Attachment J-2000000-13 ELINs.xlsx
XLSX spreadsheet 56 KB Posted
- Attached to
- PM Program and Work Orders for the Pump Test Bench Systems at Bldg. YSK-A47 Federal contract opportunity
- Solicitation number
- N4008425B0412
About this file
The document is a Schedule of Price (Attachment J-2000000-13 ELINs.xlsx) for a federal contract opportunity to provide Preventive Maintenance (PM) Program and Work Orders for Pump Test Bench Systems at Building YSK-A47 for the U.S. Commander Fleet Activities Yokosuka (CFAY) in Japan. The contract includes a base period and four option periods, each lasting one year, with both recurring and non-recurring pricing components for maintenance and repair services.
The pricing structure covers multiple line items, including monthly and annual preventive maintenance work, emergency/urgent/routine work, and multipurpose repair services. Specific services include maintenance and repair for miscellaneous items, pump test bench systems, and unit-priced labor hour work. The contract allows for maintenance by multifunctional workers, official Japanese national qualification engineers, and Original Equipment Manufacturer (OEM) engineers. Direct material costs are included, with material cost limits ranging from 50,000 to 250,000 Japanese Yen per service. Bids must be submitted in Japanese Yen, and pricing requires mutual agreement between the government and contractor before task order issuance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N4008425B04120001 SF 30 released.pdf | ||
| SOW_25B0412.pdf | ||
| SF 1449 - N4008425B0412.pdf | ||
| N4008425B0412_Attachment (3) PreBid Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOP-Rw&Nrw
| SCHEDULE OF PRICE | ||||
| Date: | #MM/DD/YYYY | |||
| NAME OF OFFEROR OR CONTRACTOR: | ||||
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. |
| Item 0001 | Recurring, Base Period | 1 | LS | ¥ |
| Provide PM Program and Work Orders for the | ||||
| Pump Test Bench Systems at Bldg. YSK-A47 | ||||
| One year from the date of award. |
| Item 0002 | Non-Recurring, Base Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the date of award. |
| Item 0003 | Recurring, First Option Period | 1 | LS | ¥ |
| Provide PM Program and Work Orders for the | ||||
| Pump Test Bench Systems at Bldg. YSK-A47 | ||||
| One year from the next date of the completion date of | ||||
| the Base Period. |
| Item 0004 | Non-Recurring, First Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the next date of the completion date of | ||||
| the Base Period. |
| Item 0005 | Recurring, Second Option Period | 1 | LS | ¥ |
| Provide PM Program and Work Orders for the | ||||
| Pump Test Bench Systems at Bldg. YSK-A47 | ||||
| One year from the next date of the completion date of | ||||
| the First Option Period. |
| Item 0006 | Non-Recurring, Second Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the next date of the completion date of | ||||
| the First Option Period. |
| Item 0007 | Recurring, Third Option Period | 1 | LS | ¥ |
| Provide PM Program and Work Orders for the | ||||
| Pump Test Bench Systems at Bldg. YSK-A47 | ||||
| One year from the next date of the completion date of | ||||
| the Second Option Period. |
| Item 0008 | Non-Recurring, Third Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the next date of the completion date of | ||||
| the Second Option Period. |
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide PM Program and Work Orders for the | ||||
| Pump Test Bench Systems at Bldg. YSK-A47 | ||||
| One year from the next date of the completion date of | ||||
| the Third Option Period. |
| Item 0010 | Non-Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| upon receipt of a Task Order | ||||
| One year from the next date of the completion date of | ||||
| the Third Option Period. |
TOTAL: (LINE ITEM 0001 through 0010) ¥
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
| NOTE: | The number of Placeholders established depends on the maximum number of lines |
| of accounting anticipated on an individual task order. |
Detail line items for task order is located in Attachment J-0200000-13
| CLIN = CONTRACT LINE ITEM |
| LS = LUMP SUM |
| NTE = NOT-TO-EXCEED |
| Q'TY = QUANTITY |
| If you will use below comments for GE, Print area should be chainge. | |
| Note: | GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement. |
Provide Custodial Services, Grounds Maintenance and Landscaping Services and Pest Control Services for CFAY AOR area,
| Provide Integrated Solid Waste Management Services for XXX Waste Collection & Disposal, |
| Provide Base Operations Support (BOS) Service |
| for New SANNO Hotel at Bldg. #### |
| Provide Preventive Maintenance Program and |
| Service Orders for XXX Systems at Bldg. #### |
&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] B-&P
CUI // FEDCON [when filled in]
ELIN-ABCDE-Rw
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 | Recurring Price - Base Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 | |
| ELINs A001 |
| ELIN / Sub-ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| A001 | SRF Spec Item 3 | |||||||
| A001-1 | 1502000 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | 12 | MO | ¥ | ¥ | |
