Att 1_SOW-12722.pdf
PDF 24 KB Posted
- Attached to
- Replace and Improve HVAC System in Bldg 12722 Federal contract opportunity
- Solicitation number
- FA282322R0007
About this file
This solicitation is for replacing and improving the HVAC system in Building 12722 at Eglin Air Force Base, Florida. The work includes demolishing the existing HVAC equipment, including air cooled chillers, AHUs, chilled and hot water piping, and pumps. A new HVAC system will be installed, including AHUs, a fully redundant chiller system, and pump sets. New electrical panels and a transformer will also be provided. The acquisition is set aside for small businesses.
Offerors must submit proposals in three volumes by the closing date of September 15, 2022: Volume I includes a 50 division cost estimate worksheet and financial questionnaire; Volume II requires past performance information; and Volume III contains contract documentation including SF-1442 and representations/certifications. Site visits will be held on August 15. Questions are due by August 1. The period of performance is 426 days. Proposals will be evaluated using a tradeoff process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers .pdf | ||
| FA282322R00070002.pdf | ||
| Section_L_21 April 2022.pdf | ||
| Att 4_FTFA 20-RC03_Drawings_Final_Updated.pdf | ||
| FA282322R00070001.pdf | ||
| Section_M.pdf | ||
| Att 3_Specifications.pdf | ||
| Solicitation - FA282322R0007.pdf | ||
| Att 4_FTFA 20-RC03 Drawings.pdf | ||
| Attachment L4 Consent Form.pdf | ||
| Attachment L3 Past Performance Information (PPI).pdf | ||
| Attachment L2-FRQ.pdf | ||
| Att 2_WD.pdf | ||
| Attachment L6 Cover Letter.pdf | ||
| Attachment L1-50DC.xls | XLS spreadsheet | |
| Attachment L5-Past Performance Question (PPQ).pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 12722 HVAC REPLACEMENT FTFA 20-RC03
EGLIN AFB, FLORIDA 21AC
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests; G
Utility Connection Requests; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes the existing HVAC system to be completely demolished to include but not limited to air cooled chillers, AHUs, chilled water and hot water piping, and pumps. A new complete HVAC system is to be installed to include AHUs , fully redundant chiller system and pump sets. Existing HVAC equipment (Chillers, CWP, HWP and AHU's), electrical connections, and associated conductors/conduit shall be demolished back to source. Some areas will need demolition of abandoned equipment to make room for new HVAC. A new 208V and 480V panel will be installed on each floor to serve the new equipment. A dry type transformer will be installed to derive the 208V, 3 phase distribution. The existing main panel will serve the chillers and larger loads and incidental related work, as indicated in the contract documents.
The asbestos work is based on information provided by Eglin Air Force Base 96th Civil Engineering Group via Memorandum "SUBJECT: Asbestos Assessment, Bldg. 12722, Rooms 111, 112, 114, 201, 205, & 209," which is provided as an appendix to these specifications. Where survey results are found to be insufficient to address onsite findings, additional sampling and analysis of suspect building materials shall be required by the contractor.
1.2.2 Location
The work shall be located at Building 12722, Eglin AFB, as indicated on the drawings. The exact location will be shown by the Contracting Officer.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
SECTION 01 11 00 Page 1
b. Restore portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 ON-SITE PERMITS
1.4.1 Utility Outage Requests and Utility Connection Requests
Notify the Contracting Officer at least 48 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends.
1.5 LOCATION OF UNDERGROUND FACILITIES
The Contractor shall obtain a fully approved Form 103 "Work Clearance Form" prior to beginning work. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.6 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.
The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
SECTION 01 11 00 Page 2
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
| FTFA 20-RC03_Specifications_Final 3 |
| FTFA 20-RC03_Specifications_Final 4 |
| FTFA 20-RC03_Specifications_Final 5 |
File details come from the government source that posted it. Updated .