About this file

This is a Preliminary Hazardous Materials Survey Report prepared by Atlas Technical Consultants LLC for the Detroit Public Schools Community District regarding the planned demolition of Murphy Elementary/Middle School located at 23901 Fenkell Street, Detroit, Michigan 48223. The survey was conducted from July 15 through July 23, 2026, by State of Michigan licensed asbestos inspectors and identifies asbestos-containing materials (ACM) and universal waste requiring abatement prior to demolition activities. The report documents 186 sampled locations throughout the building, with laboratory analysis performed by Environmental Testing Laboratories, Inc. using polarized-light microscopy in accordance with OSHA, EPA, and AHERA standards. Accessible areas of the structure were visually inspected to identify suspect friable and non-friable materials, with bulk samples collected and analyzed to determine asbestos content percentages and material classifications.

The survey results indicate that multiple building materials contain asbestos requiring removal prior to demolition, including plaster containing up to 5% Amosite, floor tiles and mastics containing up to 5.75% Chrysotile, pipe insulation containing up to 40% Chrysotile, duct insulation, tank insulation, fire doors, window glazing, caulking, and various other materials. Additionally, universal waste materials identified include 19 exit signs, approximately 400 fluorescent light bulbs, 728 fluorescent light fixtures, 18 smoke detectors, 26 thermostats, 15 fire extinguishers, 2 coolers with refrigerant, and an estimated 4-6 PCB transformers located in inaccessible flooded basement areas. The report notes that boiler room, basement, and tunnel areas were not accessible due to flooding at the time of survey, and contractors bidding on removal should not rely on exact quantities listed but conduct independent assessments. All identified ACM and regulated materials must be removed and disposed of in accordance with federal, state, and local requirements, with proper manifests and documentation provided to the owner.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIMINARY HAZARDOUS MATERIALS SURVEY REPORT

FOR PLANNED DEMOLITION

MURPHY ELEMENTARY/MIDDLE SCHOOL

23901 FENKELL STREET

DETROIT, MICHIGAN 48223

REPORT DATE: AUGUST 14, 2026

PREPARED FOR:

MR. JAMIE CONN

PROJECT MANAGER - CAPITAL PROJECTS; PMP

DETROIT PUBLIC SCHOOLS COMMUNITY DISTRICT

SUPPORT SERVICES COMPLEX, BUILDING C

1601 FARNSWORTH STREET

DETROIT, MICHIGAN 48211

PREPARED BY:

Atlas Technical Consultants LLC 46555 Humboldt Drive, Suite 100 Novi, Michigan 48377

Atlas Project No.: 188BS26308

August 14, 2026

MR. JAMIE CONN

PROJECT MANAGER - CAPITAL PROJECTS; PMP

DETROIT PUBLIC SCHOOLS COMMUNITY DISTRICT

SUPPORT SERVICES COMPLEX, BUILDING C

1601 FARNSWORTH STREET

DETROIT, MICHIGAN 48211

Subject: Preliminary Hazardous Materials Survey Report For Planned Demolition Former Murphy Elementary-Middle School

23901 Fenkell Street Detroit, Michigan 48223 Atlas Project No 188BS26308

Dear Mr. Conn:

Atlas is pleased to present this report detailing the findings of the preliminary hazardous materials survey performed at the above-referenced site in preparation for the planned demolition of the structure(s). The purpose of this sampling was to identify and collect samples of suspect asbestos containing building materials (ACBM’s) and conduct an inventory of universal waste and other regulated materials to develop a specification for the abatement and demolition activities.

The pre-demolition hazardous materials survey was conducted from July 15, 2026 through July 23rd, 2026. State of Michigan licensed asbestos inspectors Kari Lamprich (A60513) and Kenneth Borden (A65450) completed the survey of the subject property. The sampling was conducted in accordance with sampling criteria specified in the Occupational Safety and Health Administration’s (OSHA) Asbestos Construction Industry Standard (29 CFR 1926.1101), EPA Asbestos NESHAP (40 CFR Part 61, Subpart M), and the Asbestos Hazard and Emergency Response Act of 1987 (AHERA).If you have any questions, please call us at 248.669.5140.

Respectfully submitted, ATLAS TECHNICAL CONSULTANTS LLC

Jennifer Fashbaugh Kari Lamprich Building Sciences Program Manager State of Michigan Asbestos Inspector (A60513)

CONTENTS

1. INTRODUCTION

1.1 Purpose

1.2 Pre-Demolition Asbestos Survey

1.3 Universal Waste and Other Regulated Materials

2. PRE-DEMOLITION ASBESTOS SURVEY

2.1 Homogeneous Areas

2.2 Hazard Assessment Factors

2.3 Laboratory Analytical Methodology

2.4 Sampling Results

3. UNIVERSAL WASTE AND OTHER REGULATED MATERIALS

4. CONCLUSIONS AND RECOMMENDATIONS

4.1 Asbestos Containing Materials

4.2 Universal Waste and Other Regulated Materials

4.3 Inaccessible Areas

5. ASSUMPTIONS AND LIMITATIONS

TABLES

Table 1 Suspect Asbestos Containing Materials and Results Table 2 Universal Waste and Other Regulated Materials

APPENDICES

Appendix A Subject Property Photolog Appendix B Sample Location Map Appendix C Asbestos Laboratory Report

Murphy Elementary-Middle School / Atlas Project No. 188BS26308

1. INTRODUCTION

Atlas Technical Consultants LLC (Atlas) was retained by the Detroit Public Schools Community District (DPSCD) to provide industrial hygiene services with respect to the planned demolition at Murphy Elementary-Middle School (Subject Property) located at 23901 Fenkell, Detroit, Michigan 48223.

1.1 Purpose

The purpose of this project was to identify asbestos containing materials and universal waste/other regulated materials at the Subject Property that will require abatement prior to the planned demolition activities.

1.2 Pre-Demolition Asbestos Survey

The scope of the Pre-Demolition asbestos survey included the following:

• Review of existing asbestos reports for the building, if available;

• Review of demolition drawings, if available;

• Survey of the property building(s);

• Identification of accessible suspect asbestos-containing materials (ACMs); and

• Collection and analysis of bulk samples of suspect friable and non-friable materials.

All accessible areas of the building were visually inspected for the presence of building materials that are suspected to contain asbestos. Bulk samples of suspect ACMs were collected and placed into individual containers for transport to a National Voluntary Lab Accreditation Program (NVLAP)-accredited laboratory for analysis. Materials typically known as non-asbestos items (i.e.

fibrous glass, foam rubber, wood, etc.) were not sampled. The asbestos inspection consisted of the following three basic procedures:

• Conducting a visual inspection of the structures;

• Identifying homogeneous areas (HAs) of suspect surfacing, thermal system insulation, and/or miscellaneous materials; and

• Sampling accessible, friable and non-friable suspect materials.

A photolog of the Subject Property is included in Appendix A. A sample location map of the asbestos bulk samples collected is included in Appendix B. The asbestos laboratory analytical report is included in Appendix C.

1.3 Universal Waste and Other Regulated Materials

Atlas conducted a visual inspection of the building during the pre-demolition hazardous material assessment to identify the type, location and estimated quantity of regulated materials and universal wastes that may be generated during the demolition of the building. Removal and disposal of the materials identified below shall be in accordance with federal, state and local requirements as per the Resource Conservation and Recovery Act (RCRA). Contractors that remove the materials listed below should ensure that proper manifests, disposal and/or recovery is documented and provided to the Owner. Identified Regulated Materials and Universal Wastes are summarized in Table 2 below.