| A001-2 | 1502000 | 3.2 | PM Program, Spec Item | |||||
| A001-2-1a | 1502000 | 3.2.1 | Pump Test Bench Systems, Monthly PM Work | 12 | MO | ¥ | ¥ | |
| A001-2-1b | 1502000 | 3.2.1 | Pump Test Bench Systems, Annual PM Work, in Novermber | 1 | LO | ¥ | ¥ |
TOTAL RECURRING PRICE LINE ITEM-0001 ¥
| MO = | Months |
| EA = | Each |
| LO = | Lot |
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 | Recurring Price - First Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 | |
| ELINs B001 |
| ELIN / Sub-ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| B001 | SRF Spec Item 3 | |||||||
| B001-1 | 1502000 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | 12 | MO | ¥ | ¥ | |
| B001-2 | 1502000 | 3.2 | PM Program, Spec Item | |||||
| B001-2-1a | 1502000 | 3.2.1 | Pump Test Bench Systems, Monthly PM Work | 12 | MO | ¥ | ¥ | |
| B001-2-1b | 1502000 | 3.2.1 | Pump Test Bench Systems, Annual PM Work, in Novermber | 1 | LO | ¥ | ¥ |
TOTAL RECURRING PRICE LINE ITEM-0003 ¥
| MO = | Months |
| EA = | Each |
| LO = | Lot |
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 9002 |
| Line Item 0005 | Recurring Price - Second Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 | |
| ELINs C001 |
| ELIN / Sub-ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| C001 | SRF Spec Item 3 | |||||||
| C001-1 | 1502000 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | 12 | MO | ¥ | ¥ | |
| C001-2 | 1502000 | 3.2 | PM Program, Spec Item | |||||
| C001-2-1a | 1502000 | 3.2.1 | Pump Test Bench Systems, Monthly PM Work | 12 | MO | ¥ | ¥ | |
| C001-2-1b | 1502000 | 3.2.1 | Pump Test Bench Systems, Annual PM Work, in Novermber | 1 | LO | ¥ | ¥ |
TOTAL RECURRING PRICE LINE ITEM-0005 ¥
| MO = | Months |
| EA = | Each |
| LO = | Lot |
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 9003 |
| Line Item 0007 | Recurring Price - Third Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 | |
| ELINs D001 |
| ELIN / Sub-ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| D001 | SRF Spec Item 3 | |||||||
| D001-1 | 1502000 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | 12 | MO | ¥ | ¥ | |
| D001-2 | 1502000 | 3.2 | PM Program, Spec Item | |||||
| D001-2-1a | 1502000 | 3.2.1 | Pump Test Bench Systems, Monthly PM Work | 12 | MO | ¥ | ¥ | |
| D001-2-1b | 1502000 | 3.2.1 | Pump Test Bench Systems, Annual PM Work, in Novermber | 1 | LO | ¥ | ¥ |
TOTAL RECURRING PRICE LINE ITEM-0007 ¥
| MO = | Months |
| EA = | Each |
| LO = | Lot |
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 9004 |
| Line Item 0009 | Recurring Price - Fourth Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 | |
| ELINs E001 |
| ELIN / Sub-ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| E001 | SRF Spec Item 3 | |||||||
| E001-1 | 1502000 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | 12 | MO | ¥ | ¥ | |
| E001-2 | 1502000 | 3.2 | PM Program, Spec Item | ¥ | ||||
| E001-2-1a | 1502000 | 3.2.1 | Pump Test Bench Systems, Monthly PM Work | 12 | MO | ¥ | ¥ | |
| E001-2-1b | 1502000 | 3.2.1 | Pump Test Bench Systems, Annual PM Work, in Novermber | 1 | LO | ¥ | ¥ |
TOTAL RECURRING PRICE LINE ITEM-0009 ¥
| MO = | Months |
| EA = | Each |
| LO = | Lot |
&"Times New Roman,Regular"&K000000CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]&U
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] &K00+000Page &P of &N&K000000
CUI // FEDCON [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELIN-A-Nrw
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 | Non-Recurring Price - Base Period |
| Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4 | |
| ELINs A700 through A701 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Replacement and Repair Services for the Pump Test Bench Systems | ||||||
| A700AA | Maintenance/repair and replacement services for miscellaneous work | The Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order. | 20 | EA | ¥ | ¥ | |
| A700AB | Maintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM Engineer | The Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order. | 6 | EA | ¥ | ¥ | |
| A701 | Multipurpose Repair Services for the Pump Test Bench Systems | ||||||
| A701AA | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 480 | HR | ¥ | ¥ |
| A701AB | Transportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 320 | HR | ¥ | ¥ |
| A701AC | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order. 1 LS ¥ 50,000,000 ¥
| TOTAL NON-RECUURRING PRICE ITEM-0002 | ¥ | |||
| HR = | Hour | |||
| LS = | Lump Sum | |||
| EA = | Each | Under line Unit Price Shall Not Change, |
CUI // FEDCON [when filled in]
ELIN-B-Nrw
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 | Non-Recurring Price - First Option Period |
| Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4 | |
| ELINs B700 through B701 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Replacement and Repair Services for the Pump Test Bench Systems | ||||||
| B700AA | Maintenance/repair and replacement services for miscellaneous work | The Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order. | 20 | EA | ¥ | ¥ | |
