Attachment J.2 - QASP Template.docx

DOCX document 405 KB Posted

Attached to
World Trade Center Health Program Clinical Centers of Excellence (CCE)
Solicitation number
75D301-22-R-72142
Issued by

About this file

This document package includes a quality assurance surveillance plan template and details of a solicitation for the World Trade Center Health Program Clinical Centers of Excellence.

The quality assurance surveillance plan template provides guidelines for monitoring contractor performance under a contract and ensuring required performance standards are met. It defines roles and responsibilities of contracting officers and technical representatives in oversight. Identification of performance metrics and acceptable quality levels is outlined, along with methodology for surveillance, documentation, performance analysis, and issue resolution.

The solicitation seeks competitive proposals for establishing and operating Clinical Centers of Excellence to provide healthcare services to 9/11 responders and survivors. Services include contract management, quality assurance, member services and outreach, care coordination, communications, administering medical services, coordination of other health insurance benefits, and collecting clinical and operational data. The cost-reimbursement contracts are for a minimum of five years. Proposals are due by the date specified, and award will be made using a best-value tradeoff approach between the Centers for Disease Control and Prevention and contractors.

View the file

Other files

File Type Posted
75D301-22-R-72142 Revision 06-28-2022.doc DOC document
Questions and Answers 75D301-22-R-72142 complete corrected 06-10-2022.xlsx XLSX spreadsheet
Attachment J.16 - Invoice Format Updated.xlsx XLSX spreadsheet
75D301-22-R-72142 Revision 06-07-2022.doc DOC document
Attachment J.28 - Lifestyle Medicine SOP (Draft).pdf PDF
Attachment J.22 - Business Proposal Format Updated.xlsx XLSX spreadsheet
Questions and Answers 75D301-22-R-72142 complete.xlsx XLSX spreadsheet
75D301-22-R-72142 Revision 05-25-2022.doc DOC document
Attachment J.13 - HHS Subcontracting Plan Template.doc DOC document
Attachment J.25 - NYMA Member Volumes and Acuity.xlsx XLSX spreadsheet
Attachment J.12 - PastPresent Performance Questionnaire.docx DOCX document
Attachment J.9 - TGD 009 (Monthly Report).pdf PDF
Attachment J.14 - CUI-SSP (System Security Plan).docx DOCX document
Attachment J.18 - Change Request Control Log.xlsx XLSX spreadsheet
Attachment J.4 - TGD 003 (Semiannual Report).pdf PDF
Attachment J.20 - Activity_Codes.xlsx XLSX spreadsheet
Attachment J.24 - Case Management & Utilization Management SOP.pdf PDF
Attachment J.26 - Pharmacy Prior Authorizations SOP (Draft).pdf PDF
Attachment J.27 - Provider Blocks SOP (Draft).pdf PDF
Attachment J.19 - Quarterly Staffing Report Template.xlsx XLSX spreadsheet
Attachment J.11 - Partner and Sub Template.xlsx XLSX spreadsheet
Attachment J.15 - Question and Answer Template.xlsx XLSX spreadsheet
Attachment J.8 - TGD 007 (Timely Filing).pdf PDF
Attachment J.7 - BEAST for Responders.pdf PDF
Attachment J.17 - Change_Request_form.docx DOCX document
Attachment J.21 - Billing Labor Categories.xlsx XLSX spreadsheet
Attachment J.23 - Facilities Capital Cost of Money Factors Computation Template.pdf PDF
75D301-22-R-72142.doc DOC document
Attachment J.6 - BEAST for Survivors (Draft).pdf PDF
Attachment J.10 - Translation Guide.xlsx XLSX spreadsheet
Attachment J.16 - Invoice Format May 2022.xlsx XLSX spreadsheet
Attachment J.5 - Transfer Policy.pdf PDF
Attachment J.22 - Business Proposal Format.xlsx XLSX spreadsheet
Attachment J.1 - Acronym List.docx DOCX document
Attachment J.3 - Business Associate Agreement Template.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

TEMPLATE

Issued: November 11, 2016

TABLE OF CONTENTS

INTRODUCTION2
Purpose2
Performance Management Approach2
Performance Management Strategy3
ROLES AND RESPONSIBILITIES3
The Contracting Officer3
The Contracting Officer’s Technical Representative3
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS4
METHODOLOGIES TO MONITOR PERFORMANCE4
Surveillance Techniques4
Customer Feedback4
Acceptable Quality Levels4
QUALITY ASSURANCE DOCUMENTATION5
The Performance Management Feedback Loop5
Monitoring Forms5
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT5
Determining Performance5
Reporting5
Reviews and Resolution5
APPENDIX 1: EXAMPLE PERFORMANCE REQUIREMENTS SUMMARY7

APPENDIX 2: SAMPLE QUALITY ASSURANCE MONITORING FORM ………………………………………………………..10

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled [insert name of services]. This plan sets forth the procedures and guidelines [insert name of government monitoring/surveillance activity] will use in ensuring the required performance standards or services levels are achieved by the contractor.

Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by [insert name of program office/monitoring activity] to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

Performance Management Strategy The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

ROLES AND RESPONSIBILITIES

The Contracting Officer The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the [insert title of government authority for performance management: "contracting officer's representative (COR)," "contracting officer's technical representative (COTR)," "administrative contracting officer (ACO)," "quality assurance representative (QAR),” or "program manager (PM)"] and the contractor. The CO will designate one full-time [insert COR, COTR] as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

The Contracting Officer’s Technical Representative The contracting officer’s technical representative (COTR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COTR limitations are contained in the written appointment letter. The COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” [Adjust the following sentences to reflect the instant acquisition.] If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the contractor exceeds the service or performance level, it is eligible to receive an incentive or award fee as stated in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are (include those that apply)

· Random monitoring, which shall be performed by the COTR/COR designated inspector.

· 100% Inspection – Each month or quarter, the COTR/COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

· Periodic Inspection – COTR/COR typically performs the periodic inspection on a monthly or quarterly basis.

Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the [insert CO, COR, COTR], as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COTR/COR. The COTR/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving [insert names of any critical services], the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at [insert name of government activity receiving services].

QUALITY ASSURANCE DOCUMENTATION

The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

Monitoring Forms The government’s QA surveillance, accomplished by the [insert COR, COTR, ACO, QA, or PM], will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results [insert service or quality levels] are being achieved.

The [insert COR, COTR, ACO, QAR, or PM] will retain a copy of all completed QA surveillance forms.

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. [insert when appropriate: Failure to meet the AQL may result in a deduction from the monthly payment, using the deduction percentages shown in Attachment 1. Likewise, if the contractor exceeds the performance standards, an incentive or award fee will be paid, in accordance with the incentive fee or award fee plan included in the contract.]

Reporting At the end of each month, the [insert title of person who will prepare the report – COR, COTR, ACO, QAR, or PM] will prepare a written report for the [insert title of government representative responsible for overall monitoring of performance – COR, COTR, ACO, QAR, or PM] summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

Reviews and Resolution

The [insert title of government representative responsible for overall monitoring of performance – COR, COTR, ACO, QAR, or PM] may require the contractor’s project manager, or a designated alternate, to meet with the [insert CO, ACO, COR, COTR, QAS, or PM] and other government IPT personnel as deemed necessary to discuss performance evaluation. The [insert CO, ACO, COR, COTR, QAR, or PM] will define a frequency of in- depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the [insert COR, COTR, ACO, QAR, or PM] as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly/Quarterly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months/quarters and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· [insert if appropriate: Issues arising from the performance monitoring processes]

The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

The [insert COR, COTR, ACO, QAR, or PM] and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.

APPENDIX 1. EXAMPLE PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective
PWS Ref.
Performance Threshold
Surveillance Method
Defect and Remedy
Operation and management
Section #.#
Responsiveness of communication: acknowledge requests and provide initial responses by the next business day

Timely submission and quality of deliverables: submit high-quality products within the provided timeframe

Timely reporting of budget spent and projection that is consistent with invoices submitted for cost reimbursement.

Routine review correspondence and deliverables records.

Thorough review of budget reports and invoice, with supporting documents (including staffing list, quarterly and monthly).

Two (2) late responses or rejection of invoices during a six (6)-month period will lower the contractor performance rating. Three (3) late submissions per six (6) months will require a corrective action plan.

Pharmacy Benefits Management (PBM)
Section #.#
Operations Manual reflects the appropriate protocols and procedures to be in compliance with the Program’s Administrative Guidance on managing the pharmacy benefit.

Billed pharmacy products align with allowable and member-specific benefits Prior authorizations for pharmacy products are appropriately justified and recorded for audit.

Staffing plan is cost-effective in terms of staffing mix and assigned tasks

Review of the Operations Manual for the pharmacy management section.

Random records review to verify administrative record of member eligibility for specific pharmacy benefits

Thorough review of contract deliverables and reports supporting invoicing:

· PBM section of the Operations Manual (initial and annual updates)

· Monthly and semi-annual reports supporting the infrastructure cost for PBM.

Absence of an appropriate pharmacy management section in the Operation Manual requires an immediate corrective action plan.

Absence of records indicating appropriate member-specific pharmacy utilization review and approval requires immediate correction and ongoing process quality auditing.

Trend of invoicing for PBM services that are not sufficiently supported will result in a corrective action plan

Fraud, Waste, and Abuse Report
Section #.#
The semi-annual Fraud, Waste, and Abuse Report shall be submitted no later than 30 days from the end of the 6-month reporting period 100% of the time
Timely submission and quality of report.
One (1) late submission per six (6) months will require an immediate corrective action plan.
Conduct Quality Assurance Internal Audits
Section #.#

Internal quality assurance audit approaches align with an approved and current Quality Assurance Plan (QAP) are aligned with Program’s guidance and Administrative Manual.

The findings from Technical Guidance for Quality Assurance and Internal Audits and Summary of Services and Requirements Selected for Inspection shall be reported semi-annually within 45 days from the end of the reporting period.

Random monitoring/ periodic inspection as agreed upon between the contractor and WTC Health Program.

Thorough review of contract deliverables and semi-annual report Absence of the QAP requires an immediate corrective action plan.

One (1) late submission per six (6)- month reporting period will require an immediate corrective action plan.

HIPAA Compliance and Business Associate Agreement
Section #.#
All suspected breaches by either the CCE or their subcontractors will be reported to the CO, COR, and WTC Health Program HIPAA Privacy Officer within 10 days of discovery 100% of the time. HIPAA training for employees required annually at minimum.
100% inspection

Review of training records; training requirement stated in Operations Manual.

One (1) late submission of HIPAA breach notification or one (1) missing record of annual required staff training during the performance period will require a corrective action plan.

Member’s Valid Complaints about Care, Services or Staff

Section #.#
WTC Health Program should receive no more than two (2) valid* complaints from members about contractor performance during a quarter.

*“Valid” means that WTC Health Program has sought input from the contractor and confirmed that the complaint is real and has merit.

100% inspection based on information maintained by WTC Health Program

Three (3) valid complaints per six (6) months will lower the contractor performance rating. Six (6) valid complaints per six (6) months will require a corrective action plan.

Intensive Case Management Services
Section #.#
Intensive Case Management (ICM) Operations Plan is aligned with Program’s definition of Intensive Case Management

· Current (within 4 months) Plan of Care is on file for each member receiving ICM services

· Staffing plan is cost-effective in terms of staffing mix and assigned tasks

Random records review for member-specific Plan of Care for members receiving ICM services

Thorough review of contract deliverables and reports supporting invoicing:

· ICM Operations Plan (initial and annual updates)

· Monthly and semi-annual reports supporting the infrastructure cost for ICM

Absence of the ICM Operations Plan requires an immediate corrective action plan.

Absence of a Plan of Care for a member receiving ICM services requires correction and assurance of appropriate internal process QA.

Trend of invoicing for ICM services that are not sufficiently supported will result in a corrective action plan

Maintain Internal Provider Network
Section #.#
Ensure all internal service- rendering providers are appropriately credentialed and trained, and are enrolled in the WTC Health Program’s Provider Network before CCE approves claims for submission.

The CCE shall maintain a current list of providers and no more than one (1) provider shall not be on the list; the CCE shall notify the HPS Contractor of any changes to the list within one (1) month.

Random monitoring/ periodic inspection as agreed upon between contractor and WTC Health Program

Credentialing and training records

Denied claims records due to providers not enrolled.

Any failure to meet the QA check is immediately rectified by the CCE. Two (2) consecutive months of failing to meet the QA measure will result in a corrective action plan (for care coordination) and/or lower performance rating.

Provide Summary Reports to Physical Exam Physicians
Section #.#
The Contractor shall ensure that the physician who conducts the physical examination always has a copy of the summary report in time to review it before conducting the responder’s physical examination.
Random monitoring/ periodic inspection as agreed upon between contractor and WTC Health Program
If more than one (1) of the summary reports are not provided in a timely manner per month, a corrective action plan will be required and it will result in a lower performance rating.
Controlling the Use of Diagnostic Services
Section #.#
The Contractor shall comply with Program policy, procedure, and technical guidance regarding the use of the “diagnostic plan” for medical and pharmacy services outside of treating a certified health condition 100% of time.
Random monitoring/ periodic inspection as agreed upon between contractor and WTC Health Program
If any of the three (3) performance thresholds are not met for two (2) consecutive months, it will result in a lower performance rating. If two

(2) of the performance thresholds are not met in a month, a corrective action plan is required.

Acquiring previous medical records
Section #.#
Each month, request signature of members for needed medical records release forms 100% of the time; request records from previous providers within three (3) days of contractor receiving properly completed and signed release form (copies are acceptable) 100% of the time; follow-up with previous providers within 15 days 100% of the time.
Random monitoring/ periodic inspection as agreed upon

between the contractor and WTC Health Program If any of the three (3) performance thresholds are not met for two (2) consecutive months, it will result in a lower performance rating. If two (2) of the performance thresholds are not met in a month, a corrective action plan is required.

Review, approve, and submit the appropriate claims
Section #.#
Comply with Timely Filing Policy (November 23, 2015). This requires that 95% of all internal claims be submitted within 1 month of date of service, 80% of external claims without COB be submitted within 12 months of the date of service, and 75% of external claims with COB be submitted within 15 months of date of service.

Random monitoring/ periodic inspection as agreed upon between the contractor and WTC Health Program Any claims not reviewed each month will result in re-performance of the review. If at least three (3) claims do not meet the performance threshold for two (2) consecutive months, it will result in a lower performance rating. If at least six (6) claims do not meet the performance threshold for two (2) consecutive months, a corrective action plan is required.

APPENDIX 2: SAMPLE QUALITY ASSURANCE MONITORING FORM

SERVICE and STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Contract Discrepancy Report (CDR).

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate:% Service Provider’s Performance (Check):Meets Standards
Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: DATE:

File details come from the government source that posted it. Updated .