2. PRE-DEMOLITION ASBESTOS SURVEY

2.1 Homogeneous Areas

Prior to collecting any samples, homogenous areas (HAs) were identified. A homogeneous sampling area can be described as one or more areas of material that are similar in appearance and texture and that have the same apparent installation date, appearance, and function. The actual number of samples collected from each homogeneous sampling area may vary, based on the type of material and the professional opinion of the inspector.

2.2 Hazard Assessment Factors

From the list of suspect homogeneous areas, a physical assessment was performed for each material on the list. A physical assessment includes evaluating the condition, assessing the potential for disturbance, and determining the friability of each material. By definition, "friable" materials are those that can be crumbled or reduced to powder by hand pressure when dry. Each material identified was further classified into one of three categories: surfacing materials, thermal systems insulation (TSI) and miscellaneous materials. Each of the three categories have specific sampling requirements, outlined below.

Surfacing Materials: Refers to spray-applied or troweled surfaces such as plaster ceilings and walls, fireproofing, textured paints, textured plasters, and spray-applied acoustical surfaces.

Thermal System Insulation: Refers to insulation used to inhibit heat gain or loss on pipes, boilers, tanks, ducts, and various other building components.

Miscellaneous Materials: Refers to friable and non-friable products and materials that do not fit in any of the above two categories such as resilient floor coverings, baseboards, mastics, adhesives, roofing material, caulking, glazing, and siding. This category also contains wallboard and ceiling tile.

2.3 Laboratory Analytical Methodology

Bulk samples were analysed by Environmental Testing Laboratories, Inc. (ETL) in Romulus, Michigan using polarized-light microscopy (PLM) and dispersion staining (Method Reference: 40 CFR Part 763, Volume 47, No. 103, May 27, 1982 pg. 23376) EPA Method 600/R-93/116.

This laboratory participates in the NVLAP accreditation program (NVLAP #201028-0), a quality assurance program for PLM analysis, and is accredited by the National Institute of Standards and Technology (NIST) as well as accreditation requirements under 15 CFR Part 25.

A photolog of the subject property is included in Appendix A. A map of the asbestos bulk sample locations is included in Appendix B. A copy of the asbestos laboratory analytical report and corresponding chain-of-custody are included in Appendix C.

2.4 Sampling Results

A material that contains greater than one percent (>1%) of asbestos fibers as defined by the EPA and OSHA (29 CFR 1926.1101) as an asbestos-containing material (ACM) must be handled according to federal and state regulations. Friable materials reported to contain one percent or less of asbestos fibers are required to be considered as ACM by the EPA, unless the “Point Counting” method of analysis and quantification is used to denote the percentages. Although the EPA does not regulate materials that are reported to be 1% or less, OSHA still regulates work practices and worker exposures for materials disturbed containing trace levels of asbestos (OSHA Guidance Document, November 24, 2003, (Compliance Requirements for Renovations Work Involving Materials Containing Less than 1% Asbestos).

The following table provides a summary of accessible suspect and confirmed ACMs that may be impacted during the planned demolition activities:

TABLE 1 Suspect Asbestos Containing Materials and Results

Sample ID No. Description Location Quantity

(LF/SF)

Present Asbestos/Type (2)

Friable Yes/No

(1) 1-BM-A,B,C Block mortar (CMU) Exterior walls 19,000 SF ND No

2-FT-A,B,C 12”x12” orange floor tile FS-32 20 SF ND No

3-FT-A,B,C 12”x12” off-white with white splotches floor tile FS-32 and science labs 3,200 SF ND No

4-FT-A,B,C 12”x12” blue floor tile FS-32 20 SF ND No 5-FT-A,B,C 12”x12” yellow floor tile FS-32 20 SF ND No 6-FT-A,B,C 12”x12” green floor tile FS-32 20 SF ND No 7-CB-A,B,C 4” black cove base and assoc. mastic FS-32, FS-33, FS-36 400 SF ND No

8-CP-A,B,C 2’x2’ ceiling panel (pock mark & gash) FS-32 800 SF ND Yes

9-WG-A,B,C Window glaze FS-30, FS-32, FS-33 (large window set) 12 window sets ND No

10-IC-A,B,C Interior caulk FS-30, FS-32, FS-33 (around exterior doors) 60 LF 0.75% Chrysotile No

11-FD-A,B,C Fire doors (metal) FS-30, FS-32, FS-33 16 doors ND No

12-EP-A,B,C Electrical putty FS-6, FS-32, FS-52 (conduit and electrical penetrations) 150 SF ND No

13-PI-A,B,C Fiberglass pipe insulation with paper backing and black tar Corridor CO, Corridor CH, FS-32 600 LF ND Yes

14-CC-A,B,C Concrete chip FS-31 (ceiling deck) 200 SF 0.5% Chrysotile No

15-IC-A,B,C Interior caulk FS-32, FS-77, FS-82 (building seams) 900 LF 1.75% Chrysotile No

16-GP-A,B,C Glue pod FS-30 (storage room pin boards) 25 SF ND No

17-PL-

A,B,C,D,E,F,G,H,I Plaster Corridors CB, CO, CE, CH, CG (ceiling) 9,500 SF + debris

5% Amosite (fibrous material)

ND (plaster and skim coat)

Yes

18-IC-A,B,C Interior caulk Corridor CE (around double door sets) 90 LF ND No

19-FT-A,B,C 12”x12” beige floor tile Corridor CE FS-105 and FS-106 600 SF ND No

TABLE 1 Suspect Asbestos Containing Materials and Results

Sample ID No. Description Location Quantity

(LF/SF)

Present Asbestos/Type (2)

Friable Yes/No

(1)

20-FT-A,B,C 9”x9” brown splotchy floor tile Corridors CD, CH, CG, CE, CB, Classrooms FS-51 and FS-92

25,000 SF 2% Chrysotile (tile) ND (mastic) No

21-VD-A,B,C Vibration dampener FS-38 4 SF ND No

22-FT-A,B,C 9”x9” beige floor tile Corridors CD, CH, CG, CE, CB, Classrooms FS-51 and FS-92

12,000 SF

1.5% Chrysotile (tile)

3.25% Chrysotile (mastic)

No

23-PL-

A,B,C,D,E,F,G Plaster on mesh Gym, Corridors CB and CH (walls/vertical) 7,200 SF ND Yes

24-CT-A,B,C 12”x12” ceiling tile FS-29, FS-34, FS-85 5,000 SF ND Yes

25-CT-A,B,C 12”x12” ceiling tile FS-34 600 SF ND Yes 26-CA-A,B,C Construction adhesive FS-36 (backsplash) 20 SF ND No

27-WG-A,B,C Window glaze (3 stack windows) FS-66, FS-77, FS-85 (courtyard windows) 35 windows 1.5% Chrysotile No

28-GM-A,B,C Grout and mortar FS-66, FS-77, FS-85 (window sills) 600 SF

2% Chrysotile (grout) ND (mortar and cementitious material) No

29-FT-A,B,C 9”x9” green/gray floor tile Classrooms

FS-3, FS-36, FS-77A 15,000 SF

3.25% Chrysotile (tile) 4.5% Chrysotile

(mastic) No

30-WG-A,B,C Window glaze Vestibules (entrance windows) 8 windows 0.25% Chrysotile No

31-FD-A,B,C Fire door FS-74 1 door 8% Chrysotile 4% Amosite No

32-GP-A,B,C Glue pods Corridor CO (atrium ceiling) 800 SF ND No 33-GM-A,B,C Grout and mortar FS-35 (desk/counter) 120 SF ND No

34-PL-

A,B,C,D,E,F,G Plaster FS-34, FS-35, FS-36 (soffits) 4,000 SF ND Yes

35-PF-A,B,C Pipe fitting FS-31, FS-33B 30 fittings + debris 5% Chrysotile Yes

36-VD-A,B,C Vibration dampener HVAC room 10 SF ND No

37-PL-A,B,C Plaster Corridors CG, CD, CH, CC, CB, CF (verticals) 875 SF ND Yes

38-WG-A,B,C Window glaze Corridor CG, CE (exit doors) 60 LF Trace Chrysotile Yes

39-GM-A,B,C Grout and mortar (1”x1” green floor tiles) FS-45, FS-84 900 SF ND No

40-GM-A,B,C Green grout and mortar (used as cove base) FS-45 60 SF ND No

41-VB-A,B,C Vapor barrier FS-46 (floor) 8,000 SF Trace Chrysotile No 42-IC-A,B,C Interior caulk FS-46 (water fountain) 6 LF ND No

43-GP-A,B,C Glue pods FS-46 (behind gym wall marker and bulletin boards) 20 SF ND No

44-PL-A,B,C Plaster FS-46 (verticals) 20 SF ND Yes 45-FC-A,B,C Fire curtain FS-46 1,500 SF ND No 46-FM-A,B,C Floor mastic FS-46 Gym beneath wood flooring 8,000 SF 5% Chrysotile No

47-DI-A,B,C Yellow fiberglass duct insulation with canvas backing HVAC throughout, Fan Rooms 900 SF + debris 40% Chrysotile

(canvas) ND (insulation)

Yes

48-VD-A,B,C Vibration dampener HVAC throughout, Fan Rooms 10 SF ND No

TABLE 1 Suspect Asbestos Containing Materials and Results

Sample ID No. Description Location Quantity

(LF/SF)

Present Asbestos/Type (2)

Friable Yes/No

(1)

49-PI-A,B,C Pipe insulation Corridors (roof drains) 8 each + debris

15% Chrysotile (insulation)

ND (fibrous materials) Yes

50-FM-A,B,C Floor mastic FS-54 (stage) 700 SF ND No 51-FC-A,B,C Fire curtain FS-54 (stage) 650 SF ND No 52-PL-A,B,C Plaster on mesh FS-54 (stage) 800 SF ND Yes 53-CC-A,B,C Concrete chip FS-42 (ceiling) 500 SF ND No 54-VD-A,B,C Vibration dampener Gym HVAC room 8 SF ND No 55-IC-A,B,C Interior caulk HVAC (seams) 190 LF 0.5% Chrysotile No

56-DI-A,B,C Duct insulation HVAC Fan Rooms 800 SF + debris 40% Chrysotile Yes

57-FT-A,B,C 9”x9” splotchy beige floor tile Corridors and Classrooms 800 SF 5.75% Chrysotile

(mastic) ND (tile)

No

58-FT-A,B,C 9”x9” white floor tile Corridor CD 100 SF Trace Chrysotile

(mastic) ND (floor tile)

No

59-GM-A,B,C Grout and mortar Corridor CD / Atrium (water fountain wall triangle) 100 SF

1.5% Chrysotile (mortar) ND (grout, tile, adhesive, and fibrous material)

No

60-GM-A,B,C Grout (white) and mortar (green) with 1”x1” tile (blue)

Corridor CD/ Atrium (water foundation walls) 20 SF ND No

61-IC-A,B,C Interior caulk Corridor CD (around ceramic tiles) 60 LF ND No

62-PL-A,B,C Plaster patch Corridor CD (water fountain wall) 25 SF 1.75% Chrysotile Yes

63-GP-A,B,C Glue pod (on 1”x1” ceiling tile) CD Atrium 2,000 SF ND No 64-CT-A,B,C 1”x1” ceiling tile Atrium (ceiling) 2,000 SF ND No

65-WG-A,B,C Window glaze Atrium, corridor CH (courtyard windows) 25 windows 0.25% Chrysotile No

66-IC-A,B,C Red interior caulk (fire stop) Corridors and FS-38,52, 58, 91 210 LF ND No 67-IC-A,B,C Silver interior caulk FS-50 (serving table) 75 LF ND No

68-GM-A,B,C Grout and mortar (5”x5” tile) FS-50, FS-50A-F (floor) 1,300 SF ND No

69-WG-A,B,C Window glaze FS-50A-C (office windows) 4 windows 0.25% Chrysotile No

70-CS-A,B,C Cooler sealant FS-50F 120 LF ND No 71-EP-A,B,C Electrical putty FS-50F (cooler) 1 LF ND No 72-GM-A,B,C Grout and mortar Kitchen under ovens (raised) 30 SF ND No 73-CC-A,B,C Concrete patch FS-50 4 SF ND No 74-BM-A,B,C Brick and mortar FS-1A, FS-64, corridor CD, CH, CG 8,500 SF ND No

75-FT-A,B,C 12”x12” gray floor tile Corridor CD (near gym) 10 SF 1.5% Chrysotile (mastic); ND (tile) No

76-FS-A,B,C Floor sheeting Security booth 12 SF ND No 77-GP-A,B,C Glue pods FS-59, FS-60, FS-62 (behind boards) 80 SF ND No 78-WG-A,B,C Window glaze Corridors CD, CH (vestibules) 420 LF 0.5% Chrysotile No

79-PL-A,B,C,D,E Plaster (with multi-colored stones) Exterior, Corridors CD and CH, Vestibules 4,800 SF ND Yes

TABLE 1 Suspect Asbestos Containing Materials and Results

Sample ID No. Description Location Quantity

(LF/SF)

Present Asbestos/Type (2)

Friable Yes/No

(1)

80-GM-A,B,C Ground and mortar (1”x1” blue floor tile) Corridors CD and CH Vestibule (floors) 500 SF ND No

81-IC-A,B,C Interior caulk Corridors Brick Seams (brick seams) 400 LF 1.25% Chrysotile No

82-FD-A,B,C Fire door insulation (wood doors) Throughout 60 doors 5% Amosite No

83-IC-A,B,C Interior caulk: Around Aluminum Windows Corridors CD and CH (vestibules) 300 LF 1.5% Chrysotile No

84-IC-A,B,C Interior Window Caulk Exterior Windows 5,280 LF ND No 85-WG-A,B,C Window glaze Exterior windows 80 windows 0.25% Chrysotile No

86-GP-A,B,C Glue pod FS-59, FS-60, FS-62 (walls to ceilings) 2,500 SF ND No

87-CT-A,B,C 1’x1’ Ceiling Tile FS-59, FS-60, FS-62 6,500 SF ND Yes

88-CC-A,B,C Concrete chip FS-59, FS-60, FS-62 (stairs) 800 SF ND No

89-CB-A,B,C Cove base and adhesive FS-59, FS-60, FS-62 (stairs) 400 SF ND No

90-WG-A,B,C Window glaze FS-59, FS-60, FS-62 (windows) 10 windows 0.25% Chrysotile No

91-GM-A,B,C Grout and mortar (1”x1” white tile) FS-78, FS-80, FS-83 (floors) 800 SF ND No 92-GM-A,B,C Grout and mortar (4”x4” white tile) FS-78, FS-80, FS-83 (walls) 2,400 SF ND No

93-GM-A,B,C Grout and mortar (4”x4” green tile) Bathrooms and locker-room (walls) 2,400 SF Trace Chrysotile

(mortar) ND (tile and grout)

No

94-GM-A,B,C Grout and mortar (1”x1” multi-color tile) Corridor CH @ Old water fountain 60 SF ND No

95-WG-A,B,C Window glaze FS-1, FS-66, FS-67 (office windows) 13 windows Trace Chrysotile No

96-IC-A,B,C White interior caulk Bathrooms and Locker Rooms 500 LF ND No

97-IC-A,B,C Interior caulk Corridor CD (where brick meets metal) 90 LF ND No

98-FT-A,B,C 9”x9” light brown floor tile FS-1, FS-2, FS-3 1,600 SF 2.5% Chrysotile

(mastic) 0.5% Chrysotile (tile)

No

99-IC-A,B,C Interior caulk FS-1 FS-65 FS-70 (office windows) 60 LF 0.5% Chrysotile No 100-EPP-A,B,C Black electrical panel paper Throughout 60 SF ND No 101-PL-A,B,C Plaster patch FS-1 (office) 30 SF ND Yes 102-IC-A,B,C Interior caulk FS-67 (walls) 15 LF ND No 103-IN-A,B,C Separator insulation FS-77 20 SF ND Yes 104-GP-A,B,C Glue pod FS-77 (bookcase) 120 SF ND No 105-CG-A,B,C Carpet glue FS-77 300 SF ND No 106-CB-A,B,C 6” black cove base with adhesive FS-77 (main desk) 20 SF ND No 107-WG-A,B,C Window glaze FS-77 (interior windows) 5 windows 0.5% Chrysotile No

108-IB-A,B,C Insulation board Corridor CH (block walls) 600 SF ND No

109-IC-A,B,C Interior caulk Corridors CG, CD, CH, CC, CB, CF (ceilings) 4,200 LF

0.5% Chrysotile (plaster)

ND (caulk) No

110-PL-A,B,C Plaster on mesh Corridor CDE, CH, CE, CF (vertical) 968 SF ND Yes 111-IC-A,B,C Interior caulk Corridor (building gaps) 90 LF ND No

TABLE 1 Suspect Asbestos Containing Materials and Results

Sample ID No. Description Location Quantity

(LF/SF)

Present Asbestos/Type (2)

Friable Yes/No

(1)

112-GM-A,B,C Grout and mortar (1”x1” mosaic tile) Corridor CH 60 SF

0.5% Chrysotile (grout)

ND (tile and mortar) No

113-GM-A,B,C Grout and mortar (4”x4” splotchy white tile) Corridor CH 80 SF ND No

114-IC-A,B,C Interior caulk Corridor CH (exterior windows) 300 LF 1% Chrysotile No

115-WBS-A,B,C Wallboard system FS-88 600 SF ND No

116-GP-A,B,C Glue pod FS-89 (wall) 20 SF ND No

117-FT-A,B,C 12”x12” army green floor tile FS-89 10 SF 2.75% Chrysotile

(mastic) ND (tile)

No

118-FT-A,B,C 9”x9” emerald green floor tile FS-89 10 SF 3% Chrysotile (mastic) 1.25% Chrysotile (tile) No

119-IC-A,B,C Interior caulk Corridor CH and

Corridor CF (east wing doors)

250 LF 1.75% Chrysotile No

120-SL-A,B,C Slate tables FS-81, FS-82, FS-85, FS-89 500 SF 8% Chrysotile No

121-CA-A,B,C Black construction adhesive FS-81, FS-82, FS-85, FS-89 (lab countertops) 80 SF ND No

122-EB-A,B,C Electrical fuse box Throughout 80 SF ND No 123-VD-A,B,C Vibration dampener Mechanical room 4 and FS-91 10 SF ND No 124-PF-A,B,C Pipe fitting (medium diameter) FS-58, FS-91, tunnels 300 fittings 6% Chrysotile Yes 125-RI-A,B,C Pink rolled-in insulation Throughout 2,500 SF ND Yes

126-IC-A,B,C Interior caulk FS-92 (classroom 110 conduit lines) 2 LF ND No

127-PI-A,B,C Fiberglass pipe insulation (medium diameter) with canvas wrap

Throughout (Debris noted from vandalism, particularly restrooms)

2,100 LF +

debris

6% Chrysotile (powdery material)

ND (insulation, backing, and canvas)

Yes

128-IC-A,B,C Gray interior caulk (patch) Corridor CH (walls) 15 LF 1.75% Chrysotile No 129-RI-A,B,C Register insulation Vestibules 20 SF ND Yes

130-ACI-A,B,C Air conditioning insulation FS-58 4 SF ND Yes 131-TI-A,B,C Tank insulation FS-58 (tank 117143) 700 SF ND Yes 132-BG-A,B,C Boiler gasket FS-58 (tank 117143) 4 gaskets ND No 133-TI-A,B,C Tank insulation FS-58 (large middle tank) 900 SF ND Yes

134-PI-A,B,C Pipe insulation (mag) FS-58, tunnels 650 LF + debris 7% Amosite Yes

135-TI-A,B,C Tank insulation FS-58 (tank by hall entrance) 650 SF 17% Chrysotile 8% Amosite Yes

136-PI-A,B,C Pipe insulation (horizontal large diameter) FS-58, tunnels 400 LF ND Yes

137-FS-A,B,C Floor sheeting FS-58 (catwalk) 150 SF 12% Amosite

(fibrous material) ND (sheeting)

No

138-PF-A,B,C Pipe insulation (vertical large diameter) FS-58, tunnels 400 LF + debris 10% Chrysotile

(fibrous material) ND (insul., mesh, rope)

Yes

139-IC-A,B,C Interior caulk FS-58 (doors) 40 LF 0.25% Chrysotile No

TABLE 1 Suspect Asbestos Containing Materials and Results

Sample ID No. Description Location Quantity

(LF/SF)

Present Asbestos/Type (2)

Friable Yes/No

(1) 140-CA-A,B,C Construction adhesive FS-58A (offices) 4 SF 0.5% Chrysotile No 141-PM-A,B,C Penetration mud FS-58A (office) 10 SF ND No

142-PI-A,B,C Pipe insulation (large line, painted gray) FS-58

600 LF + debris on catwalk

/ground 10% Amosite Yes

143-EC-A,B,C Exterior caulk Exterior (around blue metal doors) 300 LF 1.25% Chrysotile No

144-CC-A,B,C Concrete chip (composite) Exterior 1,200 SF ND No 145-BM-A,B,C Brick mortar Exterior 26,000 SF ND No

146-EC-A,B,C Exterior caulk Exterior (aluminum windows) 2,500 LF 2.5% Chrysotile No

147-WG-A,B,C Window glaze Exterior (aluminum windows) 80 windows ND No 148-EC-A,B,C Exterior caulk Exterior (building seams) 400 LF 1.5% Chrysotile No 149-PL-A,B,C Plaster (with blue stones) North end of building 900 SF ND Yes 150-VB-A,B,C Black vapor barrier Exterior (under plaster) 3,000 SF ND No

151-EC-A,B,C Exterior caulk North side of building (brick sign) 100 LF ND No

152-SS-A,B,C Sandstone North side of building (sign caps) 60 SF ND No

153-TP-A,B,C Transite slabs Roof underlips 2,100 SF 10% Chrysotile No 154-EC-A,B,C Exterior caulk Exterior (metal panels) 1,100 LF ND No 155-RI-A,B,C White rolled-in insulation Exterior (between bricks) 2,000 SF ND Yes

156-RM-A,B,C Roofing material (rolled tar over wood fiber, perlite, and vapor barrier) Roof 92,000 SF ND No

157-EC-A,B,C Black caulk Roof (downspouts) 150 LF ND No 158-FL-A,B,C Silver flashing Roof (lip) 92,000 SF ND No 159-EC-A,B,C Off-white caulk Roof (vent piping) 300 LF ND No 160-EC-A,B,C Dark gray caulk Roof (window perimeters) 55 windows ND No 161-WG-A,B,C White window glaze Roof 55 windows Trace Chrysotile No 162-EC-A,B,C Light gray caulk Roof 190 LF ND No 163-RP-A,B,C Black roof patching material Roof 100 SF ND No 164-EC-A,B,C Black caulk Roof (rubber seam patch) 100 LF ND No 165-EC-A,B,C White caulk Roof (brock perimeter) 70 LF ND No 166-EC-A,B,C Beige caulk Roof (wall vents) 75 LF 1.5% Chrysotile No

167-EC-A,B,C Brown caulk Roof (screws along gym perimeter) 50 LF ND No

168-EC-A,B,C Black caulk Roof (exterior metal seams-gym) 375 LF ND No

169-BT-A,B,C Black tar Roof (gym brick seam) 90 SF ND No 170-EC-A,B,C Black/gray caulk Roof (metal lip seams) 75 LF ND No

171-CC-

A,B,C,D,E,F,G White cementitious awning Roof 20,000 SF 0.25% Chrysotile No

172-EC-A,B,C White caulk Roof (gym air vent) 20 LF 0.5% Chrysotile No 173-VB-A,B,C Brown/black vapor barrier Roof (gym air vent) 20 LF ND No

174-RM-A,B,C Black/silver rolled roofing material over fiberglass and vapor barrier Pitched roofs 20,000 SF ND No

TABLE 1 Suspect Asbestos Containing Materials and Results

Sample ID No. Description Location Quantity

(LF/SF)

Present Asbestos/Type (2)

Friable Yes/No

(1) 175-AI-A,B,C Fiberglass insulation Roof (air handling unit) 50 SF ND No 176-EC-A,B,C White caulk Roof (air handling unit) 30 LF ND No

177-TI Boiler/Tank Insulation Boiler room * 2,100 SF ASSUMED Yes 178-IC Interior Caulk @ Tunnel Entrances Boiler Room * 30 LF ASSUMED No 179-BG Boiler Door Rope Gaskets Boiler Room * 16 SF ASSUMED Yes 180-PF Mudded Pipe Fitting Basement / Boiler Room/ Tunnels * 600 Fittings ASSUMED Yes 181-PI Straight Pipe Insulation Basement/ Boiler Room / Tunnels * 4,000 LF ASSUMED Yes

182-DI Duct Insulation Basement Fan Rooms * 1,270 SF ASSUMED Yes

183-VD HVAC Vibration Dampeners Basement Fan Rooms * 125 SF ASSUMED No

184-TP Transite Panels Basement Electrical Room 200 SF ASSUMED Yes

185-PG Pipe Gaskets Basement / Boiler Room / Tunnels * 20 Each ASSUMED No

186-FD Fire Doors Basement / Boiler Room / Tunnels * 8 Each ASSUMED No

Key: SF = Square Feet; LF = Linear Feet; CF = Cubic Feet; CY = Cubic Yards; UNQ = Unquantified; ND = No Asbestos Detected.

*Boiler Room/Basement/Tunnel areas were flooded and not accessible at the time of this survey. Also, access to some areas within the structure was not possible or limited due to unsafe conditions so additional suspect materials not identified in this report may be present within the building.

Materials and quantities listed are estimates for bidding purposes. The approximate quantity of ACM and materials contaminated with asbestos were estimated and Contractors that intend to bid on removal of this material should not rely on the exact quantities estimated in this report. Contractors should conduct an assessment of the property to determine the time and effort required to complete the scope of work for the proper removal and disposal of ACM and asbestos contaminated materials. Due to the likelihood that general debris may contain asbestos, the Contractor should dispose of room contents as ACM waste.

In the event additional suspect material is discovered during demolition activities, this material should be treated as presumed asbestos-containing material (PACM) in accordance with regulations 29 CFR 1926.1101 and 1910.1001 and other applicable state and local regulations and either sampled to confirm or nullify asbestos content or be treated as ACM and handled accordingly.

3. UNIVERSAL WASTE AND OTHER REGULATED MATERIALS

Atlas conducted a visual inspection of the building during the pre-demolition hazardous material assessment to identify the type, location and estimated quantity of regulated materials and universal wastes that may be generated during the demolition of the building. Removal and disposal of the materials identified below shall be in accordance with federal, state and local requirements as per the Resource Conservation and Recovery Act (RCRA). Contractors that remove the materials listed below should ensure that proper manifests, disposal and/or recovery is documented and provided to the Owner.

Identified Universal Waste and Other Regulated Materials are summarized in Table 2 below.

TABLE 2 Universal Waste and Other Regulated Materials

Material Type Quantity Locations

Exit Signs 19 Throughout School

Fluorescent Light Bulbs 400 Intact

Significant Amount Damaged on Floor

Throughout School

Fluorescent Light Fixtures 728 Throughout School

Misc. Chemical containers 15 Storage Room, Boiler Room and Throughout

Smoke Detectors 18 Throughout School

Thermostats 26 Throughout School

Security Cameras 2 Throughout School

Fire Extinguishers 15 Throughout the School

Coolers & Refrigerant 2 Coolers & 2 Cooling Units Kitchen

Underground Storage Tank 1 Exterior near Boiler Room/ Loading Dock

PCB Transformers ASSUMED 4-6 Basement Boiler Room / Electrical Room

(areas were flooded)

4. CONCLUSIONS AND RECOMMENDATIONS

4.1 Asbestos Containing Materials

The results of laboratory testing during the pre-demolition asbestos survey conducted at the property indicate that several types of building materials sampled were found to contain asbestos (ACM) and will require removal prior to demolition activities. There were also several materials were found to contain trace asbestos (<1%). While these materials are not considered to be ACM, OSHA standard 1926.1101 has sections that apply to asbestos materials with trace asbestos.

Contractors that may perform work onsite to remove identified asbestos containing materials should review the report, along with estimated quantities prior to completing cost estimates. If any additional materials are discovered during demolition/demolition activities that have not been identified in this report should be assumed to contain asbestos until sampling and analysis proves otherwise.

It should be noted that while some of the asbestos-containing materials were intact, there were also materials that have deteriorated or been vandalized and badly damaged. Some building areas are weathered, vandalized, flooded or piled with furniture therefore waste streams could be comingled and difficult to separate. Thermal Systems Insulation (TSI), mainly pipe insulation, has been stripped from piping and other building materials have collapsed due to structural issues and debris is found throughout on the ground. Additionally, the basement, boiler room and tunnel system were flooded at the time of the survey.

If ACM cannot be removed safely prior to demolition, the Contractor performing the work should comply with all requirements of OSHA and all building materials should be treated as ACM waste and disposed according to the requirements of NESHAP. If materials identified to contain asbestos can be removed safely they should be removed prior to demolition by a licensed abatement company.

Access to some areas within the structure were limited due to unsafe conditions and materials not identified in this report may be present within the building. The approximate quantity of asbestos materials and materials contaminated with asbestos were estimated and Contractors that intend to bid on removal of this material should not rely on the exact quantities estimated in this report. Contractors should conduct an assessment of the property to determine the time and effort required to complete the scope of work for the proper removal and disposal of asbestos and asbestos contaminated materials.

Non-friable ACM’s shall not be subjected to abrasion, grinding, sanding or any other processes during renovation activities which will render these non-friable materials friable.

Based on the NESHAP (National Emission Standards for Hazardous Air Pollutants) non-friable Category I ACM and Category I non-friable PACM roofing materials that are asphalt/tar based can be demolished with a building so long as it is in good condition and will not be cut, pounded, sanded, or grinded during demolition, and that measures are taken to ensure that it does not become friable, at which point will be considered RACM. This material can also be disposed off-site in a Class III, construction and demolition (C&D) debris, landfill within the framework of local/state regulations. In addition, all roofing materials shall not be recycled if they contain Category I ACM.

4.2 Universal Waste and Other Regulated Materials

Universal Waste and Other Regulated Materials remain in the school and should be properly collected, containerized, manifested, and disposed in accordance with federal, state and local requirements as per the Resource Conservation and Recovery Act (RCRA). Contractors that remove these materials should ensure that proper manifests, disposal and/or recovery is documented and provided to the Owner.

