ATTACHMENT J Drawings~27.pdf
PDF 606 KB Posted
- Solicitation number
- S-P34048-00016507
- Issued by
- Washington County, Barlow City, Oregon
About this file
This is a drawing attachment document for the Oregon school district's ITB 25-0025 project involving flooring replacement at Southridge High School. The drawings serve as technical specifications for the General Contractor bidding on the removal and replacement of carpet in various classrooms, hallways, common areas, and stair landings throughout the facility. The attachment provides detailed architectural and construction drawings that define the scope of work, material specifications, and installation requirements necessary for bidders to accurately estimate project costs and execution plans for both Phase 1 and Phase 2 of the flooring replacement initiative.
The drawings contained in this attachment are essential reference documents that establish the physical layout, dimensions, and technical requirements for the carpet removal and installation work. These drawings enable bidders to understand the project scope comprehensively, including the specific areas affected, the quantity of square footage involved, and any unique site conditions or constraints that may impact labor, materials, and scheduling. All prospective bidders are required to review these drawings in conjunction with the invitation to bid documents to prepare competitive and compliant proposals for the school district's consideration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Accordion wall location
Areas of work
SUMMER 2026Southridge High School: PHASE 1 - SECOND FLOOR AND STAIR LANDINGS andrea radona Polygon andrea radona Polygon andrea radona Polygon radonaan Callout Stair Landing radonaan Callout Stair Landing radonaan Callout Stair Landing radonaan Callout Stair Landing andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle radonaan Rectangle
Accordion wall location
Areas of work
Southridge High School: PHASE 2 - FIRST FLOOR SUMMER 2027 andrea radona Polygon andrea radona Polygon andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle radonaan Callout Walk-off mat tiles 8'-0" x 25'-0", approx.
radonaan Callout Walk-off mat tiles 7'-0" x 8'-0", approx.
andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle radonaan Rectangle
| Southridge Main Floor Plan 2017 |
| Southridge Upper Floor Plan 2017 |
| Southridge Lower Floor Plan 2017 |
File details come from the government source that posted it. Updated .