Attachment L3 - Statement of Work - C108373.pdf
PDF 917 KB Posted
- Solicitation number
- 75N99020R00033
About this file
This statement of work outlines requirements for a roof replacement project at the National Institute of Environmental Health Sciences in Research Triangle Park, North Carolina. The contractor shall conduct infrared scanning of the existing roof sections, remove ballast stones, insulation, membrane, flashing, and drains to fully replace both roof sections consisting of approximately 31,136 square feet total. New installation shall include polyisocyanurate insulation, TPO membrane with a 20-year warranty, metal counter flashing, coping caps, and safety guard railing. The contractor must schedule work to flow continuously with minimal inactive periods and complete construction within 120 days of notice to proceed. Closeout requires warranties, manuals, and as-built drawings.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APRIL 23, 2020 1 of 4 Project Number C108373
Statement of Work Project Number C108373
Building 105, South Plant Roof Replacement National Institute of Environmental Health Sciences
Research Triangle Park, NC COR: Matthew Hunt Date: April 23, 2020
This Scope of Work details requirements for a construction project to replace the roofs on the Building 105 South Plant at the National Institute of Environmental Health Sciences (NIEHS), North Carolina. The Indefinite Delivery Indefinite Quantity Task Order (IDIQ) Contractor as directed by the NIH IDIQ Contract, NIEHS Campus Roof Full Replacement, Restoration, Maintenance, and Repair Services is to provide turn-key services to complete the project.
I. GENERAL:
A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functionality of the existing facility as required.
B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP).
C. The construction schedule shall provide a minimum of 10 business days for Government review of each submittal package.
D. The Contractor shall provide all project management personnel necessary per their approved task order specific quality control and safety plans to properly oversee the construction of this project. Project Manager, Quality Control Manager, and Superintendent roles may be performed by the same individual as deemed appropriate by the Contractor for this task order provided the designated personnel are qualified and meet the requirements set forth in the Contractor’s approved Site Specific Safety Plan and Site Specific Quality Control Plan. The Contractor shall provide for review and acceptance the resume and qualifications of any key personnel performing the tasks identified above that have not been previously approved by the Government.
E. The attached submittal register (Attachment A) details the minimum number of items to be submitted for Government review and acceptance. The updated submittal register shall include submission dates coordinated with the construction schedule.
The construction schedule shall include adequate review time for submittals. Provide
APRIL 23, 2020 2 of 4 Project Number C108373 the minimum number of review days in accordance with Specification 01 33 00, paragraph 1.10.
F. Within 10 calendar days of task order NTP the Contractor shall provide a detailed schedule for approval.
G. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun.
Planned periods of inactivity should be limited to a maximum of 5 consecutive working days. To avoid unexpected material delivery delays ALL material shall be on the job site or stored locally and readily available. A preparatory inspection may not be scheduled until the material is made available for inspection. No work shall be performed without a preparatory inspection.
II. CONSTRUCTION:
A. The Contractor shall construct the project in accordance with the 2016 NIH Design
Requirements Manual and in accordance with the FMB-RTP Engineering Standards and Material Requirements - Revision H.
B. Work Restrictions: All work shall be completed during the hours established in the base IDIQ contract. All holes/roof openings shall be properly covered at the end of each day to prevent water leaking into the building or damage to the existing roof.
All trash and debris shall be cleaned off the roof at the end of each day.
III. SCOPE OF WORK
A. The Contractor shall supply all labor, materials, and equipment to replace the
Building 105, South Plant (Section E and F) ballast roofing system with a new Single Ply Thermoplastic (TPO) roofing system.
a. The new roofing system shall meet or exceed the current NC Building Code.
B. The Contractor shall conduct an infrared scanning of both roof sections before beginning demolition.
C. The Contractor shall remove the existing lightning protection from Section E and F.
The lightning protection shall be reinstalled by a certified installer after the new roofing system has been installed.
D. The Contractor shall remove the ballast stones, filter fabric, covered insulation, EDPM membrane, flashing, and coping cap.
