Attachment J - Phase 1 Floor Plans.pdf
PDF 4 MB Posted
- Solicitation number
- RFP DET 260000002640 1
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This file consists of Phase 1 Floor Plans for a turn-key demolition project in Detroit, Michigan, involving four school buildings managed by the Detroit Public Schools system. The document identifies the specific facilities targeted for demolition: Post Intermediate School located at 8200 Midland Street, Murphy Elementary-Middle School at 23901 Fenkell Avenue, Stewart Elementary at 13120 Buena Vista, and Pulaski Elementary at 19725 Strasburg. The floor plans appear to include scanned architectural drawings dated December 16, 2019, which provide detailed layouts of the buildings subject to demolition under contract opportunity 27-0037.
The floor plans serve as supporting documentation for bidders responding to the Phase 1 vacant building demolition project scheduled for 2027. These architectural drawings enable contractors to assess the structural scope, building configurations, and demolition requirements for each facility. The plans represent essential reference materials for developing accurate cost estimates, determining equipment and labor requirements, and establishing timelines for the turn-key demolition services to be performed at all four Detroit school locations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POST INTERMEDIATE SCHOOL
8200 MIDLAND ST
DETROIT, MI 48238
MURPHY ELEMENTARY-MIDDLE SCHOOL
23901 FENKELL AVE
DETROIT, MI 48239
STEWART ELEMENTARY
13120 BUENA VISTA
DETROIT, MI 48238
PULASKI ELEMENTARY
19725 STRASBURG
DETROIT, MI 48205
| Post.pdf |
| Scan 2019-12-16 (10,14,24) |
| Scan 2019-12-16 (10,14,55) |
| Scan 2019-12-16 (10,15,28) |
File details come from the government source that posted it. Updated .