It should be noted that while some of these materials were intact, there were also materials that have deteriorated or been vandalized and broken. Some building areas are weathered, vandalized, flooded, or piled with furniture therefore waste streams could be comingled and difficult to separate.

4.3 Inaccessible Areas

Asbestos containing pipe insulation and mudded fittings may be present above ceilings or behind walls and in areas throughout the building that are not visible. The total linear footage of pipe insulation was estimated based on the understanding of piping systems in buildings and could fluctuate.

The following areas were inaccessible due to unsafe conditions and/or locked doors: FS-26, FS- 27, and FS-93. The southeast wing of the building was flooded, and the roof was caved in.

The basement, boiler room, and tunnels were flooded and could not be accessed at the time of survey. Other building areas were not structurally safe or were piled with debris and could not be entered. Quantities were estimated for bidding purposes. Additional suspect materials not identified in this report or revised quantities of other identified materials would be necessary.

5. ASSUMPTIONS AND LIMITATIONS

The results, findings, conclusions, and recommendations expressed in the report are based only on conditions that were noted during the pre-demolition inspection conducted by Atlas from June 22, 2026 through June 26, 2026. Conditions within the building may change over time. Selection of sample locations and frequency of sampling were based on EPA Guidance documents, Atlas’s observations, and the assumption that building vintage and demolition history information presented to Atlas allowed the proper designation of homogenous materials for each building.

The findings of this report represent Atlas’s professional judgment; no other warranty is expressed or implied. Please note that lighting was limited, there was extensive debris and structural damage within rooms and hallways, areas were flooded or had standing water within the structure that could have impaired our ability to access or view surfaces or materials.

This document does not contain the elements necessary for an Abatement Work plan, and this document does not contain, nor should it take the place of, technical specifications for ACM removal.

Our professional services have been performed, our findings obtained, and our conclusions and recommendations prepared in accordance with customary principles and practices in the fields of environmental science and engineering. This statement is in lieu of other statements either expressed or implied. This report does not warrant against changes to material from future operations or conditions, nor does it warrant against operations or conditions against present ACM material in locations not investigated. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user.

Suspect asbestos samples were submitted for analysis at an NVLAP-accredited laboratory via polarized light microscopy. The report represents the conditions during which the survey was performed and locations where the suspect asbestos samples were collected. Inferences were based on the results of the sampling and related testing to form a professional opinion of conditions in areas beyond those from which the samples were collected. No warranty, expressed or implied, is made.

This report is prepared to assist the building owner, architect, construction manager, general contractors, and potential measures in locating the referenced hazardous materials. The limitations of the survey may not qualify this report to be adequate for all regulatory applications.

Atlas’s recommendations are based in part on federal, state, local regulations, and guidelines.

Atlas does not undertake responsibility for reporting to any local, state, or federal public agencies of conditions at the site that may present a potential danger to public health or safety. Atlas recommends that the Client comply with regulations and response actions in accordance with federal, state, and local regulations.

APPENDIX A

Subject Property Photolog

Photographic Documentation

DPSCD Murphy Pre-Demolition Atlas Project No. 188BS26308 1

Photo 1.

View of main entrance corridor

Photo 2.

FS-1

Photo 3.

FS-2

Photo 4.

FS-3

Photo 5.

FS-4

Photo 6.

FS-4 offices

Atlas Project No. 188BS26308 2

Photo 7.

View of corridor

Photo 8.

FS-13

Photo 9.

Photo 10.

FS-14

Photo 11.

FS-15

Photo 12.

FS-16

Atlas Project No. 188BS26308 3

Photo 13.

FS-17

Photo 14.

Corridor shot

Photo 15.

FS-18

Photo 16.

FS-19

Photo 17.

FS-20

Photo 18.

FS-21

Atlas Project No. 188BS26308 4

Photo 19.

Back corridor

Photo 20.

Corridor CH

Photo 21.

Southeast corridor

Photo 22.

FS-22

Photo 23.

FS-23

Photo 24.

FS-24

Atlas Project No. 188BS26308 5

Photo 25.

FS-26

Photo 26.

FS-27

Photo 27.

FS-28

Photo 28.

Fs-29

Photo 29.

South exit

Photo 30.

FS-30

Atlas Project No. 188BS26308 6

Photo 31.

FS-31

Photo 32.

FS-32

Photo 33.

FS-33

Photo 34.

FS-34

Photo 35.

FS-35

Photo 36.

FS-36

Atlas Project No. 188BS26308 7

Photo 37.

FS-39

Photo 38.

FS-41

Photo 39.

FS-43: HVAC room above gym storage

Photo 40.

FS-44

Photo 41.

FS-45

Photo 42.

FS-46

Atlas Project No. 188BS26308 8

Photo 43.

FS-47

Photo 44.

FS-49

Photo 45.

FS-50

Photo 46.

FS-51

Photo 47.

FS-52

Photo 48.

FS-53

Atlas Project No. 188BS26308 9

Photo 49.

FS-54

Photo 50.

FS-54A

Photo 51.

HVAC room above stage

Photo 52.

FS-55

Photo 53.

FS-56

Photo 54.

FS-57

Atlas Project No. 188BS26308 10

Photo 55.

FS-58

Photo 56.

FS-59

Photo 57.

FS-59

Photo 58.

FS-61

Photo 59.

FS-60

Photo 60.

FS-62

Atlas Project No. 188BS26308 11

Photo 61.

FS-63

Photo 62.

Office Corridor

Photo 63.

FS-64

Photo 64.

FS-65

Photo 65.

FS-66

Photo 66.

FS-67

Atlas Project No. 188BS26308 12

Photo 67.

Storage Closet

Photo 68.

FS- 77 Library

Photo 69.

FS-78

Photo 70.

FS-79

Photo 71.

FS-80

Photo 72.

FS-81

Atlas Project No. 188BS26308 13

Photo 73.

FS-82

Photo 74.

FS-83

Photo 75.

FS-84

Photo 76.

FS-85

Photo 77.

FS-86

Photo 78.

FS-87

Atlas Project No. 188BS26308 14

Photo 79.

FS-88

Photo 80.

FS-89

Photo 81.

FS-90

Photo 82.

FS-91

Photo 83.

FS-92

Photo 84.

FS-93

Atlas Project No. 188BS26308 15

Photo 85.

FS-94

Photo 86.

FS-95

Photo 87.

FS-96

Photo 88.

FS-97

Photo 89.

Photo 90.

View of security desk

Atlas Project No. 188BS26308 16

Photo 91.

View of atrium

Photo 92.

View of atrium water fountain area

APPENDIX B

Sample Location Map

Functional Space Map 1st Floor

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 1

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

Sampling Location Map

HAs 1-20

DPSCD Murphy Pre-DemO

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 2

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

1-BM-A

18-IC-A

1-BM-B

2-FT-A,B,C

3-FT-A

4-FT-A,B,C

5-FT-A,B,C

6-FT-A,B,C

7-CB-B

8-CP-A,B,C

1-BM-C

3-FT-B

3-FT-C

7-CB-A

7-CB-C

9-WG-A

10-IC-A

11-FD-A

16-GP-A,B,C

9-WG-C

10-IC-C

11-FD-C

9-WG-B

10-IC-B

11-FD-B

12-EP-A

13-PI-B

15-IC-A

12-EP-C

12-EP-B

13-PI-C

13-PI-A

14-CC-A,B,C

15-IC-B

15-IC-C

17-PL-A

17-PL-B

17-PL-C

17-PL-D

19-FT-A

17-PL-E

17-PL-F

17-PL-G

17-PL-H

17-PL-I

18-IC-B,C

20-FT-C

19-FT-B

19-FT-C

20-FT-B

20-FT-C

HAs 21-40

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 3

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

21-VD-A,B,C

22-FT-A

22-FT-B

22-FT-C

23-PL-C,D

23-PL-E,F

23-PL-A,B

23-PL-G

24-CT-A

25-CT-A,B,C

24-CT-B

34-PL-A,B

24-CT-C

27-WG-A

28-GM-A

26-CA-A,B,C

29-FT-B

34-PL-E,F

27-WG-B

28-GM-B

27-WG-A

28-GM-A

29-FT-A

30-WG-A 30-WG-B

30-WG-C

31-FD-A,B,C

37-PL-B

32-GP-A,B,C

33-GM-A,B,C

34-PL-C,D

34-PL-G

35-PF-A,B35-PF-C

36-VD-A,B,C

37-PL-C

37-PL-A

38-WG-A,B,C

39-GM-A,B

45-GM-A

39-GM-C

40-GM-B,C

HAs 41-60

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 4

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

42-VB-A,B,C

43-GP-A,B,C

44-PL-A,B,C

45-FC-A,B,C

46-FM-A,B,C

47-DI-A,B,C

48-VD-A,B,C

50-FM-A,B,C

51-FC-A,B,C

52-PL-A,B,C

49-PI-C

49-PI-B

57-FT-B

49-PI-A

57-FT-A

53-CC-A,B,C

54-VD-A,B,C

55-IC-A,B,C

56-DI-A,B,C

57-FT-C

58-FT-A,B,C

58-FT-A,B,C

59-GM-A,B,C

60-GM-A,B,C

HAs 61-80

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 5

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

61-IC-A,B,C

62-PL-A,B,C

63-GP-A,B,C

64-CT-A,B,C

65-WG-A,B

74-BM-C

65-WG-C

66-IC-A

66-IC-B

66-IC-C

69-IC-A,B,C

70-GM-A,B,C

69-WG-A,B,C

70-CS-A,B,C

71-EP-A,B,C

73-CC-A,B,C

74-BM-A

74-BM-B

75-FT-A,B,C

76-FS-A,B,C

77-GP-C 77-GP-A77-GP-B

78 WG-A,B

79-PL-A

80-GM-A

78-WG-C

79-PL-B

80-GM-B,C

79-PL-C 79-PL-D, E

72-GM-A,B,C

HAs 81-100

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 6

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

81-IC-A

100-EPP-A 81-IC-B

81-IC-C

82-FD-A

82-FD-B

82-FD-C

83-IC-C

83-IC-A

97-IC-A,B

83-IC-B

84-IC-A

84-IC-B

84-IC-B

85-WG-A

85-WG-B

85-WG-C

86-GP-A

87-CT-A

86-GP-B

87-CT0B

86-GP-C

87-CT-C

88-CC-A,B

89-CB-A

88-CC-C

89-CB-B,C

90-WG-A 90-WG-B 90-WG-C

91-GM-A,B

92-GM-A

96-IC-A

91-GM-C

92-GM-B,C

96-IC-B

93-GM-C

93-GM-A,B

96-IC-C

94-GM-A,B,C

97-IC-C

95-WG-A

99-IC-A,B,C

95-WG-B

95-WG-C

98-FT-A

98-FT-B

98-FT-C

100-EPP-B

100-EPP-C

HAs 101-120

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 7

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

101-PL-A,B,C

85-WG-A

98-FT-C

102-IC-A,B,C

102-IC-A,B,C

103-IN-A,B,C

104-GP-A,B,C

105-CG-A,B,C

106-CB-A,B,C

107-WG-A,B,C

108-IB-A,B,C

109-IC-A

112-GM-A,B,C

113-GM-A,B,C

109-IC-B

109-IC-C

110-PL-B

110-PL-A

110-PL-C

119-IC-A,B,C

111-IC-A,B,C

114-IC-A

114-IC-B,C

115-WBS-A,B,C

116-GP-A,B,C

117-FT-A,B,C

118-FT-A,B,C

120-SL-A

120-SL-B,C

HAs 121- 140

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 8

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

85-WG-A

98-FT-C

109-IC-B

122-EB-A

125-RI-A

122-EB-B,C

123-VD-A,B,C

124-PF-B

124-PF-C

128-IC-A,B,C

121-CA-A

121-CA-B,C

124-PF-A

127-PI-C

131-TI-A,B,C

132-BG-A,B,C

133-TI-A,B,C

134-PI-A,B,C

135-TI-A,B,C

136-PI-A,B,C

138-PF-A,B,C

125-RI-B

125-RI-C

130-IC-A,B,C

137-FS-A,B,C

139-IC-A,B,C

140-CA-A,B,C

126-IC-A,B,C

127-PI-B

127-PI-A

129-RI-A,C 129-RI-A,B

HAs 141-155

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KR REVIEWED BY Atlas

FIGURE: 9

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

146-EC-C

147-WG-C

109-IC-B

145-BM-B

153-TP-A,B,C

154-EC-A

155-RI-A,B,C

122-EB-B,C

123-VD-A,B,C

124-PF-B

145-BM-A

146-EC-B

147-WG-B

143-EC-A

126-IC-A,B,C

146-EC-A

147-WG-A

148-EC-B

150-VB-C

144-CC-C 144-CC-B

141-PM-A,B,C

142-PI-A,B,C

143-EC-B

148-EC-A

143-EC-C

148-EC-C

144-CC-A

149-PL-A 149-PL-B 149-PL-C

150-VB-A

150-VB-B

152-SS-A,B,C

154-EC-B

154-EC-B

Roof

HAs 156-176

DPSCD Murphy Pre-Demo

PROJECT NUMBER: 188BS26308

DRAWN BY: KB REVIEWED BY Atlas

FIGURE: 9

DATE: 7/15/2026

4 6 5 5 5 H u m b o l d t D r i v e , S u i t e 1 0 0 N o v i , M i c h i g a n 4 8 3 7 7 P h : ( 2 4 8 ) 6 6 9 - 5 1 4 0 ~ F a x : ( 2 4 8 ) 6 6 9 - 5 1 4 7

171-CC- A,B 171-CC- C,D

171-CC- E,F,G

171-CC- A,B

159-EC-B

160-EC- B

161-WG- B

167-EC- A

170-EC- C

158-FL- A

157-EC- A,B

165-A,B,C

156-RM-A

156-RM-A

156-RM-C

157-EC- C

158-FL- B

158-FL- C

170-EC- B

170-EC- A

167-EC- B 167-EC- C

160-EC- A

161-WG- A

160-EC- C

161-WG- C

159-EC-C

159-EC -A

166-EC-A,B,C

174-RM- A,B 175-AI- A,B,C

176-EC-A,B,C

172-EC- A,B,C

173-VB-A,B,C

168-EC-A

169-BT-A

163-RP-C

164-EC-C

163-RP- A

164-EC-A

162-EC-B

163-RP-B

164-EC-B

162-EC-C

162-EC-A 168-EC-B

169-BT-B

168-EC-C

169-BT-C

APPENDIX C

Asbestos Laboratory Report

Environmental Testing Laboratories, Inc.