APRIL 23, 2020 3 of 4 Project Number C108373
E. The Contractor shall remove the existing roof drains.
F. The Contractor shall supply and install new 1.5” polyisocyanurate insulation.
G. The Contractor shall supply and install new 0.5” high density polyisocyanurate insulation.
H. The Contractor shall supply and install new roof drains.
I. The Contractor shall supply and install a new white TPO roof system on each roof.
The new TPO roof system shall include a 20-year warranty.
a. TPO membrane shall wrap the parapet wall.
J. The Contractor shall install new 24-gauge pre-finished metal counter flashing and coping cap on parapet wall.
a. The blocking shall also be replaced.
K. The Contractor shall install permanent safety guard railing along the roof edges to meet OSHA requirements.
L. The Contractor shall provide manufacturer’s installation certifications for the recommended TPO roof system.
M. Construction Details and Requirements:
a. The Contractor shall have a project manager/quality control on-site while work is being performed.
i. The Site Safety and Health Officer (SSHO) shall also be on-site while work is being performed.
b. All materials will be solvent free.
c. The Contractor shall maintain a safe and secure work site including securing the roof in a watertight condition at the end of each day.
d. All materials and installations shall be in accordance with the manufacturer's recommendations and installation instructions.
e. The finished roofing system shall be covered by a 20-year labor and materials warranty.
f. The Contractor shall provide roof walking pads from roof access locations to all roof mounted equipment.
g. Contractor shall notify Government a minimum of 14 calendar days prior to beginning construction.
h. The Contractor shall remove all construction debris produced by the project including trash blown off the roof.
APRIL 23, 2020 4 of 4 Project Number C108373
i. The Contractor is responsible for any damage caused by the construction including landscaping, equipment/utilities, and building damage.
j. This project is turn-key by the Contractor.
k. The Contractor shall perform a leak test and provide a leak test report. Any rework and retesting shall be performed at no additional cost to the government.
IV. CLOSE-OUT REQUIREMENTS
A. The Contractor shall provide the following closeout documentation:
a. Warranties
b. Preventative Maintenance
c. Operation and Maintenance Manuals
d. New Roof As-Builts Drawings
V. ATTACHMENTS
A. Submittal Register B. Building 105, Roof Sections E and F
Attachment A
SECTION
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION OF ITEM SUBMITTED
DATE
SUBMITTED
FOR
REVIEW
REVIEW
NEEDED BY
(SHALL
INCLUDE
MIN. # OF
DAYS PER
SOW)
- P R
E C
O N
S U
B M
IT
TA
LS
- S H
O P
D R
A W
IN
G
S
- P R
O D
U C
T D
A
TA
- S A
M P
LE
S
- D E
S
IG
N D
A
TA
- T E
S T
R E
P O
R
TS
- C E
R
TI
FI
C
A
TE
S
- M
FR
S
IN
S
TR
U C
TI
O
N S
- M
FR
S F
IE
LD
R E
P O
R T
- O
M D
A
TA
- C
LO
S E
O U
T S
U B
M
IT
TA
LS
F
IO
FO
R
IN
FO
R
M A
TI
O
N O
N
LY
G A
G
O V
E R
N M
E N
T A
P P
R O
V E
D
D A
D
E S
IG
N
E R
O F
R E
C O
R D
A P
P R
O V
A L
D A
G
A
D
TR
D
IV
IS
IO
N
O F
TE
C
H N
IC
A
L R
E S
O U
R C
E S
D R
D
E S
IG
N
E R
O F
R E
C O
R D
H S
B
H E
A
LT
H A
N D
S A
FE
TY
O S
B
S E
C U
R
IT
Y
P O
P
R O
JE
C
T O
FF
IC
E R
A E
A
R C
H
IT
E C
T / E
N G
IN
E
E R
Schedule X X X
Task Order QC Plan X X X
Task Order APP Supplement X X X
Activity Hazard Analysis X X X X
Schedule of Values X X X
Safety Data Sheets X X X X
Material X X X
Manufacturer's Installation Certifications X X X X
Warranty X X X
As-Builts X X X
TITLE AND LOCATION
SUBMITTAL REGISTER FORM C108373
CONTRACT NUMBER TASK ORDER NUMBER
C108373 - Building 105, South Plant, Roof Restoration
CLASSIFICATION REVIEWING OFFICETYPE OF SUBMITTAL
Section E
National Institutes of Health
N.I.E.H.S, Research Triangle Park, Building 105
1 roof(s) - 25,591 sq. ft.
1 ..
Tremco Incorporated
GENERAL INFORMATION
Roof Name Section E
Service Activity Type TremCare Gold
Service Activity Date Dec 3 2019
Job Number 103589
Information Source Specification
Year of Installation 2001
Roof Leaks No
Leak Sensitivity Medium
Roof Size 25,591 sq. ft.
# of Stories 2
Is Ladder Required? No
Asset Value $39.00 per sq. ft.
Total Asset Value $998,049.00
Overall Roof Condition 20 - Red
Inspection Comments The roof is in poor condition at this time.
Technician Mike Curley
ROOF CONSTRUCTION
Surfacing Ballast
Roof Type/System Single Ply
Insulation 1" Extruded Polystyrene, Loose
Ply Info 1 ply EPDM, Loose Laid
Deck Type Metal
DRAINAGE AND SLOPE
Drainage Internal Drains, Overflow Scuppers
Slope 1/4 inch(es) per foot, Saddles/Crickets, Variable Slope
National Institutes of Health Research Triangle Park
Building 105
Tremco Incorporated 1 ..
PERIMETER, WALL AND COPING
Type Condition(s) Magnitude
Perimeter Type Non-Parapet Wall Poor Condition Less than ¼ of roof
Parapet Wall Poor Condition Less than ¾ of roof
Wall Type Metal Clad Wall Good Condition
Single Ply Covered Poor Condition Less than ¾ of roof
Coping Type Metal Coping Stained Less than ¾ of roof
Perimeter Wall and Flashing Type
Single Ply Poor Condition Less than ¾ of roof
Projection Flashings Type Boots Poor Condition Less than ½ of roof
EPDM Single Ply Poor Condition Less than ¾ of roof
Metal Stained Less than ¾ of roof
ROOF CONDITIONS
Defect(s) Magnitude
Brittle More than ¾ of roof
Embrittlement More than ¾ of roof
Shrinkage Less than ½ of roof
MAINTENANCE SUMMARY
Work Performed
TremCare Completed inspections checking all details and roof drains, making sure they are free from visible debris.
OUTSTANDING BUDGET
Task Year Project $ Task Description
Work Beyond Scope of Maintenance Agreement (Customer Responsibility)
Perimeter Fall Protection 2019 Recommend installing 440' of perimeter safety protection.
Replace Roof 2020 Recommend replacing the roof.
National Institutes of Health Research Triangle Park
Building 105
Tremco Incorporated 2 ..
Overview.
Overview.
Overview.
National Institutes of Health Research Triangle Park
Building 105 Section E
Service Activity Photos
Tremco Incorporated 3 ..
Section F
National Institutes of Health
N.I.E.H.S, Research Triangle Park, Building 105
1 roof(s) - 5,545 sq. ft.
1 ..
Tremco Incorporated
GENERAL INFORMATION
Roof Name Section F
Service Activity Type TremCare Gold
Service Activity Date Dec 3 2019
Job Number 103589
Information Source Specification
Year of Installation 2001
Roof Leaks No
Leak Sensitivity Medium
Roof Size 5,545 sq. ft.
# of Stories 1
Is Ladder Required? Yes
Asset Value $39.00 per sq. ft.
Total Asset Value $216,255.00
Overall Roof Condition 20 - Red
Inspection Comments The roof is in poor condition at this time.
Technician Mike Curley
ROOF CONSTRUCTION
Surfacing Ballast
Roof Type/System Single Ply
Insulation 1" Extruded Polystyrene, Loose
Ply Info 1 ply EPDM, Loose Laid
Deck Type Metal
DRAINAGE AND SLOPE
Drainage Internal Drains, Overflow Scuppers
Slope 1/4 inch(es) per foot
National Institutes of Health Research Triangle Park
Building 105
Tremco Incorporated 1 ..
PERIMETER, WALL AND COPING
Type Condition(s) Magnitude
Perimeter Type Non-Parapet Wall Good Condition
Parapet Wall Brittle Less than ¾ of roof
Raised Edge Brittle Less than ¼ of roof
Wall Type Pre-cast Wall Good Condition
Coping Type Metal Coping Stained Less than ¾ of roof
Perimeter Wall and Flashing Type
Single Ply Brittle Less than ¾ of roof
Counterflashing Type Face Mount Good Condition
Counterflashing Material Type Stainless Good Condition
Projection Flashings Type Boots Weathered Less than ½ of roof
Single Ply Brittle Less than ½ of roof
ROOF CONDITIONS
Defect(s) Magnitude
Brittle More than ¾ of roof
Weathered More than ¾ of roof
Shrinkage Less than ¼ of roof
MAINTENANCE SUMMARY
Work Performed
TremCare Completed inspections checking all details and roof drains, making sure they are free from visible debris.
OUTSTANDING BUDGET
Task Year Project $ Task Description
Work Beyond Scope of Maintenance Agreement (Customer Responsibility)
Perimeter Fall Protection 2019 Recommend installing 250' of perimeter safety protection.
Replace Roof 2020 Recommend replacing the roof.
National Institutes of Health Research Triangle Park
Building 105
Tremco Incorporated 2 ..
National Institutes of Health Research Triangle Park
Building 105 Section F
Service Activity Photos
Tremco Incorporated 3 ..
| Project Number C108373 |
| I. GENERAL: |
| A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functional... |
| B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP). |
| C. The construction schedule shall provide a minimum of 10 business days for Government review of each submittal package. |
| D. Within 10 calendar days of task order NTP the Contractor shall provide a detailed schedule for approval. |
| E. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun. Planned periods of inactivity should be limited to a maximum of 5 consecutive worki... |
| II. CONSTRUCTION: |
| A. The Contractor shall construct the project in accordance with the 2016 NIH Design Requirements Manual and in accordance with the FMB-RTP Engineering Standards and Material Requirements - Revision H. |
| B. Work Restrictions: All work shall be completed during the day. |
| III. SCOPE OF WORK |
| B. Building 105, Section E and F has two roofs, which is approximately 31,136 square feet. The roof presently has a single ply EPDM membrane roof system with ballast surfacing. The new TPO roof system shall supplied and installed to meet an acceptab... |
| C. The Contractor shall install safety guard railing along the roof edges per OSHA requirement. |
| D. The Contractor shall provide manufacturers certification for at least three manufacturers. |
| E. Construction Details and Requirements: |
| a. 100% project supervision. |
| b. All materials will be solvent free |
| c. The Contractor shall maintain a safe and secure work site including securing the building in a watertight condition at all times. |
| d. All materials and installations shall meet the manufacturer’s requirements. |
| e. The finished roofing system shall be covered by a 20-year warranty. |
| f. The Contractor shall provide roof walking pads from roof access locations to all roof mounted equipment. |
| g. Contractor shall notify Government a minimum of 14 calendar days prior to beginning construction. |
| h. The Contractor shall remove all construction debris produced by the project including trash blown off the roof. |
| i. The Contractor is responsible for any damage caused by the construction including landscaping, equipment/utilities, and building damage. |
| j. This project is turn-key by the Contractor. |
| IV. CLOSE-OUT REQUIREMENTS |
| A. The Contractor shall provide the following closeout documentation: |
| a. Warranties |
| b. Preventative Maintenance |
| c. Operation and Maintenance Manuals |
| V. ATTACHMENTS |
| A. Submittal Register |
| B. Building 105, Roof Sections E and F |
| ADP2186.tmp |
| Sheet1 |
| Attachment B - Bldg. 105 - Section E.pdf |
| Roof Details |
| N.I.E.H.S |
| Research Triangle Park |
| Building 105 |
| Section E |
| Building Cover Page |
| Bldg. 105 - Roof E - December Inspection.pdf |
| Roof Details |
| N.I.E.H.S |
| Research Triangle Park |
| Building 105 |
| Section E |
| General Information |
| Roof Construction |
| Drainage and Slope |
| Roof Details |
| Roof Defects |
| Maintenance Summary |
| Budget Summary |
| Service Activity Photos |
| Attachment B - Bldg. 105 - Section F.pdf |
| Roof Details |
| N.I.E.H.S |
| Research Triangle Park |
| Building 105 |
| Section F |
| Building Cover Page |
| Bldg. 105 - Roof F - December Inspection.pdf |
| Roof Details |
| N.I.E.H.S |
| Research Triangle Park |
| Building 105 |
| Section F |
| General Information |
| Roof Construction |
| Drainage and Slope |
| Roof Details |
| Roof Defects |
| Maintenance Summary |
| Budget Summary |
