ATTACHMENT J Drawings~27.pdf

PDF 606 KB Posted

Attached to
ITB 25-0025 Southridge HS Flooring Replacement Phase 1 & Phase 2
Solicitation number
S-P34048-00016507
Issued by
Washington County, Barlow City, Oregon

About this file

This is a drawing attachment document for the Oregon school district's ITB 25-0025 project involving flooring replacement at Southridge High School. The drawings serve as technical specifications for the General Contractor bidding on the removal and replacement of carpet in various classrooms, hallways, common areas, and stair landings throughout the facility. The attachment provides detailed architectural and construction drawings that define the scope of work, material specifications, and installation requirements necessary for bidders to accurately estimate project costs and execution plans for both Phase 1 and Phase 2 of the flooring replacement initiative.

The drawings contained in this attachment are essential reference documents that establish the physical layout, dimensions, and technical requirements for the carpet removal and installation work. These drawings enable bidders to understand the project scope comprehensively, including the specific areas affected, the quantity of square footage involved, and any unique site conditions or constraints that may impact labor, materials, and scheduling. All prospective bidders are required to review these drawings in conjunction with the invitation to bid documents to prepare competitive and compliant proposals for the school district's consideration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Accordion wall location

Areas of work

SUMMER 2026Southridge High School: PHASE 1 - SECOND FLOOR AND STAIR LANDINGS andrea radona Polygon andrea radona Polygon andrea radona Polygon radonaan Callout Stair Landing radonaan Callout Stair Landing radonaan Callout Stair Landing radonaan Callout Stair Landing andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle radonaan Rectangle

Accordion wall location

Areas of work

Southridge High School: PHASE 2 - FIRST FLOOR SUMMER 2027 andrea radona Polygon andrea radona Polygon andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle radonaan Callout Walk-off mat tiles 8'-0" x 25'-0", approx.

radonaan Callout Walk-off mat tiles 7'-0" x 8'-0", approx.

andrea radona Rectangle andrea radona Rectangle andrea radona Rectangle radonaan Rectangle

Southridge Main Floor Plan 2017
Southridge Upper Floor Plan 2017
Southridge Lower Floor Plan 2017

File details come from the government source that posted it. Updated .