These slides document the Draft Request for Proposal (RFP) Industry Day for the Near Earth Orbit Network (NEON) Program's Sounder for Microwave-Based Applications (SMBA) Implementation Phase. The draft RFP seeks a Class C backbone microwave sounder with a base of 4 instruments and an option for 4 additional instruments, planned to include bands around Advanced Technology Microwave Sounder channels, plus F and J bands, with Radio Frequency Interference detection and hyperspectral capabilities.

The notional implementation timeline includes an RFI release on 4/17/24, draft RFP release on 4/18/25, draft RFP responses due on 5/9/25, RFP release in Q4 CY25, and contract award in Q4 CY26. The procurement approach emphasizes commercial acquisition of all architectural elements, including the instrument, spacecraft, launch vehicle, mission operations, and data acquisition/routing. NEON is soliciting industry feedback on potential changes, interface specifications, contract type preferences, and other implementation considerations, with redlines welcomed and encouraged.

View the file

Other files

File Type Posted
Amnt 25 - Technical QA for PRD Rev E.pdf PDF
Amnt 24 - SMBA PRD Rev E.pdf PDF
Amnt 23 - MS Sections L and M.pdf PDF
Amnt 22 - Acquisition Strategy Update.pdf PDF
NS1-SMBA-CDRL-0001C_01152026.pdf PDF
Draft RFP Amendment 16 Industry Day v3 01052026.pdf PDF
Amendment 16 - Acq Strategy Change and DRFP QA.pdf PDF
Amnt13 - DRFP Cover Letter - 80GSFC25R7005 SMBA (Amendment 13).pdf PDF
Amnt13 - RFP - 80GSFC25R7005 SMBA (20250829).pdf PDF
Amnt13 - NS1-SMBA-SOW-0002B_NS1 SMBA SOW_08192025.pdf PDF
Amnt13 - Attachment B - Financial Management Reporting Requirements.pdf PDF
Amnt13 - Attachment G - Small Business Subcontracting Plan.pdf PDF
Amnt13 - Attachment I - Government Furnished Property.pdf PDF
Amnt13 - Attachment J - Reserved.pdf PDF
Amnt13 - Attachment K - TM Rate Matrices.pdf PDF
Amnt13 - SF33-22 - 80GSFC25R7005 SMBA.pdf PDF
Amnt13 - Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
Amnt13 - DRD 3 - SCV Reporting.pdf PDF
Amnt13 - Attachment E - C-SCRM Plan.pdf PDF
Amnt13 - Attachment M - Reserved.pdf PDF
Amnt13 - NS1-SMBA-REQ-0001C_NS1 SMBA PRD_08192025_revised.pdf PDF
Amnt13 - Attachment P.1 Payment Schedules (CLIN 0001).pdf PDF
Amnt13 - Enclosure 2 - Cost Exhibits 1-7.xlsx XLSX spreadsheet
Amnt13 - Enclosure 3 - Past Performance Questionnaire.pdf PDF
Amnt13 - Enclosure 4 - Financial Capability Disclosure.pdf PDF
Amnt13 - DRD 1 - OCI Plan.pdf PDF
SMBA DFRP QA 1-4.pdf PDF
470-LEO-ANYS-00018 - Radiation Environment.pdf PDF
Enclosure 1 - Performance Evaluation Plan.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
ATTACHMENT J - CWBS.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
Post-DRFP Industry Day.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Attachment D - OCI Plan.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
NS1-SMBA-CDRL-0001A_NS1 SMBA CDRL_04102025.pdf PDF
Attachment A - NS1-SMBA-SOW-0002A_NS1 SMBA SOW_04172025.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
NS1-SMA-REQ-0002B_NS1 SMBA IMAR_04092025.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
DRFP Cover Letter - 80GSFC25R7005 SMBA_41825.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
DRD 1 - OCI Plan.pdf PDF
Attachment J - CWBS.pdf PDF
Attachment K - Rates Matrices.pdf PDF
Attachment N - Applicable Documents List.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMBA Implementation Phase Draft RFP Industry Day

April 25, 2025

Ground Rules

• The NEON team cannot have any technical discussions with Industry Partners outside of full group discussions and one on ones

• Information provided to one Industry Partner must be provided to all Industry Partners

– Questions will be posted anonymously

• The final chart deck from today will be posted on SAM.gov

Implementation Phase Draft RFP Overview Welcome

• We are using today to

– Elaborate on the thinking behind the documents that were released with the

SMBA Implementation Phase Draft Request for Proposal (RFP)

