_-_Certification_to_Furnish_Performance_and_Payment_Bond.pdf PDF
Attachment_R_-_Equal_Employment_Opportunity_Policy_Statement.pdf PDF
Attachment_Q_-_Release_of_Lien_Forms.pdf PDF
Attachment_P_-_Conflict_of_Interest_Disclosure_Statement.pdf PDF
Attachment_O_-_Bid_Guaranty_Certification.pdf PDF
Attachment_N_-_Form_of_Notice_to_Proceed_and_Letter_Contract.pdf PDF
Attachment_L_-_Past_Performance_Evaluation_Form.pdf PDF
Attachment_K_-_Living_Wage_Act.pdf PDF
Attachment_J_-_First_Source_Employment_Agreement_and_Plan.pdf PDF
Attachment_I_-_SBE_Subcontracting_Plan.pdf PDF
Attachment_H2_-_Standard_Contract_Provision_Architectural_&_Engineering.pdf PDF
Attachment_H1_-_Standard_Contract_Provision_Construction_Contracts.pdf PDF
Attachment_F_-_Bid_Bond_Form.pdf PDF
Attachment_E2_-_Title_29_CFR_5.5_Davis_Bacon_Provision.pdf PDF
Attachment_E1_-_Davis-Bacon_Wage_Determination.pdf PDF
Attachment_D_-_Tax_Certification_Affidavit.pdf PDF
Attachment_C_-_Offeror's_Certification_Form.pdf PDF
Attachment_B_-_Form_of_Offer_Letter.pdf PDF
Attachment_A3_-_DPR_Lighting_Guideline_2024.pdf PDF
Attachment_A2_-_DPR_Tree_Design_and_Planting_Guidelines.pdf PDF
Attachment_A1_-_Specifications_For_Recreation_Centers_Facilities.pdf PDF
DCAM-26-CS-RFP-0006_New_River_Terrace_Recreation_Center.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BUILD AGREEMENT

FOR

THE NEW RIVER TERRACE RECREATION CENTER

BY AND BETWEEN

THE DEPARTMENT OF GENERAL SERVICES

AND

[NAME OF CONTRACTOR]

CONTRACT NUMBER: DCAM-26-CS-RFP-0006

PROJECT INFORMATION

A. PROJECT SUMMARY

1. Project Name:

Design-Build Services for the New River Terrace Recreation Center

2. Project Address: 500 36th Street NE, Washington, DC 20019

3. Agreement Type:

Design-Build with Guaranteed Maximum Price

4. Client Agency:

Department of Parks and Recreation

(“DPR”)

5. Design-Builder: [INSERT DESIGN-BUILDER]

6. Agreement Amounts:

i. Initial NTE: [INSERT AMOUNT]

ii. Project Budget:

$18,000,000.00

7. Design-Builder Compensation:

i. Design Fee (including Construction Administration):

ii. Design-Build Fee:

a. Base Design-Build Fee:

(60% of Design-Build Fee)

b. At-Risk Design-Build Fee:

(40% of Design-Build Fee)

iii. Lump Sum General Conditions Cost:

iv.

Allowances (see Exhibit Z for allowances included in the NTE Amount):

a. Permit Allowance, $250,000,00;

b. Public Art Allowance, $100,000.00

c. Utility Allowance, $75,000.00

d. Public Space Improvements Allowance, $100,000.00; and

e. Owner Allowance, $1,000,000.00.

v. Preconstruction Fee (15% of the Base Design-Build Fee)

vi. Contingency: To be determined at GMP

8. Liquidated Damages: $500.00 per day

9. Disincentive Fee for Failure to Timely Submit Deliverables:

$7,500.00 plus $500.00 per day, per deliverable

10. GMP Basis Project Documents Submission Date:

January 2028

11. Substantial Completion Date: July 6, 2029

12. Final Completion Date: October 9, 2029

13. Administrative Term Expiration Date: February 8, 2030

14. Letter Contract (if applicable):

Period of Performance:

[Date of Letter Contract through Execution of Contract]

NTE Amount: [TBD]

15. GMP Basis Project Documents: Design Development Documents

16. Key Personnel Replacement: $25,000.00 per replacement

17. Assumptions and Clarifications: (Exhibit W)

DESIGN-BUILD AGREEMENT

NEW RIVER TERRACE RECREATION CENTER

DCAM-26-CS-RFP-0006

THIS AGREEMENT (“Agreement” or “Contract”) is made by and between the DISTRICT OF COLUMBIA GOVERNMENT (the “District”), acting by and through its DEPARTMENT OF GENERAL SERVICES (the “Department” or “DGS” or “Owner”), and [NAME OF CONTRACTOR] a company duly organized under the laws of the District of Columbia, and with a place of business at [Address] (the “Design-Builder” or “Contractor” and collectively with the Department, the “Parties”).

