This document is a Contractor Work Breakdown Structure (CWBS) for the Near Earth Orbit Network (NEON) Sounder for Microwave-Based Applications (SMBA) project dated December 2024. The CWBS establishes a product-oriented framework for reporting program cost, schedule, and technical performance, providing a logical subdivision of project work across multiple levels.

The CWBS is structured into four hierarchical levels, with Level 1 representing the total contract effort, Level 2 defining major contract activities (including engineering, flight models, mission operations, and special tasks), Level 3 detailing specific work content like program management, systems engineering, mission assurance, and hardware/software development, and Level 4 allowing the contractor to define additional work breakdown details. Key work areas include program management, systems engineering, hardware/software development, integration and testing, ground support equipment design, launch and post-launch testing, and long-term mission support. The document was prepared by Tonya Eckert, NEON Deputy Project Manager/Resources, and approved by Roger Clason, NEON Series-1 Project Manager.

View the file

Other files

File Type Posted
Amnt 23 - MS Sections L and M.pdf PDF
Amnt 22 - Acquisition Strategy Update.pdf PDF
NS1-SMBA-SOW-0002C_01152026.pdf PDF
Technical QA topics for PRD.pdf PDF
Amendment 15 - Amendment 13 QA 1 and 2.pdf PDF
Amendment 13 - Industry Day.pdf PDF
Amnt13 - DRFP Cover Letter - 80GSFC25R7005 SMBA (Amendment 13).pdf PDF
Amnt13 - RFP - 80GSFC25R7005 SMBA (20250829).pdf PDF
Amnt13 - NS1-SMBA-SOW-0002B_NS1 SMBA SOW_08192025.pdf PDF
Amnt13 - Attachment B - Financial Management Reporting Requirements.pdf PDF
Amnt13 - Attachment G - Small Business Subcontracting Plan.pdf PDF
Amnt13 - Attachment I - Government Furnished Property.pdf PDF
Amnt13 - Attachment J - Reserved.pdf PDF
Amnt13 - Attachment K - TM Rate Matrices.pdf PDF
Amnt13 - SF33-22 - 80GSFC25R7005 SMBA.pdf PDF
Amnt13 - DRD 1 - OCI Plan.pdf PDF
Amnt13 - DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
Amnt13 - Attachment F - Safety and Health Plan.pdf PDF
Amnt13 - Attachment H - Requirements Statements List.pdf PDF
Amnt13 - NS1-SMBA-CDRL-0001B_NS1 SMBA CDRL_08192025.pdf PDF
Amnt13 - Enclosure 1 - Reserved.pdf PDF
Amnt13 - Attachment D - OCI Plan.pdf PDF
Amnt13 - Attachment L - Contractor Proposed Enhancements.pdf PDF
Amnt13 - Attachment N - Applicable Documents List.pdf PDF
Amnt13 - Attachment O - Down-Select Sections L and M.pdf PDF
Amnt13 - Attachment P.2-P.10 Payment Schedules (CLIN 0004-0012).pdf PDF
SMBA DFRP QA 1-4.pdf PDF
470-LEO-ANYS-00018 - Radiation Environment.pdf PDF
GPR-7120.4E.pdf PDF
Enclosure 1 - Performance Evaluation Plan.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
Enclosure 2 - Cost Exhibits 1-7.xlsx XLSX spreadsheet
SMBA Post-DRFP Industry Day Slides.pdf PDF
Post-DRFP Industry Day.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
NS1-SMBA-CDRL-0001A_NS1 SMBA CDRL_04102025.pdf PDF
Attachment A - NS1-SMBA-SOW-0002A_NS1 SMBA SOW_04172025.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
DRD 1 - OCI Plan.pdf PDF
Attachment K - Rates Matrices.pdf PDF
Attachment N - Applicable Documents List.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
NS1-SMBA-REQ-0001B_NS1 SMBA PRD_04172025.pdf PDF
DRD 3 - SCV Reporting.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
DRFP - 80GSFC25R7005 SMBA (20250418).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Near Earth Orbit Network (NEON)

Sounder for Microwave-Based Applications

(SMBA)

Contractor Work Breakdown Structure

(CWBS)

December 2024

Prepared by:

Tonya Eckert

NEON Deputy Project Manager/Resources

Approved by:

Roger Clason

NEON Series-1 Project Manager

Attachment J: Contractor Work Breakdown Structure (CWBS) and CWBS Dictionary

1. DESCRIPTION / PURPOSE

The CWBS establishes a product-oriented framework for reporting program cost, schedule, and technical performance and provides a basis for uniform planning, reporting status, program visibility, and assignment of responsibilities. Additionally, the CWBS provides a product-oriented logical subdivision of hardware, software, services, facilities, etc., that contribute to and/or make up the total project scope of effort and work. The CWBS dictionary provides a narrative description of the work tasks and effort to be performed in each CWBS element.

2. PREPARATION INFORMATION

Contents:

The CWBS and CWBS dictionary are two distinct project documents used for defining the approved project scope of work. The contents of each document are detailed in the following paragraphs:

CWBS – A logical, hierarchical display of the subdivision of all project work to be completed.

The CWBS shall include the approved element title and element number.

CWBS dictionary – The CWBS dictionary shall briefly describe and document the work content of every CWBS element and relevant efforts associated with each element (e.g., design, development, and manufacturing).

The CWBS levels shall be governed by the Following. The actual letter and number designations can be adapted to meet the needs of the Contractor’s systems

Level 1 - Total contract effort

Level 2 Definitions: Major contract activity as described below

A. Engineering Unit / Non-Recurring Activities – All effort to plan and manage the design of the instrument including detailed design activities, design reviews, risk reduction (engineering models, etc), software development, ground support equipment (GSE) development, verification planning, etc.

B. Flight Model (FM) -1 – All effort related to fabrication, assembly, test, launch operations and on-orbit testing of the satellite

C. FM-2

D. FM-3

E. FM-4

F. FM-5

G. FM-6

H. FM-7

I. FM-8

J. FM-9

K. FM-10

L. FM-11

M. FM-12

N. Special Tasks – all un-issued special task funds remain in this level 2 WBS O. Post-Observatory Commissioning On-Orbit Operations Tasks – all un-issued special task funds remain in this level 2 WBS P. Mission Operations - Long term mission support including any management, business management support, systems engineering etc that is not unique to a particular mission

Level 3 Definitions (Note: X denotes the Level 2 Contract Activity) – the work content as described is not necessarily all inclusive.

X.01 Program Management – Including program leadership, resource management, program planning (schedule), data management, configuration management, support for major design reviews

X.02 Systems Engineering - Including system engineering leadership, interface management (instrument, launch vehicle, ground), system specification definition and flow-down, verification planning, system level analysis and modeling

X.03 Mission Assurance - Including mission assurance leadership, quality engineering, subcontract surveillance, safety, reliability, parts and materials management

X.04 Hardware / Software – All subsystem hardware and software effort including parts and materials which should be accounted for in a separate line. Effort included in each level 2 WBS

X.05 Integration & Test - Including instrument baseline testing and environmental testing and post environment test activities including instrument packing and shipping.

X.06 GSE – design, fabrication, procurement assembly, test and maintenance of electrical, mechanical GSE and mission simulation and GSE software

X.07 Post Delivery Support (PDS) – Any support required after the Pre-Ship Review/Pre- Storage Review including satellite integration and testing and if needed storage costs or testing during storage prior to shipping to spacecraft vendor

X.08 Launch and Post Launch Testing– support for pre-launch planning, launch site support, support for mission unique or special launch services, launch-vehicle integration (spacecraft portion), and the first 6 months of post-launch testing prior to the handoff to NOAA.

X.09 Special Tasks – Actual and projected cost of special tasks issued for a specific level 2

WBS.

X.10 Post-Observatory Commissioning On-Orbit Operations Tasks – Actual and projected cost of tasks issued for a specific level 2 WBS.

X.11 Long Term Support – Long term mission support including any management, business management support, systems engineering etc. that is not unique to a particular mission

Level 4 – The Contractor shall define WBS level within each level 3 and provide a brief description of the work content.

Near Earth Orbit Network (NEON)
Attachment J: Contractor Work Breakdown Structure (CWBS) and CWBS Dictionary
2. PREPARATION INFORMATION Contents:
2025-01-03T16:46:19-0500
ROGER CLASON
2025-01-06T12:17:11-0500
Tonya Eckert

File details come from the government source that posted it. Updated .