Attachment J-2000000-13 ELINs.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
PM Program and Work Orders for the Pump Test Bench Systems at Bldg. YSK-A47 Federal contract opportunity
Solicitation number
N4008425B0412
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

The document is a Schedule of Price (Attachment J-2000000-13 ELINs.xlsx) for a federal contract opportunity to provide Preventive Maintenance (PM) Program and Work Orders for Pump Test Bench Systems at Building YSK-A47 for the U.S. Commander Fleet Activities Yokosuka (CFAY) in Japan. The contract includes a base period and four option periods, each lasting one year, with both recurring and non-recurring pricing components for maintenance and repair services.

The pricing structure covers multiple line items, including monthly and annual preventive maintenance work, emergency/urgent/routine work, and multipurpose repair services. Specific services include maintenance and repair for miscellaneous items, pump test bench systems, and unit-priced labor hour work. The contract allows for maintenance by multifunctional workers, official Japanese national qualification engineers, and Original Equipment Manufacturer (OEM) engineers. Direct material costs are included, with material cost limits ranging from 50,000 to 250,000 Japanese Yen per service. Bids must be submitted in Japanese Yen, and pricing requires mutual agreement between the government and contractor before task order issuance.

View the file

Other files for this federal contract opportunity

Other files attached to PM Program and Work Orders for the Pump Test Bench Systems at Bldg. YSK-A47, newest first.
File Type Posted
Solicitation Amendment N4008425B04120001 SF 30 released.pdf PDF
SOW_25B0412.pdf PDF
SF 1449 - N4008425B0412.pdf PDF
N4008425B0412_Attachment (3) PreBid Inquiry Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOP-Rw&Nrw

SCHEDULE OF PRICE
Date:#MM/DD/YYYY
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥
Provide PM Program and Work Orders for the
Pump Test Bench Systems at Bldg. YSK-A47
One year from the date of award.
Item 0002Non-Recurring, Base Period1LS¥
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the date of award.
Item 0003Recurring, First Option Period1LS¥
Provide PM Program and Work Orders for the
Pump Test Bench Systems at Bldg. YSK-A47
One year from the next date of the completion date of
the Base Period.
Item 0004Non-Recurring, First Option Period1LS¥
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the next date of the completion date of
the Base Period.
Item 0005Recurring, Second Option Period1LS¥
Provide PM Program and Work Orders for the
Pump Test Bench Systems at Bldg. YSK-A47
One year from the next date of the completion date of
the First Option Period.
Item 0006Non-Recurring, Second Option Period1LS¥
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the next date of the completion date of
the First Option Period.
Item 0007Recurring, Third Option Period1LS¥
Provide PM Program and Work Orders for the
Pump Test Bench Systems at Bldg. YSK-A47
One year from the next date of the completion date of
the Second Option Period.
Item 0008Non-Recurring, Third Option Period1LS¥
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the next date of the completion date of
the Second Option Period.
Item 0009Recurring, Fourth Option Period1LS¥
Provide PM Program and Work Orders for the
Pump Test Bench Systems at Bldg. YSK-A47
One year from the next date of the completion date of
the Third Option Period.
Item 0010Non-Recurring, Fourth Option Period1LS¥
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
One year from the next date of the completion date of
the Third Option Period.

TOTAL: (LINE ITEM 0001 through 0010) ¥

CLIN 9000 Exhibit A (Base Period)

CLIN 9001 Exhibit B (First Option Period)

CLIN 9002 Exhibit C (Second Option Period)

CLIN 9003 Exhibit D (Third Option Period)

CLIN 9004 Exhibit E (Fourth Option Period)

NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.

Detail line items for task order is located in Attachment J-0200000-13

CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY
If you will use below comments for GE, Print area should be chainge.
Note:GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement.