| Service Activity Photos |
| ADPE09F.tmp |
| Project Number C108373 |
| I. GENERAL: |
| A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functional... |
| B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP). |
| C. The construction schedule shall provide a minimum of 10 business days for Government review of each submittal package. |
| D. Within 10 calendar days of task order NTP the Contractor shall provide a detailed schedule for approval. |
| E. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun. Planned periods of inactivity should be limited to a maximum of 5 consecutive worki... |
| II. CONSTRUCTION: |
| A. The Contractor shall construct the project in accordance with the 2016 NIH Design Requirements Manual and in accordance with the FMB-RTP Engineering Standards and Material Requirements - Revision H. |
| B. Work Restrictions: All work shall be completed during the day. |
| III. SCOPE OF WORK |
| B. Building 105, Section E and F has two roofs, which is approximately 31,136 square feet. The roof presently has a single ply EPDM membrane roof system with ballast surfacing. The new TPO roof system shall supplied and installed to meet an acceptab... |
| C. The Contractor shall install safety guard railing along the roof edges per OSHA requirement. |
| D. The Contractor shall provide manufacturers certification for at least three manufacturers. |
| E. Construction Details and Requirements: |
| a. 100% project supervision. |
| b. All materials will be solvent free |
| c. The Contractor shall maintain a safe and secure work site including securing the building in a watertight condition at all times. |
| d. All materials and installations shall meet the manufacturer’s requirements. |
| e. The finished roofing system shall be covered by a 20-year warranty. |
| f. The Contractor shall provide roof walking pads from roof access locations to all roof mounted equipment. |
| g. Contractor shall notify Government a minimum of 14 calendar days prior to beginning construction. |
| h. The Contractor shall remove all construction debris produced by the project including trash blown off the roof. |
| i. The Contractor is responsible for any damage caused by the construction including landscaping, equipment/utilities, and building damage. |
| j. This project is turn-key by the Contractor. |
| IV. CLOSE-OUT REQUIREMENTS |
| A. The Contractor shall provide the following closeout documentation: |
| a. Warranties |
| b. Preventative Maintenance |
| c. Operation and Maintenance Manuals |
| V. ATTACHMENTS |
| A. Submittal Register |
| B. Building 105, Roof Sections E and F |
| ADPC70D.tmp |
| Project Number C108373 |
| I. GENERAL: |
| A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functional... |
| B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP). |
| C. The construction schedule shall provide a minimum of 10 business days for Government review of each submittal package. |
| D. Within 10 calendar days of task order NTP the Contractor shall provide a detailed schedule for approval. |
| E. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun. Planned periods of inactivity should be limited to a maximum of 5 consecutive worki... |
| II. CONSTRUCTION: |
| A. The Contractor shall construct the project in accordance with the 2016 NIH Design Requirements Manual and in accordance with the FMB-RTP Engineering Standards and Material Requirements - Revision H. |
| B. Work Restrictions: All work shall be completed during the day. All holes/roof openings shall be properly covered at the end of each day to prevent water leaking into the building or damage to the existing roof. All trash and debris shall be clea... |
| III. SCOPE OF WORK |
| B. Building 105, Section E and F has two roofs, which is approximately 31,136 square feet. The roof presently has a single ply EPDM membrane roof system with ballast surfacing. |
| C. The Contractor shall remove the ballast stones, and covered insulation. |
| D. The Contractor shall supply and install a new TPO roof system on each roof. The new TPO roof system shall meet an acceptable 20-year warranty. |
| E. The Contractor shall install safety guard railing along the roof edges per OSHA requirement. |
| F. The Contractor shall provide manufacturers install certifications for at least three manufacturers. |
| G. Construction Details and Requirements: |
| a. 100% project supervision. |
| b. All materials will be solvent free |
| c. The Contractor shall maintain a safe and secure work site including securing the building in a watertight condition at all times. |
| d. All materials and installations shall meet the manufacturer’s requirements. |
| e. The finished roofing system shall be covered by a 20-year warranty. |
| f. The Contractor shall provide roof walking pads from roof access locations to all roof mounted equipment. |
