This document includes a solicitation for replacing and improving the HVAC system in Building 12722 at Eglin Air Force Base, Florida. The solicitation is set aside for small businesses and seeks a contractor to completely demolish the existing HVAC system, including air cooled chillers, AHUs, chilled water and hot water piping, and pumps, and install a new complete HVAC system including AHUs, a fully redundant chiller system and pump sets. Offerors must propose using the provided 50 Division Cost Estimate worksheet and provide pricing and past performance information by the closing date of September 30, 2022. The work must be completed within 426 days after notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Replace and Improve HVAC System in Bldg 12722, newest first.
File Type Posted
Questions and Answers .pdf PDF
FA282322R00070002.pdf PDF
Section_L_21 April 2022.pdf PDF
Att 4_FTFA 20-RC03_Drawings_Final_Updated.pdf PDF
FA282322R00070001.pdf PDF
Section_M.pdf PDF
Att 4_FTFA 20-RC03 Drawings.pdf PDF
Solicitation - FA282322R0007.pdf PDF
Att 3_Specifications.pdf PDF
Att 2_WD.pdf PDF
Attachment L6 Cover Letter.pdf PDF
Attachment L2-FRQ.pdf PDF
Attachment L4 Consent Form.pdf PDF
Attachment L3 Past Performance Information (PPI).pdf PDF
Attachment L1-50DC.xls XLS spreadsheet
Att 1_SOW-12722.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT L5

PAST PERFORMANCE QUESTIONNAIRE

Request for Proposal: FA2823-22-R-0007 HVAC Project, Bldg. 12722, Eglin AFB, FL 32542 FTFA 20-RC03,

1. Name of Contractor:

Contract or Identifying Number:

Title/Description of Contract:

2. Brief description of scope of work:

EVALUATION: Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.

A. Did the contractor have any non-conformance issues? If so, what kind?

B. Did the contractor have adequate resources to complete the required performance?

C. Were there issues with the subcontractor’s testing lab and/or material suppliers?

D. Did the contractor submit required documents on time and answer questions in a timely manner?

FA2823-22-R-0007 FTFA 20-RC03

Assessment Definition Substantial Confidence

(SC)

Based on the Offeror’s recent/relevant performance record, this customer has a high expectation that the Offeror will successfully perform the required effort for us again.

Satisfactory Confidence

(SAT)

Based on the Offeror’s recent/relevant performance record, this customer has a reasonable expectation that the Offeror will successfully perform the required effort for us again.

Limited Confidence

(LC)

Based on the Offeror’s recent/relevant performance record, this customer has a low expectation that the Offeror will successfully perform the required effort for us again.

No Confidence

(NC)

Based on the Offeror’s recent/relevant performance record, this customer has no expectation that the Offeror will successfully perform the required effort for us again.

Unknown Confidence (Neutral) (UC)

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Based upon the assessment definitions above, indicate your assessment of the contractor’s performance on your contract described on Attachment A. Your assessment should consider the contractor’s performance in accordance with the contractual requirements. Circle all that apply.

CONTRACTOR’S NAME: __________________________ CONTRACT NO.: _______________________

01 Contractor developed realistic progress schedules & completed the project within the established schedule.

SC SAT LC NC UC

02 Contractor provided submittals in a timely manner. Submittals were well researched and clearly identified the proposed item.

SC SAT LC NC UC

03 Contractor provided timely and accurate payrolls with no known labor violations (Davis-Bacon Act) or labor claims.

SC SAT LC NC UC

04 Contractor provided experienced managers and supervisors, with the technical and administrative abilities needed to meet contract requirements.

SC SAT LC NC UC

05 Contractor hired quality subcontractors and effectively managed them.

SC SAT LC NC UC

06 Contractor identified problems as they occurred. Suggested approaches to problems. Displayed initiative and cooperation to solve problems. Provided adequate information and pricing for change orders and negotiated them in good faith.

SC SAT LC NC UC

07 Contractor provided effective quality control, which resulted in a quality-finished product.

SC SAT LC NC UC

08 Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain in comments section, SC SAT LC NC UC

09 Would you hire this contractor again? If no, explain in comments section

SC SAT LC NC UC

OVERALL RATING: ______________________________

BRIEF EXPLANATION OF OVERALL RATING GIVEN:

ADDITIONAL COMMENTS

Name of Person Completing Evaluation:

Base/Company: Date:

Position Title/Grade: Phone:

Email: Fax:

File details come from the government source that posted it. Updated .