Attachment-K_FOFR_Cost_Estimate_form.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Fort Frederica National Monument Wayside Exhibit F
Solicitation number
140P2125R0029
Issued by

About this file

The document is a detailed cost estimate form (Attachment-K_FOFR_Cost_Estimate_form.xlsx) for the Fort Frederica National Monument Wayside Exhibit Fabrication and Installation project, solicitation number 140P2125R0029, issued by the Department of the Interior National Park Service. The comprehensive Excel spreadsheet breaks down estimated costs across multiple categories including project management, layouts, fabrication drawings, proofs/samples, exhibit structures, display objects, electrical/electronic components, graphic panels, audio description, project closeout, shipping, and installation.

The cost estimate includes line-item breakdowns for materials and labor, with specific details on quantities, unit costs, and labor hours for various project components. Each section (such as exhibit structures, graphic panels, and display objects) is meticulously itemized, showing zero-dollar placeholders for various elements like wall mounts, panels, and specialty objects. The document also includes an Option A for a tactile map at Fort Frederica National Monument, with estimated costs for map surface material, exhibit base, labor, and installation. Despite the detailed breakdown, all current cost entries are set to $0.00, suggesting this is a template or preliminary estimate awaiting specific pricing information.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimate

FOFR: Fabrication and Installation Cost Estimate
PROJECT MANAGEMENT$0.00
LAYOUTS & FABRICATION DRAWINGS$0.00
PROOFS/SAMPLES/PROTOTYPE$0.00
EXHIBIT STRUCTURES$0.00
DISPLAY OBJECTS & SPECIALTY$0.00
ELECTRICAL/ ELECTRONIC$0.00
GRAPHIC PANELS$0.00
AUDIO DESCRIPTION$0.00
PROJECT CLOSEOUT$0.00
SHIPPING$0.00Total Materials Cost
INSTALLATION$0.00Total Labor Hours
TRAVEL$0.00
TOTAL$0.00Total Cost Minus Travel:
Rounded to$0
OPTION A: Tactile Map
Total IGE with option(s)$0
PROJECT MANAGEMENT (excluding travel)
LABORhoursxrateamount
Project Managerhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Project Management $0.00

Layouts and Fabrication Drawings
MATERIALS:qty.unitunit costamount
Miscellaneousjob$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Fabrication Detailerhours @$0.00
$0.00

TOTAL ALL LABOR $0.00

TOTAL Fabrication Drawings $0.00

Proofs/Samples/Mock-ups/Prototypes
MATERIALS:qty.unitunit costamount
Sample Materialsset$0.00
Prototype of each Tactile Element material typeea$0.00
Full-size Printed Proofsea$0.00
$0.00
$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibit Specialist - Fabricationhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Samples $0.00

Exhibit Structures/Bases
MATERIALS: painted aluminumqty.unitunit costamount
36x48 wall mountea$0.00
24x36 wall mountea$0.00
36x24 low profile, in groundea$0.00
48x24 low profile, in groundea$0.00
24x36 upright, single-sided, in groundea$0.00
24x36 double inline upright, w/ bulletin case and accessory bar (brochure)ea$0.00
36x24 rail mountea$0.00
$0.00
$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00

TOTAL ALL MATERIALS $0.00

LABORhoursxrateamount
Exhibit Specialist - Fabrication (42 bases)hours @$0.00
$0.00
TOTAL ALL LABOR$0.00

TOTAL Exhibit Structures $0.00

Display Objects and Specialty Elements
MATERIALS:qty.unitunit costamount
EX 09pipe fragmentsea$0.00
EX 14glass bottleea$0.00
EX 25keyea$0.00
EX 26eyebolt/pinea$0.00
EX 26cannon ballea$0.00
EX 33combea$0.00
ea$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Misc. Materialsea
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibit Specialist - Fabricationhours @$0.00
Model Makerhours @$0.00
$0.00
$0.00

TOTAL ALL LABOR $0.00

TOTAL DO and SE $0.00

Electrical/Electronic
MATERIALS:qty.unitunit costamount
ea$0.00
SUBTOTAL, AV EQUIPMENT$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibit Specialist - Electricalhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Electrical/Mechanical/AV $0.00

Graphic Panels
MATERIALS:qty.unitunit costamount
36x48 double-sided aluminumea$0.00
24x36 double-sided aluminumea$0.00
24x36 single-sided aluminumea$0.00
48x24 double-sided aluminumea$0.00
48x24 single-sided aluminumea$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Graphics Supervisorhours @$0.00
Graphics Specialist (42 panels)hours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Graphics $0.00

Audio Description
MATERIALS:qty.unitunit costamount
Misc.ea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORxrateamount
Audio Describerhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Conservation $0.00

PROJECT CLOSEOUT
MATERIALS:qty.unitunit costamount
Miscellaneousjob$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Project Managerhours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Project Closeout $0.00

SHIPPING
MATERIALS:qty.unitunit costamount
Packingjob @$0.00
Shippingjob @$0.00

TOTAL MATERIALS $0.00

LABORhoursxrateamount
Exhibit Specialist - Fabricationhours @$0.00

TOTAL ALL LABOR $0.00

Total Shipping $0.00

INSTALLATION and removal

MATERIALS:qty.unitunit costamount
air farejob @$0.00
per diemdays @$0.00
Lodgingdays @$0.00
Rental car and gasdays @$0.00

Misc. concrete, weights, and equipment rental job @ $0.00

TOTAL MATERIALS crew $0.00

LABOR (42 exhibits to install; 41 to remove)hoursxrateamount
Project Managerhours @$0.00
Exhibit Spec - Fabricatorhours @$0.00
Exhibit Spec - Laborerhours @$0.00
$0.00

TOTAL ALL LABOR $0.00

Total Installation $0.00

TRAVEL
Post Award
MATERIALS:qty.unitunit costamount
air farejob @$0.00
per diemdays @$0.00
lodgingdays @$0.00
Rental car and gasdays @$0.00
Misc.job @$0.00

TOTAL MATERIALS team $0.00

LABORhoursxrateamount
Project Managerhours @$0.00
Audio Describerhours @$0.00
hours @$0.00
hours @$0.00
TOTAL ALL LABOR$0.00

Total Travel $0.00

Option A Park: Fort Frederica National Monument - Contract Option A

Contract
QuantityDescriptionTotal Cost
Map surface material - bronze
Exhibit base - 68.75"x36.75"x 32"
Misc.
LaborHoursRate
Project Manager$0.00
Exhibit Specialist (Fabricator)$0.00
Model Maker$0.00
Sample Materials and Prototype
tactile map material(s) with sample finish
8"x10" 100% to scale map sections (to be determined by Government) in approved material and finish

Sign Structures Total $0.00

HoursRate
Shipping
Exhibit Specialist (Installation)$0.00
Installation Total$0.00

Estimated Contract Total $0.00

File details come from the government source that posted it. Updated .