– Point towards areas of interest for feedback

– Answer questions Industry Partners might have

– Foster discussion on the SMBA instrument, selections, and contract

The SMBA Implementation Phase Statement of Work (SOW), Contract Data Requirements List (CDRL), Performance Requirements Document (PRD), Instrument Mission Assurance Requirements (IMAR), Evaluation Criteria, sample contract, and other information included in the Draft RFP are available on SAM.gov at the following link: https://sam.gov/opp/34f2e39ac9c0458aa90cb6e02ac2ef96/view Anything in the final SMBA Implementation Phase Request for Proposal (RFP) will supersede the information provided as part of this overview.

https://sam.gov/opp/34f2e39ac9c0458aa90cb6e02ac2ef96/view

Introductions

• Near Earth Orbit Network (NEON) Team

• Industry Partners

– BAE Systems

– Northrop Grumman

– L3Harris

– Raytheon

– Spire Global

– Teledyne Brown Engineering

– Weather Stream

Next Generation Backbone Microwave Sounder

• Backbone microwave sounder for the NEON program

• Class C

• Base of 4 instruments, option for an additional 4 instruments

• Planning to include:

– Bands around all Advanced Technology Microwave Sounder channels plus F band and J band

– Radio Frequency Interference detection and hyperspectral capabilities

– Intercalibration performance

• Completed user community white papers, Formulation Studies and Request For Information responses informed requirements

Draft RFP Information

• Four documents updated since the Request For Information (RFI)

– Statement of Work (SoW)

– Contract Data Requirements List (CDRL)

– Performance Requirements Document (PRD)

– Instrument Mission Assurance Requirements (IMAR)

• New documents for the draft Request For Proposal (RFP)

– Proposal Instructions

– Evaluation Criteria

– Sample Contract

• Responses due on May 9th

• One on ones welcome and can continue past May 9th up until the blackout period beginning at RFP release

Technical Highlights

• Changes in which bands require Radio Frequency Interference detection and hyperspectral capabilities (PRD Table 4.1-2)

• Specific heritage channels are now required (PRD Table 4.1-3)

– There is flexibility on what the additional channels are

• Noise Equivalent Delta Temperature (NEDT) is now scaled with bandwidth and integration time (Table 4.1-4)

• A Radio Frequency Interference detection section has been added to the PRD (Section 4.2)

• Pointing requirements have been added to the PRD (Table 5.4.2-1)

• Environmental requirements like Electro Magnetic Interference have been refined (PRD

Section 6)

• The ICD and MICD will be coordinated with the spacecraft Industry Partner

• The PRD has been renumbered and reorganized

– Prior requirement IDs may not align with these requirement IDs

Programmatic Highlights

• The Engineering Test Unit is required to be built, assembled, and functionally tested by CDR (SoW Section 4.3.1)

– Environmental testing is not required before CDR

• SMBA will implement Class C as a mixture of insight and oversight

– The NEON Team gains insight through partnership relationship with Industry

Partners Reliance on empowered Resident Office and Industry Partner relationships

– Fewer deliverables in the CDRL No “review” deliverables, mostly “information” deliverables, with targeted “approval” deliverables

– Fewer SoW requirements

– More decisional authority given to Industry Partner

Role of Industry in Series-1 and SMBA

• All architectural elements acquired commercially!

– Instrument

– Spacecraft

– Launch vehicle

– Mission operations

– Data Acquisition and Routing

• Intercalibration targets are best provided by the Government

– Enables Industry Partners

Commercial Mission Services

Industry Development

Requested Feedback

1. Which changes would you like to see? Which changes would add efficiency? Why?

2. Are there any items you would prefer remain unchanged? If so, what are they and why?

3. Specifically, how could a Class C approach be tailored to allow for greater use of your products and processes? Which requirements could be replaced with your products/processes?

4. How should interfaces be specified that allow for compatibility with as many spacecraft as possible? E.g., what if Ethernet is chosen as a data interface? Are requirements related to the thermal interface specified correctly? Etc. How would you specify these requirements?

5. How would a Fixed Price contract type change your proposal and implementation approach?

Please provide pros and cons for cost plus and fixed price contract types.

6. What else would you like us to know?

We sincerely welcome feedback and suggestions!

Redlines on everything are both welcomed and encouraged

Current Notional Implementation Phase Timeline

• RFI Release – 4/17/24

• RFI Response Due – 5/2/24

• Draft RFP Release – 4/18/25

• Draft RFP Responses Due – 5/9/25

• RFP Release – Q4 CY25

• Award – Q4 CY26

Questions?

SMBA Implementation Phase Draft RFP Industry Day
Ground Rules
Implementation Phase Draft RFP Overview Welcome
Introductions
Next Generation Backbone Microwave Sounder
Draft RFP Information
Technical Highlights
Programmatic Highlights
Role of Industry in Series-1 and SMBA
Requested Feedback
Current Notional Implementation Phase Timeline
Questions?