About this file

This document contains an API 653 external tank inspection report template for the US Army Corps of Engineers Omaha District. The template includes sections for general tank information, inspection comments, findings and recommendations, engineering calculations and drawings, 3D documentation analyses, API 653 checklists, and photographs. It provides a standardized format for API certified inspectors to document inspections of storage tanks and identify any mandatory repairs, short-term repairs, or long-term recommended repairs needed to comply with API, military, and regulatory standards.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

API 653 In-Service Inspection Report Installation, State

US Army Corps of Engineers Omaha District API 653 In-Service Inspection Report

[Location] [Facility Number] [Tank Number]

US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants

(USACE POL-MCX)

[DATE]

Table of Contents

ACRONYMS AND ABBREVIATIONS3
GENERAL SUMMARY4
INSPECTION DATE5
STATE REGULATIONS6
PREVIOUS INSPECTION DATES6
RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)6
GENERAL TANK INFORMATION6
A.GENERAL PROJECT INFORMATION8
1.API 653 Inspection8
2.Site Information8
B.TANK INSPECTION COMMENTS8
1.Tank Construction8
2.Tank Foundation8
3.Tank Shell8
4.Tank Appurtenances8
5.Tank Coating8
6.Tank Piping System8
7.Fire Protection System8
8.Secondary Containment8
C.FINDINGS AND RECOMMENDATIONS8
1.MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards9
2.SHORT TERM REPAIRSREQUIRED REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards9
3.LONG TERM REPAIRSRECOMMENDED REPAIRS as Part of Regular Maintenance10
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS12
SHELL SETTLEMENT SURVEY12
SHELL THICKNESS CALCULATION13
SHELL UT MEASUREMENTS14
ROOF UT MEASUREMENTS15
SHELL NOZZLE / REPAD UT MEASUREMENTS16
CRITICAL ZONE SHELL THICKNESS17
SHELL LAYOUT DRAWING18
ROOF LAYOUT DRAWING19
NEXT INSPECTION20
OSHA ACCESS STRUCTURE REPORT21
APPENDIX B: 3-D DOCUMENTATION AND ANALYSIS22
OUT OF PLUMBNESS (VERTICALLY)23
ISOLATED SHELL DISTORTION24
OUT-OF-ROUNDNESSPAGEREF _Toc481572124 \h 25
APPENDIX D: API 653 CHECKLISTS FOR TANK INSPECTIONS30
APPENDIX E: PHOTOGRAPHS36

ACRONYMS AND ABBREVIATIONS

APIAmerican Petroleum Institute
ASMEAmerican Society of Mechanical Engineers
ASNTAmerican Society of Non-Destructive Testing
ATGAutomatic Tank Gauge
BBLBarrel
CFRCode of Federal Regulations
CPCathodic Protection
DFTDry Film Thickness
HLAHigh Level Alarm
HLCSHigh Level Control Shutoff
HHLAHigh-High Level Alarm
LLALow Level Alarm
LLLALow-Low Level Alarm
MFLMagnetic Flux Leakage
MTMagnetic Particle Testing
NACENational Association of Corrosion Engineers
NDTNon-Destructive Testing
NFPANational Fire Protection Association
PSIPounds per Square Inch
PTPenetrant Testing
P/VPressure/Vacuum
RPRecommended Practice
PSTProduct Saver Tank
RTRadiography Testing
TMLThickness Measurement Location
TRVThermal Relief Valve
UFCUnified Facilities Criteria
UFGSUnified Facilities Guide Specifications
ULSUltra Low Sulfur
UTUltrasonic Testing
VTVisual Testing

GENERAL SUMMARY

Summary of Inspection

INSPECTION DATE

API In-Service (External) Inspection Date: 1 January 20XX Equipment Used:

Manufacturer:
Model Number:
Calibration Method:

Inspector(s):

STATE REGULATIONS

State Regulation for API In-Service Tank InspectionsXX Years
State Regulation for API Out-of-Service Tank InspectionsXX Years

NOTE: If there are no state regulations for tank inspections then N/A shall reside in-place of the number of years between inspections. If state regulations reside, the recommended future inspections dates shall be based on whichever is more stringent between the API inspector’s calculations and the State regulations.

PREVIOUS INSPECTION DATES

API Out-of-Service (Internal) Inspection Date:1 January 20XX
API In-Service (External) Inspection Date:1 January 20XX

RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)

API Out-of-Service (Internal) Inspection Date:1 January 20XX
API In-Service (External) Inspection Date:1 January 20XX

[Name] [Title] [Company] API 653 Certified Inspector No. [XXXX]

GENERAL TANK INFORMATION

ITEM
DESCRIPTION

Owner

Location

Facility Number

Tank Number

State / Country

City

Inspection Date

Tank Manufacturer

Design Standard

Date of Construction

Tank Contents

Tank Serial Number

Tank Diameter

Shell Height

Product Height

Tank Capacity

Foundation

Construction
Bottom

Shell

Floating Roof

Fixed Roof

Material
Bottom

Shell

Floating Roof

Fixed Roof

Cathodic Protection

Interior Coating System

Exterior Coating System

Level Gauging

Overfill Protection

Piping
Receipt

Issue

Low Suction

Water Draw-Off

Level Alarms

Type of Internal Floating Roof

A. GENERAL PROJECT INFORMATION

1. API 653 Inspection

XXXX

2. Site Information

XXXX

B. TANK INSPECTION COMMENTS

1. Tank Construction

XXXX

2. Tank Foundation

XXXX

3. Tank Shell

XXXX

4. Tank Appurtenances

a. Geodesic Dome Roof

XXXX

b. Gauging

XXXX

c. Level Alarms

XXXX

d. Stairs and Platforms

XXXX

e. Grounding and Bonding

XXXX

5. Tank Coating

XXXX

6. Tank Piping System

XXXX

7. Fire Protection System

XXXX

8. Secondary Containment

XXXX

C. FINDINGS AND RECOMMENDATIONS

XXXX.

1. MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should remain out of service until these repairs are completed.

1. Title Observation: Description Reference: Description Recommendation: Description

Title Observation: Description Reference: Description Recommendation: Description

2. REQUIRED REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 StandardsSHORT TERM REPAIRS Recommended Short-term Repairs that directly relate to the long-term preservation of the asset. Short-term repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by Federal, State and Local Codes or by Military Criteria.repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by Federal, State and Local Codes or by Military Criteria.

1. Title Observation: Description Reference: Description Recommendation: Description

Title Observation: Description

3. RECOMMENDED REPAIRS as Part of Regular MaintenanceLONG TERM REPAIRS Recommended Long-term Repairs that directly relate to repair/upgrade of an asset to bring it up to the current standard from the standard at time of construction. Long-term Repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.

1. Title Observation: Description Reference: Description Recommendation: Description

Title Observation: Description

APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS

SHELL SETTLEMENT SURVEY

SHELL THICKNESS CALCULATION

SHELL UT MEASUREMENTS

ROOF UT MEASUREMENTS

SHELL NOZZLE / REPAD UT MEASUREMENTS

CRITICAL ZONE SHELL THICKNESS

SHELL LAYOUT DRAWING

ROOF LAYOUT DRAWING

NEXT INSPECTION

OSHA ACCESS STRUCTURE REPORT

APPENDIX B: 3-D DOCUMENTATION AND ANALYSIS

The purpose of this study is to determine the tank shell out-of-roundness, locations of buckled areas, flat spots, and peaking and banding at weld joints. Shell distortion can be caused by many conditions such as foundation settlement, over- or under-pressuring, high wind, poor shell fabrication, or various repair techniques or tank modifications.

Out-of-Plumbness (Verticality) - The measured out-of-plumbness for this tank is x.xx in. in the worst area located at xxx degrees. Refer to the Out-of-Plumbness (Verticality) diagram.

Out-of-Roundness –Measurements for out-of-roundness were taken in x to x-ft increments along the shell. The worst area among the measurements was an out-of-roundness of xxx-in. The shell lower that xx-ft. was not measured. Laser setup was performed along the floating roof. Refer to Out-of-Roundness diagram.

Isolated Shell distortion – Isolated measurements were also taken along the external shell adjacent to the shell manway and 12-in receipt near the 0 degree mark. . Refer to the Isolated Shell Distortion diagram.

Tank Bottom Elevation – Laser scans were also performed along the tank bottom. Refer to the diagram below for details. Bottom slope is made evident by the point cloud system. No significant edge settlement was noted.

