Attachment L1_Bid Form.pdf

PDF 14 KB Posted

Attached to
XTLF 25-1025 ELECTRICAL DISTRIBUTION RESILIENCE CIRCUIT 2 LOOP FEED Federal contract opportunity
Solicitation number
FA302925R0005
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a Bid Form for the XTLF 25-1025 Electrical Distribution Resilience Circuit 2 Loop Feed project at Vance AFB in Enid, Oklahoma. The bid form requires contractors to provide subtotal costs for five line items: Electrical Switch, Electrical Sectionalizers, Trenching and Conduit, Electrical Conductors and Terminations, and Horizontal Directional Boring. The project has a non-performance period of 340 calendar days and a performance period of 120 days, with a special note emphasizing the need to prepare submittals for electrical switchgear within 30 days of contract award due to potential market variability in equipment availability.

The solicitation is a 100% Small Business Set-Aside with a project magnitude between $500,000 and $1,000,000, falling under NAICS code 238210 with a size standard of $19 Million. The project involves installing a 15kV Class pad-mounted distribution switch, two 15kV class pad-mounted sectionalizing cabinets, constructing approximately 1,300 linear feet of duct bank, and installing 1,300 linear feet of 15kV class medium voltage cable. The work includes two horizontal directional drill sections, connection to an existing manhole, cable pulling in 4 sections, and 24 dead break elbow terminations.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 41 00

BID FORM

BID FORM

1. Submission of Proposal: The Government reserves the right to reject incomplete proposals.

Project Name: ____________________________________________________________

Name of Contractor:

2. Provide subtotal costs in table below. Subtotal costs must include all associated costs to complete the scope of the plans and specifications.

Item Description Cost, $

1 Electrical Switch

2 Electrical Sectionalizers

3 Trenching and Conduit

4 Electrial Conductors and Terminations

5 Horizontal Directional Boring

The Contractor proposes to perform all of the Work required by the Contract Documents for the amount of: (Fill in amount in numbers and words.)

Bid Amount (sum of lines 1 through 5 above)

Note: Evaluation will be based on upon bid amount on the line above.

3. Time: The non-performance period is 340 calendar days, the performance period is 120 days.

Note: Due to the market variability of electrical switch gear availability, every effort must be made by the contractor to prepare submittals with long lead times within 30 days of contract award for expedient approval. The Contracting Officer reserves the right to extend the non-performance period, if quoted supplier lead times warrant an extension of the non-performance period.

-- End of Section --