| g. Contractor shall notify Government a minimum of 14 calendar days prior to beginning construction. |
| h. The Contractor shall remove all construction debris produced by the project including trash blown off the roof. |
| i. The Contractor is responsible for any damage caused by the construction including landscaping, equipment/utilities, and building damage. |
| j. This project is turn-key by the Contractor. |
| IV. CLOSE-OUT REQUIREMENTS |
| A. The Contractor shall provide the following closeout documentation: |
| a. Warranties |
| b. Preventative Maintenance |
| c. Operation and Maintenance Manuals |
| V. ATTACHMENTS |
| A. Submittal Register |
| B. Building 105, Roof Sections E and F |
| ADPD808.tmp |
| Sheet1 |
| ADP50E5.tmp |
| Project Number C108373 |
| I. GENERAL: |
| A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functional... |
| B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP). |
| C. The construction schedule shall provide a minimum of 10 business days for Government review of each submittal package. |
| D. Within 10 calendar days of task order NTP the Contractor shall provide a detailed schedule for approval. |
| E. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun. Planned periods of inactivity should be limited to a maximum of 5 consecutive worki... |
| II. CONSTRUCTION: |
| A. The Contractor shall construct the project in accordance with the 2016 NIH Design Requirements Manual and in accordance with the FMB-RTP Engineering Standards and Material Requirements - Revision H. |
| B. Work Restrictions: All work shall be completed during the day. All holes/roof openings shall be properly covered at the end of each day to prevent water leaking into the building or damage to the existing roof. All trash and debris shall be clea... |
| III. SCOPE OF WORK |
| B. The Contractor shall conduct an infrared scanning of both roof sections before beginning demolition. |
| C. The Contractor shall remove the existing lightning protection from Section E and F. The lightning protection shall be reinstalled by a certified installer after the new roofing system has been installed. |
| D. The Contractor shall remove the ballast stones, filter fabric, covered insulation, EDPM membrane, flashing, and coping cap. |
| E. The Contractor shall remove the existing roof drains. |
| F. The Contractor shall supply and install new 1.5” polyisocyanurate insulation. |
| G. The Contractor shall supply and install new 0.5” high density polyisocyanurate insulation. |
| H. The Contractor shall supply and install new roof drains. |
| I. The Contractor shall supply and install a new white TPO roof system on each roof. The new TPO roof system shall include a 20-year warranty. |
| a. TPO membrane shall wrap the parapet wall. |
| J. The Contractor shall install new 24-gauge pre-finished metal counter flashing and coping cap on parapet wall. |
| a. The blocking shall also be replaced. |
| K. The Contractor shall install safety guard railing along the roof edges to meet OSHA requirements. |
| L. The Contractor shall provide manufacturers install certifications for the recommended TPO roof system. |
| M. Construction Details and Requirements: |
| a. The Contractor shall have a project manager/quality control on-site while work is being performed. |
| b. All materials will be solvent free. |
| c. The Contractor shall maintain a safe and secure work site including securing the roof is in a watertight condition at the end of each day. |
| d. All materials and installations shall be in accordance with the manufacturer's recommendations and installation instructions. |
| e. The finished roofing system shall be covered by a 20-year labor and materials warranty. |
| f. The Contractor shall provide roof walking pads from roof access locations to all roof mounted equipment. |
| g. Contractor shall notify Government a minimum of 14 calendar days prior to beginning construction. |
| h. The Contractor shall remove all construction debris produced by the project including trash blown off the roof. |
| i. The Contractor is responsible for any damage caused by the construction including landscaping, equipment/utilities, and building damage. |
| j. This project is turn-key by the Contractor. |
| IV. CLOSE-OUT REQUIREMENTS |
| A. The Contractor shall provide the following closeout documentation: |
| a. Warranties |
| b. Preventative Maintenance |
| c. Operation and Maintenance Manuals |
| V. ATTACHMENTS |
| A. Submittal Register |
| B. Building 105, Roof Sections E and F |
| ADPB1BE.tmp |
| Project Number C108373 |
| I. GENERAL: |
| A. The Contractor shall provide all services necessary to complete the project as stated in Section III, Scope of Work (SOW). The Contractor is responsible for providing demolition/construction, temporary contractor access, and maintaining functional... |
