Attachment J.2 - API Post Repair-CMB-FAC 7205-FY19.pdf
PDF 5 MB Posted
- Attached to
- SP-POL-CMP-INSPECT-FY24-CMB Federal contract opportunity
- Solicitation number
- W9128F24Q0017
About this file
This document is an API 653 inspection report for storage Tank A7205 located at Fort Campbell, Kentucky. The report details 23 repairs and upgrades completed on the tank, including replacing the grounding system, containment sealant, water draw-off piping, tank stairs, manways, vents, internal access ladder, perimeter handrails, internal floating roof seals, tank coatings, internal steel plates, level alarm systems, roof manway, scaffold supports, stilling wells, thermal relief piping and connections, slip-on flanges, plug valve, internal piping, pipeline coatings, hardware, and data plate. Inspection intervals are also provided, with the next in-service inspection scheduled for 2024 and out-of-service inspection for 2039. This report determines the tank is suitable for return to service following the repairs.
The related federal contract opportunity is solicitation number W9128F24Q0017 for SP-POL-CMP-INSPECT-FY24-CMB with the Department of the Army Corps of Engineers Omaha District for petroleum, oils and lubricants inspection and compliance services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J.3 -API Post Repair-FAC A6624-FY19.pdf | ||
| Attachment A - General Installation Security Requirements.docx | DOCX document | |
| Attachment J.1 - FAC 7205 API 653 OOS Insp FY17.pdf | ||
| Attachment D - Monthly Contractors Progress Management and Status Report.xlsx | XLSX spreadsheet | |
| Attachment I - API External Inspection Report Template.docx | DOCX document | |
| Attachment J.4 - FAC A6624 API 653 OOS Insp FY17.pdf | ||
| W9128F24Q0017 Solicitation.pdf | ||
| Attachment B - Ft. Campbell Tank Info.xlsx | XLSX spreadsheet | |
| Attachment C - Tank Data Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Omaha District
API 653 Repair Inspection Report - Final
Fort Campbell Facility Number 7205 (Oasis Rapid Fuel)
Tank Number A7205
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
(USACE POL-MCX)
14 June 2019
API 653 Repair Inspection Tank A7205 Fort Campbell, KY
Table of Contents
ACRONYMS AND ABBREVIATIONS
SUITABILITY FOR SERVICE MEMORANDUM
TANK REPAIRS
1. Exothermically Welded Connections to the Grounding Lugs
2. Containment Area Sealant
3. Water Draw-Off System
4. Tank Stairs
5. 24” Manway
6. Roof Vents
7. Internal Access Ladder
8. Roof Perimeter Handrail
9. Internal Floating Roof Seals
10. Tank Coatings
11. Internal Steel Plates
12. High and High-High Level Alarm System
13. Low and Low-Low Level Alarms
14. Roof Manway
15. Scaffold Cable Supports
16. Stilling Wells
17. Thermal Relief Piping/Threaded Connections
18. Slip-on Flanges
19. DB&B Plug Valve – Thermal Relief
20. Internal Piping
21. Pipeline Coatings
22. Carbon Steel Hardware
23. Tank Data Plate
APPENDIX A: ENGINEERING DRAWINGS
Bottom Thickness
Bottom Critical Zone Thickness
ACRONYMS AND ABBREVIATIONS
API
ASME
ASNT
ATG
American Petroleum Institute
American Society of Mechanical Engineers
American Society of Non-Destructive Testing
Automatic Tank Gauge
BBL Barrel
CFR Code of Federal Regulations
CP Cathodic Protection
DFT Dry Film Thickness
HLA High Level Alarm
HLCS High Level Control Shutoff
HHLA High-High Level Alarm
LLA Low Level Alarm
LLLA Low-Low Level Alarm
MFL Magnetic Flux Leakage
MT Magnetic Particle Testing
NACE National Association of Corrosion Engineers
NDT Non-Destructive Testing
NFPA National Fire Protection Association
PSI Pounds per Square Inch
PT Penetrant Testing
P/V Pressure/Vacuum
RP Recommended Practice
PST Product Saver Tank
RT Radiography Testing
TML Thickness Measurement Location
TRV Thermal Relief Valve
UFC Unified Facilities Criteria
UFGS Unified Facilities Guide Specifications
ULS Ultra-Low Sulfur
UT Ultrasonic Testing
VT Visual Testing
SUITABILITY FOR SERVICE
MEMORANDUM
STORAGE TANK NO. A2705
Out-of-Service API 653 Tank Inspection and Repair
Contract No. W9128F-14-R-0048-RFP-63 Fort Campbell, KY
Tank A7205 was inspected 14 June 2019. An API 653 Repair Inspection was performed by Darrin Laughlin.
This tank report is an Appendix to the original API 653 tank report.
The tank is in suitable condition for return to service.
Mandatory Repairs
No mandatory repairs were required.
Other Repairs and Maintenance
1. Tank grounding repaired/upgraded
2. Containment area sealant repaired/replaced
3. Water draw-off system replaced
4. Tank stairs upgraded
5. Shell manway repaired (davit arm)
6. Roof vents replaced
7. Internal access ladder installed
8. Perimeter roof handrail installed
9. IFR repaired
10. Tank coatings repaired
11. Internal steel plates removed
12. High and High-High Level Alarms installed
13. Low and Low-Low Level Alarms replaced
14. Roof manway replaced
15. Scaffold cable supports installed on fixed roof
16. Stilling wells replaced
17. Thermal relief piping and threaded connections replaced
18. Slip-on flanged replaced
19. DB&B plug valve installed in thermal relief
20. Interior piping repaired/replaced
21. Pipeline coatings repaired
22. Carbon steel hardware replaced with stainless
23. New data plate provided g6pmxrjw Sticky Note Please change to "On this date DD MMM YY, the tank is in suitable condition for return to service."
G6CDQASM
Sticky Note CP system repair?
Low suction piping?
Add these to the list if they were completed.
Inspection Intervals
The next In-Service Inspection should occur in 5 years, and the next In-Service Inspection with UT thickness measurements should occur in 13 years in accordance with API 653.
The next Out-of-Service inspection should occur in 20 years.
This storage tank suitability for service evaluation has been completed in accordance with the requirements of API Standard 653, 5th Edition, Addendum 1, April 2018.
Prepared by:
Darrin A Laughlin US Tank Inspection Manager AmSpec API 653 Certified Inspector No. 29230
G6CDQASM
Provide dates for next inspections
TANK REPAIRS
1. Exothermically Welded Connections to the Grounding Lugs
OBSERVATION: New grounding lugs were installed
2. Containment Area Sealant
OBSERVATION: Sealant throughout containment was repaired/replaced
3. Water Draw-Off System
OBSERVATION: New water draw off piping was installed in a new 2” nozzle
4. Tank Stairs
OBSERVATION: Width of stairs was increased around high and high-high alarms
5. 24” Manway
OBSERVATION: New davit arm installed on 24” manway
6. Roof Vents
OBSERVATION: Perimeter roof vents were replaced
G6CDQASM
Is this a galvanized bolt and hook as per the DoD Standard AW 78-24-27?
7. Internal Access Ladder
OBSERVATION: A new internal access ladder was installed
8. Roof Perimeter Handrail
OBSERVATION: A new perimeter handrail was installed
Are these IFR hatch bolts stainless per the RFP?
9. Internal Floating Roof Seals
OBSERVATION: New primary and secondary wiper seals were installed. New seals were also installed on all IFR penetrations.
10. Tank Coatings
OBSERVATION: Damaged interior coatings were repaired, and the exterior was recoated
11. Internal Steel Plates
OBSERVATION: Unnecessary internal steel plates were removed
12. High and High-High Level Alarm System
OBSERVATION: New high and high-high level systems were installed
Were the coatings under the column base plate repaired per SOW item 1.2.1.2.21.c? Does not appear so.
13. Low and Low-Low Level Alarms
OBSERVATION: New low and low-low level systems were installed
14. Roof Manway
OBSERVATION: Circular roof manway was removed and patched, and a rectangular hatch was installed
15. Scaffold Cable Supports
OBSERVATION: Scaffold cable supports were installed on the tank roof
16. Stilling Wells
OBSERVATION: Carbon steel stilling wells were replaced with aluminum
Verify all roof flange bolts are stainless. Blind flanges for future SPAWAR work need to be stainless to allow easy removal at a later date.
17. Thermal Relief Piping/Threaded Connections
OBSERVATION: New piping was installed with socket welded connections
18. Slip-on Flanges
OBSERVATION: Slip-on flanges were replaced with weld-neck flanges
19. DB&B Plug Valve – Thermal Relief
OBSERVATION: DB&B plug valve was installed in thermal relief piping
20. Internal Piping
OBSERVATION: Internal piping was replaced
This repair should have been repairing the thermal relief system on the DB&B plug valve, not installing DB&B plug valve in thermal relief piping. Provide photo showing the completed work and correct heading if this was properly done.
21. Pipeline Coatings
OBSERVATION: All pipelines within the containment area were recoated
22. Carbon Steel Hardware
OBSERVATION: All carbon steel hardware was replaced with stainless steel
Issue and relief flange hardware was not specified in the RFP. Per item 1.2.1.2.25.a of the SOW "Provide and install stainless steel bolts, nuts and washers on shell manway, and all roof flanges and hatches in accordance with UFGS 33 52 43.13."
23. Tank Data Plate
OBSERVATION: A new data plate was provided for the tank
APPENDIX A: ENGINEERING DRAWINGS
Bottom Thickness The tank bottom is constructed of 11, 1/4”-thick, carbon steel plates, assumed to be A283-C. An MFL scan on the tank bottom revealed no areas of product-side or soil-side corrosion.
Bottom Critical Zone Thickness An MFL scan performed in the critical zone revealed no areas of product-side or soil-side corrosion.
Switch R10 & R11.
| W9128F-14-R-0048-RFP-63-API-653-Tank-Repairs-and-Coatings-Fort-Campbell |
| ACRONYMS AND ABBREVIATIONS |
| TANK REPAIRS |
| 1. Exothermically Welded Connections to the Grounding Lugs |
| 2. Containment Area Sealant |
| 3. Water Draw-Off System |
| 4. Tank Stairs |
| 5. 24” Manway |
| 6. Roof Vents |
| 7. Internal Access Ladder |
| 8. Roof Perimeter Handrail |
| 9. Internal Floating Roof Seals |
| 10. Tank Coatings |
| 11. Internal Steel Plates |
| 12. High and High-High Level Alarm System |
| 13. Low and Low-Low Level Alarms |
| 14. Roof Manway |
| 15. Scaffold Cable Supports |
| 16. Stilling Wells |
| 17. Thermal Relief Piping/Threaded Connections |
| 18. Slip-on Flanges |
| 19. DB&B Plug Valve – Thermal Relief |
| 20. Internal Piping |
| 21. Pipeline Coatings |
| 22. Carbon Steel Hardware |
| 23. Tank Data Plate |
| APPENDIX A: ENGINEERING DRAWINGS |
| Bottom Thickness |
| Bottom Critical Zone Thickness |
| Drawing1 Layout1 (1) |
| Drawing1 Layout2 (1) |
| Drawing1 Layout3 (1) |