RECITALS

WHEREAS, the Department issued a Request for Proposals (the “RFP”) dated [Insert Date], to engage a design-builder to prepare a design for and to construct and complete the work at the New River Terrace Recreation Center, located at 500 36th Street NE, Washington, DC 20019 (the “Project”); and

WHEREAS, the Department intends to implement the Project through a design-build approach. The scope of work for the Project will be divided into two phases: (i) the design and preconstruction phase; and (ii) the construction phase; and

WHEREAS, the Department requires that the Project be completed no later than July 6, 2029 (the “Substantial Completion Date”); and

WHEREAS, the Design-Builder submitted a proposal entitled “Proposal for Design- Build Services for the New River Terrace Recreation Center – DCAM-26-CS-RFP-0006,” dated [DATE OF PROPOSAL] to provide design-build services for the Project; and

WHEREAS, the Department retained the Design-Builder to provide design-build services for the Project, which is to include design, preconstruction, and construction, services for the New River Terrace Recreation Center; and

WHEREAS, the Design-Builder will provide the architectural and engineering (“Architectural/Engineering” or “A/E”), construction, and related services necessary to complete the Project, subject to the terms and conditions set forth in this Agreement; and

WHEREAS, the Department has retained the services of a Contracting Officer’s Technical Representative (“COTR”), and a program manager (the “Program Manager” or “PM”) to advise it concerning the Project; and

WHEREAS, the Department has established a budget and the Design-Builder will conduct its work in accordance with an underlying budget for the Project, which includes but is not limited to all design fees, hard and soft construction costs, fees, general conditions of the Design-Builder, and allowances, until achieving Final Completion (such budget, the “Project Budget”); and

WHEREAS, the Department and the Design-Builder entered into a letter contract dated [DATE OF DGS EXECUTION OF LETTER CONTRACT] (the “Letter Contract”) pursuant to which the Design-Builder was authorized to proceed with certain design and preconstruction services in furtherance of the Project (if applicable).

NOW, THEREFORE, the Department and Design-Builder, for the consideration set forth herein, mutually agree as follows.

DEFINITIONS

Section 1.1. Administrative Term.

The Agreement shall have an administrative term (the “Administrative Term”) that runs from the effective date of the notice to proceed to the Administrative Term Date set forth in the Project Information Section above. In addition, within this time the Design-Builder shall execute and submit a Final Release of Liens and Claims in a form and format required by a Contracting Officer (“CO” or “Contracting Officer), inclusive of providing the Department with a complete set of any product manuals (“O&M”) and training videos, if applicable. The Administrative Term is established for the sole purpose of permitting the Department’s Office of the Chief Financial Officer (“CFO”) to process payments in the event any payments become due. Notwithstanding the foregoing, nothing herein shall be construed to extend the Substantial Completion Date, extend the Final Completion Date, or limit the Department’s ability to assess liquidated damages thereon.

Section 1.2. Agreement.

The terms “Agreement” or “Contract” shall mean this entire, integrated agreement between the Department and the Design-Builder with respect to the Project, consisting of this document and the Exhibits thereto, including but not limited to the Standard Contract Provisions (Construction Contracts and Architectural/Engineering Services Contracts), the construction documents released for the Design-Builder’s use and any change orders, contract modifications or change directives that have been executed by the Department.

Section 1.3. Client Agency.

The governmental or quasi-governmental entity, represented by the Department, requesting the Project.

Section 1.4. Construction Documents.

The final Drawings and Specifications, as prepared, sealed by the Design-Builder’s architect in accordance with the law, and issued by the Design-Builder for the purpose of obtaining bids from potential trade subcontractors and material suppliers for use in constructing the Project.

Section 1.5. Construction Phase Services.

The services provided throughout the construction phase during which the Design-Builder shall carry out the bulk of the construction and manage the completion of the design for the Project, including construction administration services.

Section 1.6. Cost of General Conditions.

The Cost of General Conditions shall mean the lump sum amount the Design-Builder is entitled to recover for general conditions and is further described in Section 9.2 of this Agreement.

Section 1.7. Contract Documents.

The term “Contract Project Document(s)” refers to one or more components of the Project documents that comprise the Agreement between the Department and the Design-Builder, including any modifications or changes thereof, the drawings and specifications, and any addenda to the RFP issued thereto.

Section 1.8. Design and Preconstruction Phase Services.

The services to be provided under Article 3 constitute the design & preconstruction phase services to be performed by the Design-Builder.

Section 1.9. Drawings.

The drawings are the graphic and pictorial portions of the Contract Project Documents, wherever located and wherever issued, showing the design, locations, and dimensions of the Work, generally including plans, elevations, sections, details, schedule, and diagrams.

Section 1.10. Final Completion.

The point at which Substantial Completion has been achieved, all punchlist items noted at Substantial Completion have been completed and all Project documents the Design-Builder is required to deliver to the Department as a condition to receiving final payment have been delivered.

Section 1.11. Final Completion Date.

The date established in the Agreement by which the Design-Builder shall achieve Final Completion. The Final Completion Date may be modified only by Change Order or Change Directive in accordance with the Agreement.

Section 1.12. Fully Complete.

To undertake all of the Work necessary to fully construct and complete the Project and execute all tasks necessary to obtain the final certificate of occupancy for the Project from the District of Columbia, submit final lien releases from the Design-Builder and Subcontractors and material suppliers, complete all punchlist items to the Department’s approval and sign-off, and cause all representations, warranties, and guarantees to be honored and otherwise fulfill all of the requirements set forth in the Agreement.

Section 1.13. Guaranteed Maximum Price or GMP.

The maximum amount, including, but not limited to, the design-build fee and the Cost of the Work, that will be paid to the Design-Builder to Fully Complete the Project as set forth in Article

4. The Guaranteed Maximum Price (“GMP”) may be modified only by Change Order, Contract Modification, or Change Directive in accordance with the Agreement. The GMP shall be established in the GMP Amendment.

Section 1.14. Hazardous Material.

Hazardous Material includes but is not limited to, any toxic substance or hazardous chemical defined or regulated pursuant to federal, state, or local laws relating to pollution, treatment, storage, or disposal of waste, or protection of human health or the environment. Such laws include, without limitation, the Comprehensive Environmental Response, Compensation and Liability Act, the Resource Conservation and Recovery Act, the Clean Water Act, the Clean Air Act, and laws relating to emission, spills, leaks, discharges, releases, or threatened releases of toxic material. The term Hazardous Materials shall also include petroleum and petroleum by-products.

Section 1.15. Notice to Proceed.

A written notice to proceed, signed by the Department’s Contracting Officer, directing the Design-Builder to proceed with the Project or any portion of the Project (“Notice to Proceed” or

“NTP”).

Section 1.16. Project Schedule.

The schedule for the Project (“Project Schedule”) is agreed upon by the Department and the Design-Builder. Such schedule shall include a baseline schedule as updated periodically by the Design-Builder, approved by the Department. The Project Schedule shall not be changed except by a Contract Modification, Change Order or Change Directive issued by the Department’s CO or Contracting Officer. The Project Schedule shall be in a form and contain such detail as may be agreed upon by the Parties.

Section 1.17. Self-Performed Work.

The parties hereby agree that “Self-Performed Work” means and shall encompass trade work performed by employees of: (1) the Design-Builder; (2) any entity that is a partner or member of the entity comprising the Design-Builder; (3) any entity that controls, is controlled by, or is under common control with the Design-Builder; or (4) any entity that controls, is controlled by, or is under common control with any entity that is part of the Design-Builder. Self-Performed Work is distinguished from trade work performed by subcontractors unaffiliated with the Design-Builder or the entities of which the Design-Builder is comprised.

Section 1.18. Services.

The services to be provided pursuant to the Agreement which shall include the Design & Preconstruction Phase Services and the Construction Phase Services necessary to deliver the Project.

Section 1.19. Specifications.

The Specifications are that portion of the Contract Project documents consisting of the written requirements for materials, equipment, construction systems, standards and workmanship for the Work, and performance of related services.

Section 1.20. Standard Contract Provisions.

The District of Columbia Department of General Services Standard Contract Provisions, General Provisions (Construction Contracts and Architectural/Engineering Services Contracts), as amended, is attached hereto as Exhibit J1 and Exhibit J2 and incorporated herein.

Section 1.21. Subcontractor.

Any person, natural or legal, to whom the Design-Builder delegates the performance of any portion of the Work required by the Agreement. The term “Subcontractor,” used without a qualifier, shall mean a subcontractor in direct contractual privity with the Design-Builder.

“Subcontractors at all tiers” shall mean not only those Subcontractors in direct contractual privity with the Design-Builder and not the Department, but also those performing Work pursuant to sub-subcontracts, and so on. “Subcontractors” shall include both those who are retained to perform labor only and those who are retained both to perform labor and to supply material or equipment. “Subcontractors” shall also include design professionals who are not the Design- Builder’s employees and to whom the Design-Builder delegates any part of its responsibilities under the Agreement, except those references to “trade Subcontractors” shall exclude design professionals.

Section 1.22. Substantial Completion.

Substantial Completion shall mean that all of the following have occurred: (1) the preconstruction, construction, and installation work has been completed with only minor punchlist items remaining to be completed; (2) The Project has obtained a Department of Buildings (“DOB”) Certificate of Occupancy, final DOB Certification of Occupancy shall be received within thirty (30) days of Substantial Completion, and all other required permits or approvals have been obtained; (3) All Operation and Maintenance Manuals have been finalized, submitted, and approved, and shall be submitted to the Department six months prior to Substantial Completion; (4) Required trainings per Turnover Manual have been scheduled within thirty (30) days of the Substantial Completion Date. The Design-Builder shall provide final videotaped recordings within thirty (30) days of the Substantial Completion Date; (5) Draft Warranties have been submitted and approved; (6) The facility and site have been deep cleaned and cleared of any construction debris; (7) Final warranties have been submitted for material and labor for any installed, replaced, or repaired synthetic surfaces at recreation spaces including, but not limited to, the following material types: Pour-in-Place (“PIP”), artificial grass or turf, rubber mulch, and engineered wood fiber; (8) The Project is ready for the Department and DPR to use it for its intended purpose; (9) All equipment, supplies, materials and items to be installed have been installed in accordance with the manufacturer’s specifications and industry standards and have undergone and passed the requisite testing and inspections; (10) Certificates of compliance with impact standards (IPEMA) for synthetic surfaces at recreation spaces have been submitted to the Department; and (11) commissioning is complete, and a final punchlist is documented with completion dates established. “Minor punchlist items” are defined for this purpose as items that, in the aggregate, can be completed within thirty (30) days without interfering with the Department or Client Agency’s normal use of the Project.

Section 1.23. Substantial Completion Date.

The date established herein by which the Design-Builder shall achieve Substantial Completion.

The Substantial Completion Date may be modified only by Change Order, Contract Modification, or Change Directive in accordance with the Agreement.

Section 1.24. Work.

The term “Work” refers to any and all work done in the performance of the services necessary, at any and all phases of the Agreement, to Fully Complete the Project.

GENERAL PROVISIONS

Section 2.1. Letter Contract The Parties acknowledge that certain of the investigation, design, and preconstruction activities described in Article 3 of this Agreement were performed pursuant to the Letter Contract between the Parties. Pursuant to the terms of the Letter Contract, upon execution of this Agreement by the Department (the “Agreement Effective Date”), the Letter Contract shall automatically be incorporated into and shall merge into and be superseded by this Agreement. The Parties agree that any services provided or work performed pursuant to the merged Letter Contract, and prior to the Agreement effective Date, shall be governed by the terms and conditions of this Agreement.

Section 2.2. Term and Termination The period of performance under this Agreement shall commence from the date of execution of the Contract by the Department, unless the Department executes a Letter Contract, in which case the period shall commence from the execution of the Letter Contract, and shall terminate upon the expiration of the Administrative Term or upon termination by the Department pursuant to Articles 5 and 6 of the Standard Contract Provisions (Construction Contracts) and Article 8 of the Standard Contract Provisions (Architectural & Engineering Services Contracts).

Section 2.3. Relationship of Parties.

The Design-Builder accepts the relationship of trust and confidence established with the Department by this Agreement, and covenants with the Department to furnish the Design- Builder’s reasonable skill and judgment and to cooperate with the Program Manager in furthering the interests of the Department. The Design-Builder shall use its best efforts to perform the Work and complete the Project in an expeditious and economical manner consistent with the interests of the Department. The Department shall endeavor to promote harmony and cooperation among the Department, Design-Builder, Program Manager, and other persons or entities employed by the Department for the Project. In performing its duties under this Agreement, the Design-Builder shall at all times use the standard of care used by Design- Builders that construct projects similar to the Project in type, size, and scope in large, urban areas. Whenever the term “competent” is used herein to describe the Design-Builder’s actions or duties, that term shall refer to the level of competence customarily possessed by those Design- Builders that construct projects similar to the Project in type, size, and scope in large, urban areas.

Section 2.4. Confidentiality of Information The Design-Builder shall assure and keep all information and data obtained throughout the performance of the Project whether related to the Agreement, the Work in all of its aspects, the Department, and the Department’s employees confidential, during and following the term of the Agreement and shall not use the information in connection with any other matters; nor shall it disclose any such information to any other person, firm or corporation, unless disclosure is required pursuant to a court order, subpoena or other regulatory authority. The Design-Builder shall not be divulged of confidential information without the individual’s and the Department’s written consent and only in accordance with District’s or Federal laws, codes, and regulations. The Design-Builder and any Subcontractors who utilize, access, or store personally identifiable information as part of the performance of this Agreement are required to safeguard this information and immediately notify the Department of any breach or suspected breach in the security of such information. The Design-Builder and all Subcontractors shall allow the Department to participate in both the investigation of incidents and exercise control over decisions regarding external reporting. The Design-Builder, Subcontractors, and their respective employees working on this Project may be required to sign a confidentiality statement.

Section 2.5. Project Description.

The Design-Builder shall provide design-build services required for the Project. The Project shall be complete, operating, and ready for use on or before the Substantial Completion Date and within the Project’s budget as specified in the RFP Document.

The Design-Builder shall design and construct to best execute the Department of Parks and Recreation (“DPR”) programmatic needs. In general, the Design-Builder will be required to program, fully design, and construct the New River Terrace Recreation Center. The programming, design, construction will include the new recreation center, overall project landscaping, site furnishings, amenities, signage, hardscaping, security, and all improvements to comply with the Americans with Disabilities Act (“ADA”). Without limiting the generality of foregoing, the Design Builder shall be required to provide all management, personnel, design services, labor, materials and equipment necessary to complete the Project. All work shall be code compliant and installed per DGS and DPR standards, specifications, manufacturer recommendations and applicable industry standards.

The Project site is currently a vacant lot.

The existing lot information and zoning data are outlined below:

A. Square / Suffix / Lot: 5017 0137 B. Zoning District: R3, No Overlay District, No Historic District C. Ward: 7 / 7D / 7D04 D. Lot Area: 9583.2 SF (0.22 Acres)

Generally, the Design-Builder’s responsibilities shall include, but will not be limited to, the following:

a) To conduct engagement sessions with DPR/DGS and the Community to understand, detail, and solicit feedback on the requirements for the Project.

b) To confirm the design and construction of the Project in accordance with the RFP Documents, including all applicable attachments.

c) To provide all design, construction, and construction management services necessary to implement the goals of the Project inclusive of, but not limited to, the following:

civil, architectural, electrical, structural, and mechanical design services as required for the Project; construction management services inclusive of budgeting, value engineering (“Value Engineering”), scheduling, Project phasing, Project administration, management, and coordination of subcontractors. Design scope shall also include full design and specifications, with a minimum of two options for basis-of-design for each of the FF&E for GMP pricing.

d) To conduct subsurface investigation work if and as required for the Project.

e) To furnish and provide all materials, management, personnel, equipment, hazardous material abatement, supervision, labor, and other services necessary to complete the Project.

f) To provide the necessary design, consultants, and documentation for all permitting, zoning, historic preservation, and US Commission of Fine Arts (“CFA”) approvals and National Capital Planning Commissioning, as needed. Prior to the installation of a boiler, stationary generator, or any other source of emissions subject to the rules, the Design-Builder must obtain Chapter 2 and Chapter 3 permits, as required by DOEE.

g) To provide move coordination and logistics support for the Project.

h) To complete the transition, installation, and upgrades of the Enteliweb platform, an electronic building automated control system.

Based on the approved plans and specifications, the Design-Builder shall construct the Project.

During the Construction Phase, the Design-Builder shall be required to cause the Work to be completed in a manner consistent with the design documents and phasing plan approved by the Department and shall provide all labor, materials, insurance, bonds and equipment necessary to fully complete the Project in accordance with the drawings, specifications, schedule, and budget that are issued for the Project. The Design-Builder shall be responsible for paying for and obtaining all necessary permits and to pay all necessary fees for utility connections and the like.

Community Engagement The Design-Builder will facilitate community meetings throughout every phase of the Project.

The goal of these meetings is to get community feedback on the design process, update them on Project milestones, provide Project logistics, and respond to concerns.

The standard frequency for each community meeting is based on design phases and preconstruction start.

Exterior and Interior Furnishings Design, furnish, and install FF&E for exterior and interior spaces as applicable and as directed by DGS. FF&E for all exterior and interior spaces should be included within the Project budget.

FF&E coordination and installation to be provided by Design-Builder.

Exterior and Interior Signage Design, furnish, and install standard way-finding signage. The Design-Builder shall consider all DGS and DPR Building Standards, standard graphics, and language for interior wayfinding signage.

Exterior Amenities All exterior amenities will be new. Space is limited on the site, and Community feedback will dictate the scope for exterior amenities. At a minimum, an area dedicated for gardening will be required.

Artwork Furnish and install commissioned artwork as required by DGS/DPR. Selected artist/artwork shall be local to the District of Columbia.

Within the Project budget, approximately $100,000.00 should be allocated for artwork as an Allowance. This includes pieces for both interior and exterior exhibitions.

Utilities Design, furnish and install all utilities including, but not limited to, electric, water, sewer, and stormwater management.

Low Voltage and Security Requirements Design, furnish and install security, low voltage, and communication requirements per DGS/DPR’s guidelines. Site security includes, but is not limited to, security cameras, lighting, and fencing. The Design-Builder shall prioritize secure access to the site from all directions.

Coordinate with DGS Protective Services Division (“PSD”) and Office of the Chief Technology Officer (“OCTO”).

DPR Requirements and Code Compliance The Contractor shall follow all DGS and DPR requirements, as well as comply with all current applicable codes recently implemented and/or adopted by Washington, DC, including but not limited to the 2017 District of Columbia Building Code Amendments (DCMR 12A), the 2017 District of Columbia Electrical Code (DCMR 12C), the 2017 District of Columbia Fuel Gas Code (DCMR 12D), the 2017 District of Columbia Mechanical Code (DCMR 12E), the 2017

District of Columbia Plumbing Code (DCMR 12F), the 2017 District of Columbia Fire Code (DCMR 12H), 2017 DC Energy Conservation Code (DCMR 12I), 2017 DC Existing Building Code (DCMR 12J), and the 2017 District of Columbia Green Construction Code (DCMR 12K).

The Contractor shall also follow all applicable State and Federal laws, codes, and regulations.

Americans with Disabilities Act The Design-Builder shall provide appropriate means for those with disabilities to access the site.

The Design-Builder shall meet 2010 ADA standards and the requirements of the Office of Disability Rights. The work must comply with current accessibility guidelines and criteria;

American Disabilities Act/American Disabilities Act Accessibility Guidelines (ADA/ADAAG), International Building Code IBC 2012, Local/State Codes, 504 Rehabilitation Act of 1973, Title 2 of the ADA Act.

Safety and Security Enhancements

a) Install emergency lighting, exit signs, handrails, and stairways.

b) Conduct regular safety inspections and implement necessary upgrades.

A. General Requirements

The Design-Builder shall:

a) Verify existing site conditions and constraints.

b) Coordinate with DGS and all applicable District agencies throughout the Project.

c) Obtain and close out all required permits, approvals, and inspections.

d) Incorporate energy-efficient design strategies, durable and low-maintenance materials, water-efficient fixtures, and sustainable landscaping practices.

e) Deliver a complete, ready-for-occupancy facility.

B. New Facility

The Design-Builder shall design and construct:

a) All site improvements required to support the recreation center, including but not limited to site clearing, grading, preparation, utility connections and coordination, stormwater management systems compliant with District regulations, accessible pedestrian routes from the public right of way to building entrances, exterior lighting and security lighting, landscaping and hardscape appropriate for a public facility.

b) An exterior area dedicated to community gardening, including but not limited to a zone for raised garden boxes, accessible paths of travel and working clearances, suitable water access for gardening, and integration with overall site and landscape design.

c) A building that is structurally sound and suitable for public assembly and recreation use that provides a durable and energy-efficient building envelope, meeting District energy sustainability, life safety requirements, uses materials appropriate for high use public facilities.

d) Interior program spaces which include community flexible and multipurpose spaces that are suitable for community meetings, gatherings, events, classes, workshops, and community programming. The design shall include flexible layout supporting varying group sizes and reconfiguration for varied uses. These spaces shall also include access to storage for furnishing and equipment, and infrastructure to support audiovisual and presentation needs.

e) Fitness and recreation spaces which include fitness studio, and indoor half basketball court. These spaces shall have adequate flooring, lighting, acoustics, clearances, storage for athletic and recreation equipment, and infrastructure for sound and instructional systems.

f) Technology lounge or computer bar. The technology space should have its own designated area for providing technology access for users, workstations or counter style computer bar, power and data connectivity, seating for individual and small group use, and integration with building IT and security systems.

g) Support and amenity spaces which include a kitchenette for light food preparation and serving capabilities, dedicated staff breakroom with kitchen facilities for staff use, public restrooms sized and configured per code occupant load, janitorial storage with required fixtures, and storage for operational use.

h) Complete building systems including but not limited to HVAC systems suitable for varied occupancy and activity levels, energy efficient interior and exterior lighting with controls, electrical distribution and emergency power systems, fire alarm and fire protection systems, plumbing systems supporting program needs and exterior gardening use, technology infrastructure which includes but is not limited to data, wi-fi, and av readiness.

i) Security and access control systems including but not limited to controlled building access points, security and surveillance infrastructure, emergency communication and life-safety systems.

j) Utilize community input to determine what other programmatic requirements should be included. Other program requirements include, but are not limited to, the following:

Dance Studio, Gaming Room, and Seniors Room.

k) The Design-Builder shall design the new River Terrace Recreation Center such that the building roof is capable of supporting a future gathering space, without requiring structural reconstruction or re-permitting of the base building. The base scope should include at a minimum the following;

i. Structural design of the roof to accommodate code-required live loads for an occupiable rooftop gathering space.

ii. The rooftop gathering area shall occupy no more than fifty (50%) of the total roof area.

iii. Roof assembly, waterproofing, drainage, and parapet conditions compatible with future occupiable space.

iv. Coordination of base building systems to avoid conflicts with potential future rooftop use.

v. Design decisions that do not preclude future code-compliant egress, accessibility, or life safety provisions.

vi. Vertical circulation for an occupiable rooftop gathering space.

vii. Confirmation that the base scope design does not create zoning or permitting obstacles to a future rooftop gathering space.

C. Add Alternate No. 001 – Rooftop Gathering Space

Design, Engineering, and Permitting Under this Add-Alternate, the Design-Builder shall provide full design and permitting services for a rooftop gathering space, including but not limited to:

a) Architectural layout and programming of the rooftop space including but not limited to restrooms, storage area, planting and irrigation, built-in cabinets for hosting, etc.

b) The space shall be designed to support community gathering, passive recreation and programmed activities.

c) Structural, mechanical, electrical, plumbing, and fire protection design specific to the rooftop use.

d) Code analysis, life safety, accessibility, and egress design.

e) Guardrails, fall protection, and safety features.

f) Coordination with roof warranty requirements.

g) Design-to-budget checkpoints at each design milestone.

h) Inclusions of the rooftop gathering space in permit submissions and agency reviews.

i) Drawings shall be prepared as a simple coordinated set, with Add-Alternate scope clearly identified.

j) Preparation of construction documents suitable for GMP pricing.

The Add-Alternate design shall include cost estimates at each design milestone. The District of Columbia, acting by and through the Department of General Services, on behalf of the Department of Parks and Recreation (Owner) may pause or terminate Add-Alternate for design services without obligation to proceed with construction at any design milestone if the projected construction cost exceeds the Project budget. Acceptance of Add-Alternate for Design does not obligate the Owner to accept Add-Alternate for Construction.

Construction Under this Add-Alternate, the Design-Builder shall construct the rooftop gathering space in accordance with the approved and permitted documents, including but not limited to:

a) All rooftop finishes, furnishings, guards, and safety features.

b) Required MEP, fire protection, and life-safety systems.

c) Inspections, approvals, and closeout documentation.

Section 2.5.1 Project Sustainability Requirements The Project is required to meet all local and national codes, including but not limited to DC Energy Conservation, DC Green Construction Code, the Green Building Act, etc. The Project will also be required to meet the recent amendment to the Green Building Act, the Greener Government Building Amendment of 2022, which went into effect on March 10, 2023. In addition to the required codes, the project is required to meet the following:

Section 2.5.1.1 LEED and Green Construction Code Requirements: The Project shall be designed in such a way to incorporate, at a minimum, LEED Gold principles. Evaluation will be required to determine if the level of renovation qualifies for LEED certification; if the Project does qualify the District will require the innovation LEED Pilot Credit – Integrative Process for Health Promotion (https://www.usgbc.org/credits/new-construction-core-and-shell-schools-new-construction-retail-new-construction-healthc-106), green roof credits through the Department of Energy and Environment (“DOEE”) Stormwater Retention Credit program and RiverSmart Rooftops Rewards and Rebate program), and Energy Star Certification. The Design-Builder will be responsible for applying for and achieving Energy Star Certification and filing the DOEE Stormwater Retention Credit and RiverSmart Rooftops registration forms. The Design-Builder shall also comply with the recently adopted International Green Construction Code.

Section 2.5.1.2 Net Zero Energy and Energy Consumption Requirements: The District is particularly interested in River Terrace Recreation Center becoming a Net Zero Energy building, and the Department requires the design-build team to use net zero strategies in the building’s design and to attain certification through the International Living Future Institute’s (“ILFI”) Zero Energy Building program.

The building shall be design-built to operate at an annual Energy Use Intensity (“EUI”) of 20 or less. In addition to meeting ILFI Zero Energy certification, this EUI threshold is necessary for DC government to be in compliance with the DC Building Energy Performance Standards (“BEPS”) law. Additional information can be found in the DGS Energy

Management Plan (“EMP”). The EMP follows Mayor Bowser’s 2019 signing of the Clean Energy DC Omnibus Amendment Act of 2018, which established the BEPS that require building owners to meet energy reduction targets by actively improving the energy performance of their buildings over time.

a. In coordination with DGS-Sustainability and Energy Division, the A/E shall monitor and adjust the building’s energy systems for two years after commissioning to ensure the annual EUI score is maintained. The DGS-Sustainability and Energy Management Division’s Solar Program will provide solar technical assistance for designing the roof and other potential areas to solar-ready standards. The Department contemplates entering into a solar photovoltaic (“PV”) power purchase agreement in the future for River Terrace Recreation Center through a separate contract with a solar developer.

