Attachment N - Applicable Documents List.pdf

PDF 73 KB Posted

Attached to
Draft RFP - Near Earth Orbit Network Program's Sounder for Microwave-Based Applications
Solicitation number
DRFP-NEON-SMBA-2025
Issued by

About this file

Attachment N is a comprehensive list of applicable documents for the Draft Request for Proposal (DRFP) for the Near Earth Orbit Network (NEON) Program's Sounder for Microwave-Based Applications (SMBA) instrument development project. The document contains two tables of potential applicable documents, including NASA standards, military specifications, and internal NASA guidelines covering areas such as mission assurance, risk management, environmental verification, electromagnetic interference, cleanroom standards, payload safety, software engineering, and orbital debris limitation.

The document is explicitly noted as being for DRFP purposes only, with the intention of providing a complete list of potential applicable documents. The final contract will only include documents that are explicitly invoked by specific contract requirements. The applicable documents span technical standards from organizations like NASA, ISO, and military specifications, covering critical aspects of spacecraft and instrument development, including mission assurance, interface control, contamination control, radiation environment, and safety requirements for the NEON Series-1 Spacecraft and SMBA Instrument.

View the file

Other files

File Type Posted
Amnt 25 - Technical QA for PRD Rev E.pdf PDF
Amnt 24 - SMBA PRD Rev E.pdf PDF
Amnt 23 - MS Sections L and M.pdf PDF
Amnt 22 - Acquisition Strategy Update.pdf PDF
NS1-SMBA-CDRL-0001C_01152026.pdf PDF
Draft RFP Amendment 16 Industry Day v3 01052026.pdf PDF
Amendment 16 - Acq Strategy Change and DRFP QA.pdf PDF
Amnt13 - DRFP Cover Letter - 80GSFC25R7005 SMBA (Amendment 13).pdf PDF
Amnt13 - RFP - 80GSFC25R7005 SMBA (20250829).pdf PDF
Amnt13 - NS1-SMBA-SOW-0002B_NS1 SMBA SOW_08192025.pdf PDF
Amnt13 - Attachment B - Financial Management Reporting Requirements.pdf PDF
Amnt13 - Attachment G - Small Business Subcontracting Plan.pdf PDF
Amnt13 - Attachment I - Government Furnished Property.pdf PDF
Amnt13 - Attachment J - Reserved.pdf PDF
Amnt13 - Attachment K - TM Rate Matrices.pdf PDF
Amnt13 - SF33-22 - 80GSFC25R7005 SMBA.pdf PDF
Amnt13 - Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
Amnt13 - DRD 3 - SCV Reporting.pdf PDF
Amnt13 - Attachment E - C-SCRM Plan.pdf PDF
Amnt13 - Attachment M - Reserved.pdf PDF
Amnt13 - NS1-SMBA-REQ-0001C_NS1 SMBA PRD_08192025_revised.pdf PDF
Amnt13 - Attachment P.1 Payment Schedules (CLIN 0001).pdf PDF
Amnt13 - Enclosure 2 - Cost Exhibits 1-7.xlsx XLSX spreadsheet
Amnt13 - Enclosure 3 - Past Performance Questionnaire.pdf PDF
Amnt13 - Enclosure 4 - Financial Capability Disclosure.pdf PDF
Amnt13 - Attachment D - OCI Plan.pdf PDF
Amnt13 - Attachment L - Contractor Proposed Enhancements.pdf PDF
Amnt13 - Attachment N - Applicable Documents List.pdf PDF
Amnt13 - Attachment O - Down-Select Sections L and M.pdf PDF
Amnt13 - Attachment P.2-P.10 Payment Schedules (CLIN 0004-0012).pdf PDF
GPR-7120.4E.pdf PDF
Enclosure 1 - Performance Evaluation Plan.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
ATTACHMENT J - CWBS.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
Enclosure 2 - Cost Exhibits 1-7.xlsx XLSX spreadsheet
Attachment L - Contractor Proposed Enhancements.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment D - OCI Plan.pdf PDF
NS1-SMBA-CDRL-0001A_NS1 SMBA CDRL_04102025.pdf PDF
Attachment A - NS1-SMBA-SOW-0002A_NS1 SMBA SOW_04172025.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
NS1-SMA-REQ-0002B_NS1 SMBA IMAR_04092025.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
DRFP Cover Letter - 80GSFC25R7005 SMBA_41825.pdf PDF
NS1-SMBA-REQ-0001B_NS1 SMBA PRD_04172025.pdf PDF
DRD 3 - SCV Reporting.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
DRFP - 80GSFC25R7005 SMBA (20250418).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT N

APPLICABLE DOCUMENTS TABLE

December 20, 2024

RFP 80GSFC25R7005

CONTRACT TBD

Note: This document and table below are for DRFP purposes only. The intent is to provide a complete list of potential Applicable Documents. The final Applicable Documents list will only include documents explicitly invoked by a contract requirement.

SMBA Applicable Documents

Document No. Revision Document Name

NS1-SMBA-

CDRL-0001

- SMBA Contracts Data Requirements List (CDRL)

NS1-SMA-

REQ-0002

- SMBA Instruments Mission Assurance Requirements

(IMAR)

NS1-SMBA-

REQ-0001

- SMBA Performance Requirements Document (PRD)

TBS - Data Interface Requirement Document

TBS - SMBA Contamination Control Plan

TBS - SMBA FVTS Requirements Specification

TBS - SMBA FVTS Interface Requirements Control Document

TBS - Instrument Mission Assurance Compliance Matrix for the

Sounder for Microwave-Based Applications (SMBA)

GSFC-STD-

A Criteria for Flight and Flight Support Systems Lifecycle

Reviews

GPR7120.4 E Risk Management

GPR 8705.4A A Risk Classification Guidelines and Risk-Based SMA

Practices for GSFC Payloads and Systems

TBS - NEON Series-1 Spacecraft to SMBA Instrument Interface

Control Document

TBS - NEON Series-1 Spacecraft to SMBA Instrument Mechanical

Interface Control Document

470-LEO-

ANYS-00018

- Radiation Environment for the NEON Program

ISO 14644-1 May 1, 1999 Cleanrooms and Associated Control Environments

MIL-STD-

461C

C

August 4, Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference (EMI), Revision C (August 4, 1986)

MIL-STD-

461G

G

December

11, 2015

Requirements for the Control of Electromagnetic

Interference Characteristics of Subsystems and Equipment, Revision G (December 11, 2015)

MIL-STD-462 Rev -

Notice 2 from

May 1, 1970

Measurement of Electromagnetic Interference

Characteristics (Notice 2)

NASA-STD-

B w/ change

Structural Design and Test Factors of Safety for Spaceflight

Hardware

GSFC-STD-

B General Environmental Verification Standard (GEVS) for

GSFC Flight Programs and Projects

Section

2.5.2.1.1

Section

2.5.2.1.2

Section

2.5.2.2.3

NASA-STD-

8719.14

C NASA Process for Limiting Orbital Debris

NPR 8715.6 B NASA Procedural Requirements for Limiting Orbital Debris

NPR 8715.7 B Payload Safety Program

NPR 7150.2 D NASA Software Engineering Requirements

NASA-STD

8719.24

A NASA Payload Safety Requirements

NASA-STD

8719.24 Annex

B NASA Payload Safety Requirements: Requirements Table

KNPR 8715.3 C KSC Safety Procedural Requirements

File details come from the government source that posted it. Updated .