| B700AB | Maintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM Engineer | The Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order. | 2 | EA | ¥ | ¥ | |
| B701 | Multipurpose Repair Services for the Pump Test Bench Systems | ||||||
| B701AA | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 120 | HR | ¥ | ¥ |
| B701AB | Transportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 80 | HR | ¥ | ¥ |
| B701AC | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥
| TOTAL NON-RECUURRING PRICE ITEM-0004 | ¥ | |||
| HR = | Hour | |||
| LS = | Lump Sum | |||
| EA = | Each | Under line Unit Price Shall Not Change, |
CUI // FEDCON [when filled in]
ELIN-C-Nrw
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 9002 |
| Line Item 0006 | Non-Recurring Price - Second Option Period |
| Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4 | |
| ELINs C700 through C701 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| C700 | Replacement and Repair Services for the Pump Test Bench Systems | ||||||
| C700AA | Maintenance/repair and replacement services for miscellaneous work | The Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order. | 20 | EA | ¥ | ¥ | |
| C700AB | Maintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM Engineer | The Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order. | 2 | EA | ¥ | ¥ | |
| C701 | Multipurpose Repair Services for the Pump Test Bench Systems | ||||||
| C701AA | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 120 | HR | ¥ | ¥ |
| C701AB | Transportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 80 | HR | ¥ | ¥ |
| C701AC | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥
| TOTAL NON-RECUURRING PRICE ITEM-0006 | ¥ | |||
| HR = | Hour | |||
| LS = | Lump Sum | |||
| EA = | Each | Under line Unit Price Shall Not Change, |
CUI // FEDCON [when filled in]
ELIN-D-Nrw
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 9003 |
| Line Item 0008 | Non-Recurring Price - Third Option Period |
| Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4 | |
| ELINs D700 through D701 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| D700 | Replacement and Repair Services for the Pump Test Bench Systems | ||||||
| D700AA | Maintenance/repair and replacement services for miscellaneous work | The Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order. | 20 | EA | ¥ | ¥ | |
| D700AB | Maintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM Engineer | The Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order. | 2 | EA | ¥ | ¥ | |
| D701 | Multipurpose Repair Services for the Pump Test Bench Systems | ||||||
| D701AA | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 120 | HR | ¥ | ¥ |
| D701AB | Transportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 80 | HR | ¥ | ¥ |
| D701AC | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥
| TOTAL NON-RECUURRING PRICE ITEM-0008 | ¥ | |||
| HR = | Hour | |||
| LS = | Lump Sum | |||
| EA = | Each | Under line Unit Price Shall Not Change, |
CUI // FEDCON [when filled in]
ELIN-E-Nrw
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 9004 |
| Line Item 0010 | Non-Recurring Price - Fourth Option Period |
| Provide Prices For Facility Investment Services- Non-Recurring - In Accordance With Section C, Spec Item 4 | |
| ELINs E700 through E701 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| E700 | Replacement and Repair Services for the Pump Test Bench Systems | ||||||
| E700AA | Maintenance/repair and replacement services for miscellaneous work | The Contractor shall provide maintenance/repair and replacement service for miscellaneous items which includes structural/interior finish, electrical and mechanical equipment and fixtures designated by the SRF POC. Service includes 16 hours of labor (typical multifunctional worker) and direct material costs up to 50000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before to issuance of the task order. | 20 | EA | ¥ | ¥ | |
| E700AB | Maintenance/repair and replacement services for Related Pump Test Bench Systems by Official National Qualification Engineer or OEM Engineer | The Contractor shall provide maintenance/repair and replacement service for Related Pump Test Bench Systems which includes structural, electrical and mechanical equipment designated by the SRF POC. Service includes 32 hours of labor (official Japanese national qualification engineer or OEM engineer) and direct material costs up to 250000 JPY including shipping. The price shall meet with OEM standards or the common web market. Shall have a mutual agreement between Gov't and the contractor before issuance of the task order. | 2 | EA | ¥ | ¥ | |
| E701 | Multipurpose Repair Services for the Pump Test Bench Systems | ||||||
| E701AA | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 120 | HR | ¥ | ¥ |
| E701AB | Transportation Unit Priced Flat Rate Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 80 | HR | ¥ | ¥ |
| E701AC | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order. 1 LS ¥ 5,000,000 ¥
| TOTAL NON-RECUURRING PRICE ITEM-0010 | ¥ | |||
| HR = | Hour | |||
| LS = | Lump Sum | |||
| EA = | Each | Under line Unit Price Shall Not Change, |
CUI // FEDCON [when filled in]
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .