About this file

This document contains instructions for completing a cost summary spreadsheet and template for a federal contract opportunity to provide maintenance, repair, overhaul, and logistics support services. Key details include: the contractor shall enter labor categories, hours, rates, and costs for prime and subcontractor personnel; indirect rates and other direct costs shall be included; the summary shall break out costs by contract line item number (CLIN) and period of performance; a pass-through analysis and fee analysis are required showing percentages. Additionally, the related federal contract opportunity notices a draft request for proposal to award an indefinite-delivery/indefinite-quantity contract for these aviation support equipment services by the third quarter of fiscal year 2023, with industry feedback on the draft requested by October 11, 2022 and a final RFP anticipated in early November 2022. The Naval Air Systems Command is the contracting agency.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter joint venture names into Cell A4, A5 if applicable. Add more rows for JV names if necessary.
3Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
4Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, proposed labor categories with more than one person providing service shall identify the total number of personnel on one line for each site . For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
5Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
6The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
7All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
8All dollar figures shall be carried out no further than two decimal places.
9In column D, identify the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
10In column E, the Offeror shall insert the location at where the work will be performed (i.e Solomons Island, North Island, etc)
11Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
12(If applicable) In column F, the Offeror shall identify which JV member name will be providing the specific labor category.
13For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
14Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
15The prime should insert the subcontractor handling charge, if any.
16The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
17The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
18Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
19Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
20On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
21When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A13, and A20.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For subcontractor cost summary sheets, delete Rows 22-48.
12When submitting this file, the instructions may be deleted.

Cost Summary Spreadsheet

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Joint Venture Member Name (if applicable):
Joint Venture Member Name (if applicable):
Subcontractor Name (if applicable):
Ordering Period 1Ordering Period 2Ordering Period 36-mo extensionTotal for All Periods
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteJV Member Name (if applicable)RateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 1 (key personnel)000000
Number of Proposed personnel per Labor Category
Total Direct Labor Cost000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost0000
COM
Total Prime Contractor Labor Cost0000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee00000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost Plus Fixed Fee (CPFF)0
Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs
Total CPFF all CLINs (Labor and ODCs)0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Maximum Pass Through Allowed by SeaPort-e IDIQ Contract8%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%
Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

&CPage &P&R&F &LKTR: (name)&CSource Selection Information - See: FAR 2.101 and 3.104&RRFP:

Summary

CLIN Summary Sheet
CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
X001
X002
X003
X004
X005
X006
X007
X008
X009
X010
Total

File details come from the government source that posted it. Updated .