37575 W Huron River Drive Romulus, Michigan 48174

(734) 955-6600

Fax: (734) 955-6604

To:

Attention:

Atlas - Novi

46555 Humboldt Dr. Suite 100

Novi, Michigan 48377

Project Location: DPS Murphy Demo

Client Project: 188BS26308

292533ETL Job:

Jennifer Fashbaugh

Report Issued: 07/15/2026

Lab Sample Number Client Sample Number Sample Type CompletedSampled Analyst

1907872 Asbestos1-BM-A 07/10/2026 Tia Ray06/26/2026

1907873 Asbestos1-BM-B 07/10/2026 Tia Ray06/26/2026

1907874 Asbestos1-BM-C 07/10/2026 Tia Ray06/26/2026

1907875 Asbestos2-FT-A 07/10/2026 Tia Ray06/26/2026

1907876 Asbestos2-FT-B 07/10/2026 Tia Ray06/26/2026

1907877 Asbestos2-FT-C 07/10/2026 Tia Ray06/26/2026

1907878 Asbestos3-FT-A 07/10/2026 Tia Ray06/26/2026

1907879 Asbestos3-FT-B 07/10/2026 Tia Ray06/26/2026

1907880 Asbestos3-FT-C 07/10/2026 Tia Ray06/26/2026

1907881 Asbestos4-FT-A 07/10/2026 Tia Ray06/26/2026

1907882 Asbestos4-FT-B 07/10/2026 Tia Ray06/26/2026

1907883 Asbestos4-FT-C 07/10/2026 Tia Ray06/26/2026

1907884 Asbestos5-FT-A 07/10/2026 Erica Marcos06/26/2026

1907885 Asbestos5-FT-B 07/10/2026 Erica Marcos06/26/2026

1907886 Asbestos5-FT-C 07/10/2026 Erica Marcos06/26/2026

1907887 Asbestos6-FT-A 07/10/2026 Erica Marcos06/26/2026

This report is intended for use solely by the individual or entity to which it is addressed. This report may not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. It may contain information that is privileged, confidential and otherwise exempt by law from disclosure. If the reader of this information is not the intended recipient or an employee of its intended recipient, you are herewith notified that any dissemination, distribution or copying of this information is strictly prohibited. If you have received this information in error, please notify ETL immediately. Thank you.

Lab Sample Number Client Sample Number Sample Type CompletedSampled Analyst

1907888 Asbestos6-FT-B 07/10/2026 Erica Marcos06/26/2026

1907889 Asbestos6-FT-C 07/10/2026 Erica Marcos06/26/2026

1907890 Asbestos7-CB-A 07/10/2026 Erica Marcos06/26/2026

1907891 Asbestos7-CB-B 07/10/2026 Erica Marcos06/26/2026

1907892 Asbestos7-CB-C 07/10/2026 Erica Marcos06/26/2026

1907893 Asbestos8-CP-A 07/10/2026 Erica Marcos06/26/2026

1907894 Asbestos8-CP-B 07/10/2026 Erica Marcos06/26/2026

1907895 Asbestos8-CP-C 07/10/2026 Erica Marcos06/26/2026

1907896 Asbestos9-WG-A 07/13/2026 OJ Ivey06/26/2026

1907897 Asbestos9-WG-B 07/13/2026 OJ Ivey06/26/2026

1907898 Asbestos9-WG-C 07/13/2026 OJ Ivey06/26/2026

1907899 Asbestos10-IC-A 07/13/2026 OJ Ivey06/26/2026

1907900 Asbestos10-IC-B 07/13/2026 OJ Ivey06/26/2026

1907901 Asbestos10-IC-C 07/13/2026 OJ Ivey06/26/2026

1907902 Asbestos11-FD-A 07/13/2026 OJ Ivey06/26/2026

1907903 Asbestos11-FD-B 07/13/2026 OJ Ivey06/26/2026

1907904 Asbestos11-FD-C 07/13/2026 OJ Ivey06/26/2026

1907905 Asbestos12-EP-A 07/13/2026 OJ Ivey06/26/2026

1907906 Asbestos12-EP-B 07/13/2026 OJ Ivey06/26/2026

1907907 Asbestos12-EP-C 07/13/2026 OJ Ivey06/26/2026

1907908 Asbestos13-PI-A 07/10/2026 Tia Ray06/26/2026

1907909 Asbestos13-PI-B 07/10/2026 Tia Ray06/26/2026

1907910 Asbestos13-PI-C 07/10/2026 Tia Ray06/26/2026

1907911 Asbestos14-CC-A 07/13/2026 OJ Ivey06/26/2026

1907912 Asbestos14-CC-B 07/13/2026 OJ Ivey06/26/2026

1907913 Asbestos14-CC-C 07/13/2026 OJ Ivey06/26/2026

This report is intended for use solely by the individual or entity to which it is addressed. This report may not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. It may contain information that is privileged, confidential and otherwise exempt by law from disclosure. If the reader of this information is not the intended recipient or an employee of its intended recipient, you are herewith notified that any dissemination, distribution or copying of this information is strictly prohibited. If you have received this

1907914 Asbestos15-IC-A 07/13/2026 OJ Ivey06/26/2026

1907915 Asbestos15-IC-B 07/13/2026 OJ Ivey06/26/2026

1907916 Asbestos15-IC-C 07/13/2026 OJ Ivey06/26/2026

1907917 Asbestos16-GP-A 07/13/2026 OJ Ivey06/26/2026

1907918 Asbestos16-GP-B 07/13/2026 OJ Ivey06/26/2026

1907919 Asbestos16-GP-C 07/13/2026 OJ Ivey06/26/2026

1907920 Asbestos17-PL-A 07/13/2026 Asha Davidson06/26/2026

1907921 Asbestos17-PL-B 07/13/2026 Asha Davidson06/26/2026

1907922 Asbestos17-PL-C 07/13/2026 Asha Davidson06/26/2026

1907923 Asbestos17-PL-D 07/13/2026 Asha Davidson06/26/2026

1907924 Asbestos17-PL-E 07/13/2026 Asha Davidson06/26/2026

1907925 Asbestos17-PL-F 07/13/2026 Asha Davidson06/26/2026

1907926 Asbestos17-PL-G 07/13/2026 Asha Davidson06/26/2026

1907927 Asbestos17-PL-H 07/13/2026 Asha Davidson06/26/2026

1907928 Asbestos17-PL-I 07/13/2026 Asha Davidson06/26/2026

1907929 Asbestos18-IC-A 07/13/2026 Asha Davidson06/26/2026

1907930 Asbestos18-IC-B 07/13/2026 Asha Davidson06/26/2026

1907931 Asbestos18-IC-C 07/13/2026 Asha Davidson06/26/2026

1907932 Asbestos19-FT-A 07/13/2026 Asha Davidson06/26/2026

1907933 Asbestos19-FT-B 07/13/2026 Asha Davidson06/26/2026

1907934 Asbestos19-FT-C 07/13/2026 Asha Davidson06/26/2026

1907935 Asbestos20-FT-A 07/13/2026 Erica Marcos06/26/2026

1907936 Asbestos20-FT-B 07/13/2026 Erica Marcos06/26/2026

1907937 Asbestos20-FT-C 07/13/2026 Erica Marcos06/26/2026

1907938 Asbestos21-VD-A 07/10/2026 Erica Marcos06/26/2026

1907939 Asbestos21-VD-B 07/10/2026 Erica Marcos06/26/2026

This report is intended for use solely by the individual or entity to which it is addressed. This report may not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. It may contain information that is privileged, confidential and otherwise exempt by law from disclosure. If the reader of this information is not the intended recipient or an employee of its intended recipient, you are herewith notified that any dissemination, distribution or copying of this information is strictly prohibited. If you have received this

1907940 Asbestos21-VD-C 07/10/2026 Erica Marcos06/26/2026

1907941 Asbestos22-FT-A 07/13/2026 Erica Marcos06/26/2026

1907942 Asbestos22-FT-B 07/13/2026 Erica Marcos06/26/2026

1907943 Asbestos22-FT-C 07/13/2026 Erica Marcos06/26/2026

1907944 Asbestos23-PL-A 07/13/2026 Erica Marcos06/26/2026

1907945 Asbestos23-PL-B 07/13/2026 Erica Marcos06/26/2026

1907946 Asbestos23-PL-C 07/13/2026 Erica…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .