ATTACHMENT J-5 KEY PERSONNEL EXPERIENCE.pdf

PDF 62 KB Posted

Attached to
Peer Review Services for Performance Based Structural Design Federal contract opportunity
Solicitation number
697DCK-21-R-00044
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document includes an attachment for a federal solicitation seeking peer review services. The Federal Aviation Administration requires a Structural Peer Review Panel to verify the Engineer of Record's submittals for the replacement of the existing Airport Traffic Control Tower and Terminal Radar Approach Control facility at Ted Stevens International Airport in Anchorage, Alaska. Offerors must be registered in the System for Award Management database and submit proposals in accordance with the solicitation instructions by March 5, 2021 to be considered for award of this requirement. The peer review services are needed to verify the accuracy, completeness, and acceptability of structural designs for the airport infrastructure project.

View the file

Other files for this federal contract opportunity

Other files attached to Peer Review Services for Performance Based Structural Design, newest first.
File Type Posted
ATTACHMENT J-3 FINANICAL CAPABILITY Amendment 0001.pdf PDF
697DCK-21-R-00044 Amendment 0001.pdf PDF
697DCK-21-R-00044 Amend 0001.pdf PDF
ATTACHMENT J-2 INFORMATION ON OFFEROR_Amendment 0001.pdf PDF
ATTACHMENT J-5 KEY PERSONNEL EXPERIENCE_Amendment 0001.pdf PDF
697DCK-21-R-00044.pdf PDF
Questions and Responses_Feb 26 2021.pdf PDF
697DCK-21-R-00044.pdf PDF
697DCK-21-R-00044.pdf PDF
697DCK-21-R-00044.pdf PDF
697DCK-21-R-00044.pdf PDF
697DCK-21-R-00044.pdf PDF
Attachment J-1 STATEMENT OF WORK.pdf PDF
Attachment J-4 PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
ATTACHMENT J-3 FINANICAL CAPABILITY.pdf PDF
ATTACHMENT J-2 INFORMATION ON OFFEROR.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-5 KEY PERSONNEL EXPERIENCE

1. List a minimum of one (1), but no more than three (3) Relevant Facilities in the last 7 years from the date of the solicitation in the United States designed by the Designer of Record.

Names and references must be current and verifiable. (Copy for additional sheets)

Project Name/Location: _____________________________________________

POC Name and Telephone Number: _______________________________

Description of Work Performed: ___________________________

Project Delivery (Design-Build; Design-Bid-Build; etc.): ____________________________

Final Contract Cost: $______________________________

Original Contract Cost: $____________________________

Reason(s) for change in cost: _________________________

Percentage of Project Design Performed by A/E: ___________

Original Completion Date: ___________________________________________

Actual Date of Completion: ___________________________________________________

Reason(s) for time extension: __________________________________________________

Key Team Members critical to project success and is proposed for this FAA Project (if applicable):

Name/Title: ____________________________________________

Name/Title: _____________________________________________

2. List a minimum of one (1), but no more than three (3) projects of any type constructed by the Designer of Record in locations with similar site and environmental conditions in the last 7 years from date of this solicitation. Projects similar in size and scope to this FAA’s project preferred, including office facilities.

Names and references must be current and verifiable. (Copy for additional sheets)

Project Name/Location: _____________________________________________

POC Name and Telephone Number: _______________________________

Description of Work Performed: ___________________________

Project Delivery (Design-Build; Design-Bid-Build; etc.): ____________________________

Final Contract Cost: $______________________________

Original Contract Cost: $____________________________

Reason(s) for change in cost: _________________________

Percentage of Project Design Performed by A/E: ___________

Original Completion Date: ___________________________________________

Actual Date of Completion: ___________________________________________________

Reason(s) for time extension: __________________________________________________

Key Team Members critical to project success and is proposed for this FAA Project (if applicable):

Name/Title: ____________________________________________

Name/Title: _____________________________________________

3. List a minimum of one (1), but no more than three (3) Relevant Facilities designed by the Architect of Record in the last 7 years anywhere in the United States.

Names and references must be current and verifiable. (Copy for additional sheets)

Project Name/Location: _____________________________________________

POC Name and Telephone Number: _______________________________

Description of Work Performed: ___________________________

Project Delivery (Design-Build; Design-Bid-Build; etc.): ____________________________

Final Contract Cost: $______________________________

Original Contract Cost: $____________________________

Reason(s) for change in cost: _________________________

Percentage of Project Design Performed by A/E: ___________

Original Completion Date: ___________________________________________

Actual Date of Completion: ___________________________________________________

Reason(s) for time extension: __________________________________________________

Key Team Members critical to project success and is proposed for this FAA Project (if applicable):

4. List a minimum of one (1), but no more than three (3) projects of any type designed by the Structural Engineer of Record in locations with similar site and environmental conditions in the last 7 years from date of this solicitation. Projects similar in size and scope to this FAA’s project preferred, including office facilities.

Names and references must be current and verifiable. (Copy for additional sheets)

Project Name/Location: _____________________________________________

POC Name and Telephone Number: _______________________________

Description of Work Performed: ___________________________

Project Delivery (Design-Build; Design-Bid-Build; etc.): ____________________________

Final Contract Cost: $______________________________

Original Contract Cost: $____________________________

Reason(s) for change in cost: _________________________

Percentage of Project Design Performed by A/E: ___________

Original Scheduled Completion Date: ___________________________________________

Actual Date of Completion: ___________________________________________________

Reason(s) for time extension: __________________________________________________

Key Team Members critical to project success and is proposed for this FAA Project (if applicable):

Name/Title: ___________________________________________

5. List a minimum of one (1), but no more than three Projects as the Electrical Engineer of Record, designed in the United States, in the last 7 years from date of this solicitation.

Names and references must be current and verifiable. (Copy for additional sheets)

Project Name/Location: _____________________________________________

POC Name and Telephone Number: _______________________________

Description of Work Performed: ___________________________

Project Delivery (Design-Build; Design-Bid-Build; etc.): ____________________________

Final Contract Cost: $______________________________

Original Contract Cost: $____________________________

Reason(s) for change in cost: _________________________

Percentage of Project Design Performed by A/E: ___________

Original Completion Date: ___________________________________________

Actual Date of Completion: ___________________________________________________

Reason(s) for time extension: __________________________________________________

Key Team Members critical to project success and is proposed for this FAA Project (if applicable):

File details come from the government source that posted it. Updated .