| B. Period of performance: Final construction must be complete within 120 calendar days from task order Notice to Proceed (NTP). |
| C. The construction schedule shall provide a minimum of 10 business days for Government review of each submittal package. |
| D. The Contractor shall provide all project management personnel necessary per their approved task order specific quality control and safety plans to properly oversee the construction of this project. Project Manager, Quality Control Manager, and Sup... |
| E. The attached submittal register (Attachment A) details the minimum number of items to be submitted for Government review and acceptance. The updated submittal register shall include submission dates coordinated with the construction schedule. The... |
| F. Within 10 calendar days of task order NTP the Contractor shall provide a detailed schedule for approval. |
| G. The Contractor shall schedule ALL construction activities with a continuous flow of work without any significant periods of inactivity once construction has begun. Planned periods of inactivity should be limited to a maximum of 5 consecutive worki... |
| II. CONSTRUCTION: |
| A. The Contractor shall construct the project in accordance with the 2016 NIH Design Requirements Manual and in accordance with the FMB-RTP Engineering Standards and Material Requirements - Revision H. |
| B. Work Restrictions: All work shall be completed during the hours established in the base IDIQ contract. All holes/roof openings shall be properly covered at the end of each day to prevent water leaking into the building or damage to the existing r... |
| III. SCOPE OF WORK |
| B. The Contractor shall conduct an infrared scanning of both roof sections before beginning demolition. |
| C. The Contractor shall remove the existing lightning protection from Section E and F. The lightning protection shall be reinstalled by a certified installer after the new roofing system has been installed. |
| D. The Contractor shall remove the ballast stones, filter fabric, covered insulation, EDPM membrane, flashing, and coping cap. |
| E. The Contractor shall remove the existing roof drains. |
| F. The Contractor shall supply and install new 1.5” polyisocyanurate insulation. |
| G. The Contractor shall supply and install new 0.5” high density polyisocyanurate insulation. |
| H. The Contractor shall supply and install new roof drains. |
| I. The Contractor shall supply and install a new white TPO roof system on each roof. The new TPO roof system shall include a 20-year warranty. |
| a. TPO membrane shall wrap the parapet wall. |
| J. The Contractor shall install new 24-gauge pre-finished metal counter flashing and coping cap on parapet wall. |
| a. The blocking shall also be replaced. |
| K. The Contractor shall install permanent safety guard railing along the roof edges to meet OSHA requirements. |
| L. The Contractor shall provide manufacturer’s installation certifications for the recommended TPO roof system. |
| M. Construction Details and Requirements: |
| a. The Contractor shall have a project manager/quality control on-site while work is being performed. |
| i. The Site Safety and Health Officer (SSHO) shall also be on-site while work is being performed. |
| b. All materials will be solvent free. |
| c. The Contractor shall maintain a safe and secure work site including securing the roof in a watertight condition at the end of each day. |
| d. All materials and installations shall be in accordance with the manufacturer's recommendations and installation instructions. |
| e. The finished roofing system shall be covered by a 20-year labor and materials warranty. |
| f. The Contractor shall provide roof walking pads from roof access locations to all roof mounted equipment. |
| g. Contractor shall notify Government a minimum of 14 calendar days prior to beginning construction. |
| h. The Contractor shall remove all construction debris produced by the project including trash blown off the roof. |
| i. The Contractor is responsible for any damage caused by the construction including landscaping, equipment/utilities, and building damage. |
| j. This project is turn-key by the Contractor. |
| k. The Contractor shall perform a leak test and provide a leak test report. Any rework and retesting shall be performed at no additional cost to the government. |
| IV. CLOSE-OUT REQUIREMENTS |
| A. The Contractor shall provide the following closeout documentation: |
| a. Warranties |
| b. Preventative Maintenance |
| c. Operation and Maintenance Manuals |
| d. New Roof As-Builts Drawings |
| V. ATTACHMENTS |
| A. Submittal Register |
| B. Building 105, Roof Sections E and F |
| ADPB99B.tmp |
| Sheet1 |
File details come from the government source that posted it. Updated .