Provide Custodial Services, Grounds Maintenance and Landscaping Services and Pest Control Services for CFAY AOR area,

Provide Integrated Solid Waste Management Services for XXX Waste Collection & Disposal,
Provide Base Operations Support (BOS) Service
for New SANNO Hotel at Bldg. ####
Provide Preventive Maintenance Program and
Service Orders for XXX Systems at Bldg. ####

&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] B-&P

CUI // FEDCON [when filled in]

ELIN-ABCDE-Rw

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001Recurring Price - Base Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs A001
ELIN / Sub-ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotalCAC
A001SRF Spec Item 3
A001-115020003.1Emergency, Urgent, and Routine (E/U/R) Work12MO¥¥
A001-215020003.2PM Program, Spec Item
A001-2-1a15020003.2.1Pump Test Bench Systems, Monthly PM Work12MO¥¥
A001-2-1b15020003.2.1Pump Test Bench Systems, Annual PM Work, in Novermber1LO¥¥

TOTAL RECURRING PRICE LINE ITEM-0001 ¥

MO =Months
EA =Each
LO =Lot
Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0003Recurring Price - First Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs B001
ELIN / Sub-ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotalCAC
B001SRF Spec Item 3
B001-115020003.1Emergency, Urgent, and Routine (E/U/R) Work12MO¥¥
B001-215020003.2PM Program, Spec Item
B001-2-1a15020003.2.1Pump Test Bench Systems, Monthly PM Work12MO¥¥
B001-2-1b15020003.2.1Pump Test Bench Systems, Annual PM Work, in Novermber1LO¥¥

TOTAL RECURRING PRICE LINE ITEM-0003 ¥

MO =Months
EA =Each
LO =Lot
Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0005Recurring Price - Second Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs C001
ELIN / Sub-ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotalCAC
C001SRF Spec Item 3
C001-115020003.1Emergency, Urgent, and Routine (E/U/R) Work12MO¥¥
C001-215020003.2PM Program, Spec Item
C001-2-1a15020003.2.1Pump Test Bench Systems, Monthly PM Work12MO¥¥
C001-2-1b15020003.2.1Pump Test Bench Systems, Annual PM Work, in Novermber1LO¥¥

TOTAL RECURRING PRICE LINE ITEM-0005 ¥

MO =Months
EA =Each
LO =Lot
Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT D - CLIN 9003
Line Item 0007Recurring Price - Third Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs D001
ELIN / Sub-ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotalCAC
D001SRF Spec Item 3
D001-115020003.1Emergency, Urgent, and Routine (E/U/R) Work12MO¥¥
D001-215020003.2PM Program, Spec Item
D001-2-1a15020003.2.1Pump Test Bench Systems, Monthly PM Work12MO¥¥
D001-2-1b15020003.2.1Pump Test Bench Systems, Annual PM Work, in Novermber1LO¥¥

TOTAL RECURRING PRICE LINE ITEM-0007 ¥

MO =Months
EA =Each
LO =Lot
Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT E - CLIN 9004
Line Item 0009Recurring Price - Fourth Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs E001
ELIN / Sub-ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of IssueUnit PriceTotalCAC
E001SRF Spec Item 3
E001-115020003.1Emergency, Urgent, and Routine (E/U/R) Work12MO¥¥
E001-215020003.2PM Program, Spec Item¥
E001-2-1a15020003.2.1Pump Test Bench Systems, Monthly PM Work12MO¥¥
E001-2-1b15020003.2.1Pump Test Bench Systems, Annual PM Work, in Novermber1LO¥¥

TOTAL RECURRING PRICE LINE ITEM-0009 ¥

MO =Months
EA =Each
LO =Lot

&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] &K00+000Page &P of &N&K000000

CUI // FEDCON [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELIN-A-Nrw

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002Non-Recurring Price - Base Period
Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs A700 through A701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Replacement and Repair Services for the Pump Test Bench Systems
A700AAMaintenance/repair and replacement services for miscellaneous workThe Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order.20EA¥¥
A700ABMaintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM EngineerThe Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order.6EA¥¥
A701Multipurpose Repair Services for the Pump Test Bench Systems
A701AAUnit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.480HR¥¥
A701ABTransportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.320HR¥¥
A701ACDirect Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order. 1 LS ¥ 50,000,000 ¥

