Attachment-K_FOFR_Cost_Estimate_form.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- 140P2125R0029
About this file
The document is a detailed cost estimate form (Attachment-K_FOFR_Cost_Estimate_form.xlsx) for the Fort Frederica National Monument Wayside Exhibit Fabrication and Installation project, solicitation number 140P2125R0029, issued by the Department of the Interior National Park Service. The comprehensive Excel spreadsheet breaks down estimated costs across multiple categories including project management, layouts, fabrication drawings, proofs/samples, exhibit structures, display objects, electrical/electronic components, graphic panels, audio description, project closeout, shipping, and installation.
The cost estimate includes line-item breakdowns for materials and labor, with specific details on quantities, unit costs, and labor hours for various project components. Each section (such as exhibit structures, graphic panels, and display objects) is meticulously itemized, showing zero-dollar placeholders for various elements like wall mounts, panels, and specialty objects. The document also includes an Option A for a tactile map at Fort Frederica National Monument, with estimated costs for map surface material, exhibit base, labor, and installation. Despite the detailed breakdown, all current cost entries are set to $0.00, suggesting this is a template or preliminary estimate awaiting specific pricing information.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimate
| FOFR: Fabrication and Installation Cost Estimate | ||||
| PROJECT MANAGEMENT | $0.00 | |||
| LAYOUTS & FABRICATION DRAWINGS | $0.00 | |||
| PROOFS/SAMPLES/PROTOTYPE | $0.00 | |||
| EXHIBIT STRUCTURES | $0.00 | |||
| DISPLAY OBJECTS & SPECIALTY | $0.00 | |||
| ELECTRICAL/ ELECTRONIC | $0.00 | |||
| GRAPHIC PANELS | $0.00 | |||
| AUDIO DESCRIPTION | $0.00 | |||
| PROJECT CLOSEOUT | $0.00 | |||
| SHIPPING | $0.00 | Total Materials Cost | ||
| INSTALLATION | $0.00 | Total Labor Hours | ||
| TRAVEL | $0.00 | |||
| TOTAL | $0.00 | Total Cost Minus Travel: | ||
| Rounded to | $0 |
| OPTION A: Tactile Map | |||||
| Total IGE with option(s) | $0 | ||||
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Layouts and Fabrication Drawings | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount |
| Fabrication Detailer | hours @ | $0.00 |
| $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Proofs/Samples/Mock-ups/Prototypes | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Sample Materials | set | $0.00 | |||
| Prototype of each Tactile Element material type | ea | $0.00 | |||
| Full-size Printed Proofs | ea | $0.00 | |||
| $0.00 | |||||
| $0.00 | |||||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Samples $0.00
| Exhibit Structures/Bases | |||||
| MATERIALS: painted aluminum | qty. | unit | unit cost | amount | |
| 36x48 wall mount | ea | $0.00 | |||
| 24x36 wall mount | ea | $0.00 | |||
| 36x24 low profile, in ground | ea | $0.00 | |||
| 48x24 low profile, in ground | ea | $0.00 | |||
| 24x36 upright, single-sided, in ground | ea | $0.00 | |||
| 24x36 double inline upright, w/ bulletin case and accessory bar (brochure) | ea | $0.00 | |||
| 36x24 rail mount | ea | $0.00 | |||
| $0.00 | |||||
| $0.00 | |||||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication (42 bases) | hours @ | $0.00 | |||
| $0.00 | |||||
| TOTAL ALL LABOR | $0.00 |
TOTAL Exhibit Structures $0.00
| Display Objects and Specialty Elements | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| EX 09 | pipe fragments | ea | $0.00 | ||
| EX 14 | glass bottle | ea | $0.00 | ||
| EX 25 | key | ea | $0.00 | ||
| EX 26 | eyebolt/pin | ea | $0.00 | ||
| EX 26 | cannon ball | ea | $0.00 | ||
| EX 33 | comb | ea | $0.00 | ||
| ea | $0.00 | ||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| Misc. Materials | ea | ||||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication | hours @ | $0.00 | |||
| Model Maker | hours @ | $0.00 | |||
| $0.00 | |||||
| $0.00 |
TOTAL ALL LABOR $0.00
TOTAL DO and SE $0.00
| Electrical/Electronic | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
| ea | $0.00 |
| SUBTOTAL, AV EQUIPMENT | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Electrical | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Electrical/Mechanical/AV $0.00
| Graphic Panels | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| 36x48 double-sided aluminum | ea | $0.00 | |||
| 24x36 double-sided aluminum | ea | $0.00 | |||
| 24x36 single-sided aluminum | ea | $0.00 | |||
| 48x24 double-sided aluminum | ea | $0.00 | |||
| 48x24 single-sided aluminum | ea | $0.00 | |||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Graphics Supervisor | hours @ | $0.00 | |||
| Graphics Specialist (42 panels) | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Audio Description | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Misc. | ea | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | |||
| LABOR | x | rate | amount | |
| Audio Describer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing | job @ | $0.00 | |||
| Shipping | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
INSTALLATION and removal
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | job @ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| Rental car and gas | days @ | $0.00 |
Misc. concrete, weights, and equipment rental job @ $0.00
TOTAL MATERIALS crew $0.00
| LABOR (42 exhibits to install; 41 to remove) | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| Exhibit Spec - Laborer | hours @ | $0.00 | |||
| $0.00 |
TOTAL ALL LABOR $0.00
Total Installation $0.00
| TRAVEL | |||||
| Post Award | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | job @ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| lodging | days @ | $0.00 | |||
| Rental car and gas | days @ | $0.00 | |||
| Misc. | job @ | $0.00 |
TOTAL MATERIALS team $0.00
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| Audio Describer | hours @ | $0.00 | |||
| hours @ | $0.00 | ||||
| hours @ | $0.00 | ||||
| TOTAL ALL LABOR | $0.00 |
Total Travel $0.00
Option A Park: Fort Frederica National Monument - Contract Option A
| Contract | |||
| Quantity | Description | Total Cost |
| Map surface material - bronze |
| Exhibit base - 68.75"x36.75"x 32" |
| Misc. |
| Labor | Hours | Rate | |
| Project Manager | $0.00 | ||
| Exhibit Specialist (Fabricator) | $0.00 | ||
| Model Maker | $0.00 |
| Sample Materials and Prototype |
| tactile map material(s) with sample finish |
| 8"x10" 100% to scale map sections (to be determined by Government) in approved material and finish |
Sign Structures Total $0.00
| Hours | Rate | |
| Shipping |
| Exhibit Specialist (Installation) | $0.00 | |
| Installation Total | $0.00 |
Estimated Contract Total $0.00
File details come from the government source that posted it. Updated .