Attachment J-3 Key Requirements Verification Matrix Rev B.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Navy Cable Ship Replacement T-ARC(X)
Solicitation number
N00024-20-R-2211R1
Issued by

About this file

This document contains an attachment to a Navy solicitation for proposals to replace the Navy's cable ships. The attachment provides a key requirements verification matrix listing technical and operational requirements for the new cable ships. Requirements include a minimum bollard pull of 120 metric tons, sustained speed of 15 knots, unrefueled range of 14,500 nautical miles at 15 knots, and accommodations. The matrix also outlines requirements for cable handling equipment capacity and capabilities, dynamic positioning systems, mission sonar systems, and more. Interested parties should respond to solicitation N00024-20-R-2211R1 with proposals by August 18, 2020. The solicitation is for Phase I of the Navy Cable Ship Replacement T-ARC program conducted by the Naval Sea Systems Command.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment J-3 Key Requirements Verification Matrix
Requirement NameRequirement DescriptionSpec SectionContractor VerificationVerification MethodRelated DI
Bollard pullAt least 120 MT3.070.3
Sustained Speed15 knots3.070.3
Unrefueled Range14,500 nm at 15 knots3.070.3
AccommodationsTotal number of accommodations3.070.3
Bubble SweepdownFlow streamlines requirement with respect to the MBSS-DW3.073.3
Ice ClassABS Baltic 1C3.070.12
Seakeeping - Cable OpsCable operations through SS53.079
Seakeeping - ROVROV LARS through SS53.079, 3.573.5.3
Seakeeping - Sea PlowSea Plow LARS through SS53.079, 3.573.5.4
Seakeeping - MoonpoolMoonpool UUV and Package LARS through SS3 and Package Heavy Lift through SS33.079, 3.573.5.5, 3.573.5.6
Diesel engine emissionsEmission requirements per regulatory bodies3.233
DP Capability - EnvironmentPosition keeping and trackline through SS53.420
DP Capability - RedundancyABS DPS-23.420
Mission Sonar SystemsMission sonar system transducer arrangements and sonar self-noise levels3.073.2 and 3.461
Cable PathwaysPathway to/from each cable tank to/from each of the three main CHE (two CDE and one LCE)3.595.1.1
Cable Tank CapacityMain cable tanks at least 3,200 m3 and 4,812 MT; Spare cable tanks at least 500 m3 and 688 MT3.595.2
CDE CapabilityCDE overboarding tension at least 50 MT; Hold two simultaneously up to 40 MT each3.595.5.1
LCE Capability25,000 lb tension3.595.5.2
Sea Plow Capability3m burial to 1,500 m depth up to 1.5 km/hr3.595.6
ROV Capability1m burial to 3,000 m depth up to 400 m/hr3.595.7
Moonpool SizeSized to accommodate payloads3.595.9

File details come from the government source that posted it. Updated .