OUT OF PLUMBNESS (VERTICALLY)

ISOLATED SHELL DISTORTION

OUT-OF-ROUNDNESS

OUT-OF-ROUNDNESS AT XX FT

APPENDIX D: API 653 CHECKLISTS FOR TANK INSPECTIONS

Tank In-Service Inspection Checklist

Item
Completed

X

C.1.1
Foundation

Measure foundation levelness and bottom elevations (see Annex B for extent of measurements).

C.1.1.1
Concrete Ring
a
Inspect for broken concrete, spalling, and cracks, particularly under backup bars used in welding butt-welded annular rings under the shell.
b
Inspect drain openings in ring, back of waterdraw basins and top surface of ring for indications of bottom leakage.
c
Inspect for cavities under foundation and vegetation against bottom of tank.
d
Check that runoff rainwater from the shell drains away from tank.
e
Check for settlement around perimeter of tank.
C.1.1.2
Asphalt
a
Check for settling of tank into asphalt base which would direct runoff rain water under the tank instead of away from it.
b
Look for areas where leaching of oil has left rock filler exposed, which indicates hydrocarbon leakage.
C.1.1.3
Oiled Dirt or Sand

Check for settlement into the base which would direct runoff rain water under the tank rather than away from it.

C.1.1.4
Rock

Presence of crushed rock under the steel bottom usually results in severe underside corrosion. Make a note to do additional bottom plate examination (ultrasonic, hammer testing, or turning of coupons) when the tank is out of service.

C.1.1.5
Site Drainage
a
Check site for drainage away from the tank and associated piping and manifolds.
b
Check operating condition of the dike drains.
C.1.1.6
Housekeeping

Inspect the area for buildup of trash, vegetation, and other inflammables buildup.

C.1.1.7
Cathodic Protection

Review cathodic protection potential readings.

C.1.2
Shells
C.1.2.1
External Visual Inspection
a
Visually inspect for paint failures, pitting, and corrosion.
b
Clean off the bottom angle area and inspect for corrosion and thinning on plate and weld.
c
Inspect the bottom-to-foundation seal, if any.
C.1.2.2
Internal (Floating Roof Tank)

Visually inspect for grooving, corrosion, pitting, and coating failures.

C.1.2.3
Riveted Shell Inspection
a
Inspect external surface for rivet and seam leaks.
b
Locate leaks by sketch or photo (location will be lost when shell is abrasive cleaned for painting).
c
Inspect rivets for corrosion loss and wear.

Tank In-Service Inspection Checklist Continued

Item
Completed

X

d
Inspect vertical seams to see if they have been full fillet lap-welded to increase joint efficiency.
e
If no record exists of vertical riveted seams, dimension and sketch (or photograph) the rivet pattern: number of rows, rivet size, pitch length, and note whether the joint is butt-riveted or lap-riveted.
C.1.2.4
Wind Girder (Floating Roof Tanks)
a
Inspect wind girder and handrail for corrosion damage (paint failure, pitting, corrosion product buildup), especially where it occurs at tack-welded junction, and for broken welds.
b
Check support welds to shell for pitting, especially on shell plates.
c
Note whether supports have reinforcing pads welded to shell.
C.1.3
Shell Appurtenances
C.1.3.1
Manways and Nozzles
a
Inspect for cracks or signs of leakage on weld joint at nozzles, manways, and reinforcing plates.
b
Inspect for shell plate dimpling around nozzles, caused by excessive pipe deflection.
c
Inspect for flange leaks and leaks around bolting.
d
Inspect sealing of insulation around manways and nozzles.
e
Check for inadequate manway flange and cover thickness on mixer manways.
C.1.3.2
Tank Piping Manifolds
a
Inspect manifold piping, flanges, and valves for leaks.
b
Inspect fire fighting system components.
c
Check for anchored piping which would be hazardous to the tank shell or bottom connections during earth movement.
d
Check for adequate thermal pressure relief of piping to the tank.
e
Check operation of regulators for tanks with purge gas systems.
f
Check sample connections for leaks and for proper valve operation.
g
Check for damage and test the accuracy of temperature indicators.
h
Check welds on shell-mounted davit clips above valves 6 in. and larger.
C.1.3.3
Autogauge System
a
Inspect autogauge tape guide and lower sheave housing (floating swings) for leaks.
b
Inspect autogauge head for damage.
c
Bump the checker on autogauge head for proper movement of tape.
d
Identify size and construction material of autogauge tape guide (floating roof tanks).
e
Ask operator if tape tends to hang up during tank roof movement (floating roof tanks).
f
Compare actual product level to the reading on the autogauge (maximum variation is 2 in.).
g
On floating roof tanks, when the roof is in the lowest position, check that no more than two ft of tape are exposed at the end of the tape guide.
h
Inspect condition of board and legibility of board-type autogauges.
i
Test freedom of movement of marker and float.
C.1.3.4
Shell-Mounted Sample Station
a
Inspect sample lines for function of valves and plugging of lines, including drain or return-to-tank line.
b
Check circulation pump for leaks and operating problems.

Tank In-Service Inspection Checklist Continued

Item
Completed

X

c
Test bracing and supports for sample lines and equipment.
C.1.3.5
Heater (Shell Manway Mounted)

Inspect condensate drain for presence of oil indicating leakage.

C.1.3.6
Mixer
a
Inspect for proper mounting flange and support.
b
Inspect for leakage.
c
Inspect condition of power lines and connections to mixer.
C.1.3.7
Swing Lines: Winch Operation
a
Nonfloating. Raise, then lower the swing line with the winch, and check for cable tightness to confirm that swing line lowered properly.
b
Floating. With tank half full or more, lower the swing line, then let out cable and check if swing has pulled cable tight, indicating that the winch is operating properly.
c
Indicator. Check that the indicator moves in the proper direction: Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite.
C.1.3.8
Swing Lines: External Guide System

Check for leaks at threaded and flanged joints.

C.1.3.9
Swing Lines: Identify Ballast Varying Need

Check for significant difference in stock specific gravity.

C.1.3.10
Swing Lines: Cable Material and Condition
a
For nonstainless steel cable, check for corrosion over entire length.
b
All cable: check for wear or fraying.
C.1.3.11
Swing Lines: Product Sample Comparison

Check for water or gravity differences that would indicate a leaking swing joint.

C.1.3.12
Swing Lines: Target

Target should indicate direction of swing opening (up or down) and height above bottom where suction will be lost with swing on bottom support.

C.1.4
Roofs
C.1.4.1
Deck Plate Internal Corrosion

For safety, before accessing the roof, check with ultrasonic instrument or lightly use a ball peen hammer to test the deck plate near the edge of the roof for thinning. (Corrosion normally attacks the deck plate at the edge of a fixed roof and at the rafters in the center of the roof first.)

C.1.4.2
Deck Plate External Corrosion

Visually inspect for paint failure, holes, pitting, and corrosion product on the roof deck.

C.1.4.3
Roof Deck Drainage

Look for indication of standing water. (Significant sagging of fixed roof deck indicates potential rafter failure. Large standing water areas on a floating roof indicate inadequate drainage design or, if to one side, a nonlevel roof with possible leaking pontoons.)

Tank In-Service Inspection Checklist Continued

Item
Completed

X

C.1.4.4
Level of Floating Roof

At several locations, measure distance from roof rim to a horizontal weld seam above the roof. A variance in the readings indicates a nonlevel roof with possible shell out-of-round, out-of-plumb, leaking pontoons, or hang-up. On small diameter tanks, an unlevel condition can indicate unequal loading at that level.

C.1.4.5
Gas Test Internal Floating Roof

Test for explosive gas on top of the internal floating roof. Readings could indicate a leaking roof, leaking seal system, or inadequate ventilation of the area above the internal floating roof.

C.1.4.6
Roof Insulation
a
Visually inspect for cracks or leaks in the insulation weather coat where runoff rain water could penetrate the insulation.
b
Inspect for wet insulation under the weather coat.
c
Remove small test sections of insulation and check roof deck for corrosion and holes near the edge of the insulated area.
C.1.4.7
Floating Roof Seal Systems
a
Inspect the condition of the seal, measure and record maximum rim spaces and sealto- shell gaps around the full roof circumference at the level of inspection.

NOTE Inspection of the seal and measurement of the rim spaces and seal-to-shell gaps at more than one level may be necessary to more fully determine if any problems exist at other levels of tank operation).

b
Measure and record annular space at 30-ft spacing (minimum of four quadrants) around roof and record. Measurements should be taken in directly opposite pairs.
1)
_______ _______ Opposite pair 1.
2)
_______ _______ Opposite pair 2.
c
Check if seal fabric on primary shoe seals is pulling shoes away from shell (fabric not wide enough).
d
Inspect fabric for deterioration, holes, tears, and cracks.
e
Inspect visible metallic parts for corrosion and wear.
f
Inspect for openings in seals that would permit vapor emissions.
g
Inspect for protruding bolt or rivet heads against the shell.
h
Pull both primary and secondary seal systems back all around the shell to check their operation.
i
Inspect secondary seals for signs of buckling or indications that their angle with the shell is too shallow.
j
Inspect wedge-type wiper seals for flexibility, resilience, cracks, and tears.
C.1.5
Roof Appurtenances
C.1.5.1
Sample Hatch
a
Inspect condition and functioning of sample hatch cover.
b
On tanks governed by Air Quality Monitoring District rules, check for the condition of seal inside hatch cover.
c
Check for corrosion and plugging on thief and gauge hatch cover.
d
Where sample hatch is used to reel gauge stock level, check for marker and tab stating hold-off distance.
e
Check for reinforcing pad where sample hatch pipe penetrates the roof deck.

Tank In-Service Inspection Checklist Continued

Item
Completed

X

f
On floating roof sample hatch and recoil systems, inspect operation of recoil reel and condition of rope.
g
Test operation of system.
h
On ultra clean stocks such as JP4, check for presence and condition of protective coating or liner inside sample hatch (preventing rust from pipe getting into sample).
C.1.5.2
Gauge Well
a
Inspect visible portion of the gauge well for thinning, size of slots, and cover condition.
b
Check for a hold-off distance marker and tab with hold-off distance (legible).
c
On floating roofs, inspect condition of roof guide for gauge well, particularly the condition of the rollers for grooving.
d
If accessible, check the distance from the gauge well pipe to the tank shell at different levels.
e
If tank has a gauge well washer, check valve for leakage and for presence of a bull plug or blind flange.
C.1.5.3
Fixed Roof Scaffold Support

Inspect scaffold support for corrosion, wear, and structural soundness.

C.1.5.4
Autogauge: Inspection Hatch and Guides (Fixed Roof)
a
Check the hatch for corrosion and missing bolts.
b
Look for corrosion on the tape guide’s and float guide’s wire anchors.
C.1.5.5
Autogauge: Float Well Cover
a
Inspect for corrosion.
b
Check tape cable for wear or fraying caused by rubbing on the cover.
C.1.5.6
Sample Hatch (Internal Floating Roof)
a
Check overall conditions.
b
When equipped with a fabric seal, check for automatic sealing after sampling.
c
When equipped with a recoil reel opening device, check for proper operations.
C.1.5.7
Roof-mounted Vents (Internal Floating Roof)

Check condition of screens, locking and pivot pins.

C.1.5.8
Gauging Platform Drip Ring

On fixed roof tanks with drip rings under the gauging platform or sampling area, inspect for plugged drain return to the tank.

C.1.5.9
Emergency Roof Drains

Inspect vapor plugs for emergency drain: that seal fabric discs are slightly smaller than the pipe ID and that fabric seal is above the liquid level.

C.1.5.10
Removable Roof Leg Racks

Check for leg racks on roof.

C.1.5.11
Vacuum Breakers

Report size, number, and type of vacuum breakers. Inspect vacuum breakers. If high legs are set, check for setting of mechanical breaker in high leg position.

C.1.5.12
Rim Vents
a
Check condition of the screen on the rim vent cover.

Tank In-Service Inspection Checklist Continued

Item
Completed

X

b
Check for plating off or removal of rim vents where jurisdictional rules do not permit removal.
C.1.5.13
Pontoon Inspection Hatches
a
Open pontoon inspection hatch covers and visually check inside for pontoon leakage.
b
Test for explosive gas (an indicator of vapor space leaks).
c
If pontoon hatches are equipped with locked down coves, check for vent tubes. Check that vent tubes are not plugged up. Inspect lock-down devices for condition and operation.
C.1.6.1
Accessways

See Tank Out-of-service Inspection Checklist, Item C.2.12.

NOTES:

APPENDIX E: PHOTOGRAPHS

E.1: Tank XX North View E.2: Tank XX South View

E.3: Tank XX East View E.4: Tank XX West View

E.5: Picture Description E.6: Picture Description

E.7: Picture Description E.8: Picture Description

E.9: Picture Description E.10: Picture Description

E.11: Picture Description E.12: Picture Description

E.13: Picture Description E.14: Picture Description

E.15: Picture Description E.16: Picture Description image3.jpeg image4.jpeg image5.jpeg image1.png image2.jpeg image6.gif

File details come from the government source that posted it. Updated .