Energy Targets The Project shall comply with DC Energy Code Appendix Z2.1.1 such that the Building design shall demonstrate a zEPI of 30 or lower as determined in accordance with Equation

1. Projects will also comply with Appendix Z2.2 thermal energy performance intensities for annual heating and cooling demand. Provide Energy documentation that tracks zEPI, targeted Site and Source EUI at each stage of design.

Employ all-electric building systems in compliance with the Greener Government Buildings Amendment Act and Appendix Z. Electric resistance shall not be deployed as primary heating sources. Heat pump technology is preferred. Ensure all electric ENERGY STAR Appliances (process-related equipment) are incorporated. The Design-Build team shall demonstrate knowledge and/or experience with the DC Energy Code and approach to meeting the energy targets.

HVAC Life Cycle Cost Analysis A life-cycle cost analysis shall be developed to evaluate multiple building HVAC options that include a pathway to Net Zero Energy with options for on-site solar PV. Ensure that Life Cycle Cost Analysis is completed no later than Design Development (“DD”). Use Escalation Rate, Time Period, Operations, and Maintenance Data as recommended by NIST BLCC. Use recommended Occupancy schedules per ASHRAE 90.1. Also consider comparison of operational greenhouse gas (“GHG”) emissions over a 50-year time frame.

Solar Considerations Working with the DGS’s Sustainability & Energy Division (“DGS-SE”) Solar Program, the roof shall be designed to be solar-ready. Solar photovoltaic (“PV”) shall be installed through DGS’s Solar Power Purchase Agreement (“PPA”) Program. The design-build team, in consultation with the DGS-SE Solar Program, needs to design-build the roof to these DGS Solar-Ready Guidelines. The Design-Builder does not need to account for the labor and materials of solar PV module installation as this will be performed by a third-party, though will need to account for the design, materials, and construction of any canopy structure(s) that would support solar PV modules over parking lots or other ground surfaces.

Section 2.5.1.3 Project Compliance with Energy Performance Laws:

Provide a 40-year Life Cycle Cost Analysis, including calculations for GHG emissions, of a Geothermal heat pump system vs. Air Source Heat Pump system. Electric resistance as primary space or water heating is not permitted.

Project shall comply with Greener Government Buildings Amendment Act (“GGBAC”) and Climate Commitment Amendment Act (i.e. no fossil fuel space or water heating equipment is permitted, except for backup power).

Section 2.5.1.4 Design Excellence Criteria Narrative:

Continuing a legacy of outstanding public architecture that was initiated with the founding of the nation, DGS seeks to commission our nation’s most talented architects, landscape architects, interior designers, engineers, and construction professionals to design and construct District facilities of outstanding quality and value. These projects are to demonstrate the value of true integrated design that balances aesthetics, functionality, cost, constructability, durability, and reliability. Additionally, the Project's design will create environmentally responsible and superior public facilities that give contemporary form and meaning to our democratic values. During the Design Phase, the architect/engineer (“Architect/Engineer” or “A/E”) shall develop a design for the Project that is consistent with the District’s Comprehensive Plan, inter-agency goals, and the DGS Design Excellence Program objectives. The Design Phase will include participation in the Design Excellence Peer Review, which will convene three times during the design phase. Twice in the conceptual phase and once in the schematic phase. The peer reviews will focus on discussing the Design Excellence design principles. During the preliminary conceptual design phase, the creation of three preliminary design options will be created, each option will include its own specific budget scenario and schedule. The purpose of the peer review is not to mandate solutions but to highlight opportunities to strengthen the design and fulfill Project requirements.

Section 2.5.1.4 Stormwater Management: The Design-Builder is responsible for meeting all Stormwater Management requirements within the bounds of the project site. Additionally, the Design-Builder shall explore the possibility of the creation of Stormwater Retention Credits through the Department of Energy and Environment (“DOEE”) Stormwater Retention Credit program. The Design-Builder is responsible for completing all the work and documentation required for certification and final approval for Stormwater Management facilities on the Project.

Section 2.6. Contracting Officer’s Technical Representative and Program Manager The Department has engaged a Contracting Officer’s Technical Representative (“COTR”) and Program Manager to provide certain program management functions. Such COTR and Program Manager shall, at all times, be acting solely for the benefit of the Department, not the Design- Builder. The Design-Builder hereby acknowledges and agrees that only a duly authorized and designated Contracting Officer shall have the authority to direct the Contractor to start the Project or to issue change orders, contract modifications, or change directives on the Department’s behalf. The COTR and Program Manager shall not have the authority to modify any of the rights and obligations of the Department or the Contractor pursuant to the proposed Contract, or to issue change orders, contract modifications, or change directives. As of the date that this Agreement is executed, the Department’s duly authorized Contracting Officer(s) is/are set forth in Exhibit H.

Section 2.7. General Description of Design-Builder’s Duties.

Generally, the Design-Builder shall perform the services in a professional workmanlike manner.

The Design-Builder shall supply and furnish at the location where the Work is to be performed all design service, labor, materials, equipment, tools, services, and supervision, and shall bear all items of expense, necessary to complete and satisfactorily perform this Agreement, except such items that the Department, in this Agreement, specifically agrees to supply or furnish to or for the use of Design-Builder. Any labor, materials, equipment, tools, services, or supervision not specifically described in this Agreement, but which may be fairly implied as required thereby or necessary to properly complete the Work, shall be deemed within the scope of work (“Scope of the Work” or “SOW”) and shall be provided by the Design-Builder at Design-Builder’s sole expense.

The Design-Builder will be required to work with the Department and the Project stakeholders through a collaborative design process to advance the programmatic to a fully realized Project in accordance with the available Project budget. The Design-Builder will be required to: (1) engage in extensive pre-design and preconstruction efforts to ensure that the design is developed in a manner consistent with the Department’s goals for the Project (e.g., programmatic, budgetary, schedule and quality); (2) to develop a comprehensive Project phasing; (3) to solicit competitive trade bids for the construction work and to develop an acceptable GMP and corresponding scope and schedule for the work; and (4) to implement the requisite construction and other work necessary no later than the Substantial Completion Date. The Design-Builder will be required to provide move coordination and logistics support. The Design-Builder shall be responsible for all items of cost except for those items set forth in Section 9.7 of this Agreement.

Section 2.8. Warranties and Representations

a) All disclosures, representations, warranties, and certifications the Design-Builder makes in its proposal in response to the RFP shall remain binding and in effect throughout the term of the Agreement. The Design-Builder reaffirms that all such disclosures, representations, warranties, and certifications are true and correct.

b) If any disclosure, representation, warranty or certification the Design-Builder has made or makes pursuant to the RFP or the Agreement, including, without limitation, representations concerning the Design-Builder’s construction or design experience and qualifications, claims or litigation history or financial condition, is materially inaccurate, that shall constitute a material breach of the Agreement, entitling the Department to any and all available remedies.

c) The terms and conditions of this Section 2.8 shall apply during both the Design & Preconstruction and Construction Phases.

Section 2.9. Responsibility for Agents and Contractors.

At all times and during both the Design & Preconstruction and Construction Phases, the Design- Builder shall be responsible to the Department for any and all acts and omissions of the Design- Builder’s agents, employees, Subcontractors, Sub-Subcontractors, material suppliers, laborers, and agents and employees of the Subcontractors, Sub-Subcontractors, material suppliers, and laborers performing or supplying Work in connection with the Project.

Section 2.10 Building Information Modeling. Building Information Modeling (“BIM”) is required to be used throughout the lifecycle of the Project, including all Project phases from Project planning and concept design through construction, as-built, and into facilities management. The BIM requirements are provided as Exhibit S. It is expected by the Department that all team members are to be committed to the use of BIM in the Project, share their ideas of BIM expertise with the team, provide BIM data as requested by other team members, look for cost savings and schedule improvements during the entire Project duration, and endeavor to leave as a legacy a fully updated, as-built, facility management ready building information model.

DESIGN-BUILDER'S DESIGN & PRECONSTRUCTION SERVICES

Section 3.1 Preconstruction Services.

The Preconstruction Phase will start from the issuance of the Notice to Proceed (the “Preconstruction NTP” or “Letter Contract”), or a fully executed Contract through the execution of the GMP amendment (“GMP Amendment”). Offerors are advised that they are required to submit their Proposals premised upon agreeing to the terms of the Preconstruction NTP. To the extent there are any ambiguities or inconsistencies between this RFP, the Standard Contract Provisions (for Construction Contracts and Architectural/Engineering Services Contracts), and the Preconstruction NTP, the order of precedence shall be: (i) the Standard Contract Provisions;

(ii) Preconstruction NTP; (iii) Contract; and (iv) the RFP.

Section 3.1.1. Initial Deliverables. The Design-Builder’s initial task will be to perform a feasibility study with a design narrative to a complete schematic design, develop a phasing plan and budget for the Project. As part of this effort, the Design-Builder shall prepare and provide the following initial deliverables:

Section 3.1.1.1 Existing Conditions Assessment Report

a. Existing Conditions Assessment Report

i. The selected Design-Builder will be required to perform a comprehensive

Existing Conditions Assessment of the project site and document all above and below grade conditions relevant to the proposed development.

b. Charrette Sessions and Survey

i. The Contractor shall facilitate up to two (2) meetings with DGS, DPR, and other Project stakeholders (for example, facilities representatives and community groups) to better understand the requirements of the Project.

These meetings shall include charrette sessions that will allow for creative solutions to the needs of the District and community, as well as avoiding unworkable programming or design. At the end of the charrette sessions and informational meetings, the Contractor shall produce a report summarizing the meetings and its recommendations for the final Project based on those meetings. This shall be known as the Stakeholder Analysis.

ii. The Contractor shall facilitate up to one (1) community meeting. At this meeting, the Contractor shall explain the Project, the reasons for the Study, and solicit feedback from attendees on what program elements they would like to see in the new Recreation Center. The meeting shall be run by the Contractor to encourage maximum participation by the attendees and allow DGS and DPR to understand the community’s priorities.

iii. Note that the meetings, sessions, and charrettes mentioned in this Section

3.1.1.1 (b) shall be separate from regular progress meetings with DGS.

c. Zoning Analysis

i. The Contractor shall review the current zoning regulations in place…