Addendum 1 ~2.pdf

PDF 261 KB Posted

Attached to
ITB 25-0025 Southridge HS Flooring Replacement Phase 1 & Phase 2
Solicitation number
S-P34048-00016507
Issued by
Washington County, Barlow City, Oregon

About this file

This is Solicitation Addendum No. 1 issued by the Beaverton School District's Business Services Procurement and Contracting department for ITB 25-0025, addressing the Southridge High School Flooring Replacement Phase 1 & Phase 2 project. The addendum clarifies specifications and product substitution requests submitted by bidders. Phase 1 construction is scheduled to commence June 15, 2026, with substantial completion by August 7, 2026, while Phase 2 is scheduled for summer 2027, commencing June 14, 2027, with substantial completion by August 6, 2027. The project involves removal and replacement of carpet flooring with new carpet tiles in classrooms and luxury vinyl tiles (LVT) in non-classroom areas including corridors, stair landings, and common spaces, along with subfloor preparation and finishing work. The original bid deadline was April 23, 2026, at 2:00 PM Pacific Time, with a non-mandatory pre-bid conference held April 6, 2026. Bids were to be submitted via OregonBuys.gov with opening occurring immediately thereafter.

The addendum specifically addresses two product substitution requests that were not approved: Amtico Signature Collection Wood LVT and Mannington Wild Horizons GT366 LVT. A bidder questioned the specification for a 20-mil wear layer LVT, suggesting it was problematic for high-traffic school corridors and proposing a 40-mil wear layer Mannington Amtico LVT alternative for extended wear life. The District rejected this recommendation and confirmed that the 20-mil wear layer specification remains unchanged. Bidders were required to acknowledge receipt of this addendum on the Bidder Certification form, and failure to do so could result in bid rejection. All other project requirements, including prevailing wage compliance, insurance coverage mandates, background check requirements, the 15% disadvantaged and minority business participation goal, 5% bid bond requirement, and retention of 5% on progress payments remain in full force and effect as outlined in the original ITB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Business Services Procurement and Contracting

1260 NW Waterhouse Rd Beaverton, OR 97006

(503) 356-4324

April 17, 2026

SOLICITATION ADDENDUM NO. 1

ITB 25-0025

Southridge HS Flooring Replacement Phase 1 & Phase 2

THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED:

This Addendum modifies the Invitation to Bid (ITB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB. Failure to do so may result in Proposal rejection. See the ITB regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing.

This addendum is to be acknowledged in the space provided on the Bidder Certification form supplied in the solicitation document. Failure to acknowledge receipt of this addendum may cause to reject your Bid.

The closing date: April 23, 2026 at 2:00 PM Pacific Time

CLARIFICATION/REVISIONS:

Substitution Request: Amtico Signature Collection | Wood – Not Approved

Substitution Request: Mannington, Wild Horizons GT366 – Not Approved

QUESTION: The Specified 20-mil weal layer LVT is a problematic long-term selection for a high traffic-heavy use high school corridor. We strongly suggest changing the Spec to the 40-mil wear layer Mannington Amtico LVT to provide a much longer wear life as needed for a public facility.

ANSWER: Not approved. Wear layer specification to remain 20-mil.

-END of Addendum

Marcos Campuzano Procurement & Contracting Beaverton School District