TOTAL NON-RECUURRING PRICE ITEM-0002¥
HR =Hour
LS =Lump Sum
EA =EachUnder line Unit Price Shall Not Change,

CUI // FEDCON [when filled in]

ELIN-B-Nrw

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0004Non-Recurring Price - First Option Period
Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs B700 through B701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Replacement and Repair Services for the Pump Test Bench Systems
B700AAMaintenance/repair and replacement services for miscellaneous workThe Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order.20EA¥¥
B700ABMaintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM EngineerThe Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order.2EA¥¥
B701Multipurpose Repair Services for the Pump Test Bench Systems
B701AAUnit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.120HR¥¥
B701ABTransportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.80HR¥¥
B701ACDirect Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥

TOTAL NON-RECUURRING PRICE ITEM-0004¥
HR =Hour
LS =Lump Sum
EA =EachUnder line Unit Price Shall Not Change,

CUI // FEDCON [when filled in]

ELIN-C-Nrw

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0006Non-Recurring Price - Second Option Period
Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs C700 through C701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C700Replacement and Repair Services for the Pump Test Bench Systems
C700AAMaintenance/repair and replacement services for miscellaneous workThe Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order.20EA¥¥
C700ABMaintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM EngineerThe Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order.2EA¥¥
C701Multipurpose Repair Services for the Pump Test Bench Systems
C701AAUnit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.120HR¥¥
C701ABTransportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.80HR¥¥
C701ACDirect Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥

TOTAL NON-RECUURRING PRICE ITEM-0006¥
HR =Hour
LS =Lump Sum
EA =EachUnder line Unit Price Shall Not Change,

CUI // FEDCON [when filled in]

ELIN-D-Nrw

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT D - CLIN 9003
Line Item 0008Non-Recurring Price - Third Option Period
Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs D700 through D701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
D700Replacement and Repair Services for the Pump Test Bench Systems
D700AAMaintenance/repair and replacement services for miscellaneous workThe Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order.20EA¥¥
D700ABMaintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM EngineerThe Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order.2EA¥¥
D701Multipurpose Repair Services for the Pump Test Bench Systems
D701AAUnit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.120HR¥¥
D701ABTransportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.80HR¥¥
D701ACDirect Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥

TOTAL NON-RECUURRING PRICE ITEM-0008¥
HR =Hour
LS =Lump Sum
EA =EachUnder line Unit Price Shall Not Change,

CUI // FEDCON [when filled in]

ELIN-E-Nrw

Attachment J-0200000-13
Exhibit Line Item Numbers (ELINS)
SOLICITATION/CONTRACT #
EXHIBIT E - CLIN 9004
Line Item 0010Non-Recurring Price - Fourth Option Period
Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4
ELINs E700 through E701
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
E700Replacement and Repair Services for the Pump Test Bench Systems
E700AAMaintenance/repair and replacement services for miscellaneous workThe Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order.20EA¥¥
E700ABMaintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM EngineerThe Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order.2EA¥¥
E701Multipurpose Repair Services for the Pump Test Bench Systems
E701AAUnit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.120HR¥¥
E701ABTransportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.80HR¥¥
E701ACDirect Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥

TOTAL NON-RECUURRING PRICE ITEM-0010¥
HR =Hour
LS =Lump Sum
EA =EachUnder line Unit Price Shall Not Change,

CUI // FEDCON [when filled in]

NAVFAC UOMs

ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRHoursSBSquare Mile
CACartridgeHSHundred Square FeetSCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
CFCubic FootKGKilogramSISquare Inch
CGCentigramKMKilometerSKSkein
CICubic InchKRCaratSLSpool
CKCakeKTKitSMSquare Meter
CLCoilLBPoundSOShot
CMCentimeterLFLinear FootSPStrip
CNCanLGLengthSQSquare
COContainerLHLabor HoursSXStick
CUCurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUSUS U.S.P Unit
EAEachMRMeterVIVial
ENEach CollectionMXThousandWKWeek
EXExposureOTOutfitYDYard
FDFoldOZOunceYRYears

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .