Attachment J-2 Seed Project.pdf
PDF 365 KB Posted
- Attached to
- MOBILE ASSET SUSTAINMENT PROGRAM (MASP) Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00233
About this file
This document includes an attachment and federal contract opportunity notice. The attachment provides details for a seed project task order to perform repairs and renovations on several mobile air traffic control towers and camper vehicles. Work includes console reconfigurations, equipment rack removals and installations, and preparations for deploying campers including sanitization, maintenance and repair of various systems. The related federal contract opportunity is a solicitation from the Federal Aviation Administration for a non-personal services contract to provide infrastructure maintenance support of mobile assets. Interested vendors must submit proposals by June 8, 2022 for consideration under this small business set-aside contract. The requirement is covered by the Service Contract Act.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J-1 Statement of Work_MASP.pdf | ||
| 697DCK-22-R-00233 Amendment 0001.pdf | ||
| 697DCK-22-R-00233.pdf | ||
| Attachment J-2 Seed Project.pdf | ||
| 697DCK-22-R-00233.pdf | ||
| PAST PERFORMANCE QUESTIONNAIRE_697DCK-22-R-00233.pdf | ||
| Attachment J-4 2015-5101 SCA.pdf | ||
| Attachment J-3 Seed Project Price Proposal.xlsx | XLSX spreadsheet | |
| 697DCK-22-R-00233.pdf | ||
| Attachment J-1 Statement of Work_MASP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-2 Seed Project
The repairs and renovations for the mobile assets listed below will take place a Government site in Independence, MO. A task order for the Seed Project will be issued immediately after award of the base contract.
Tasks:
1. Q81 Medium ATCT – Reconfigure the console after removal of the TVS
2. Q83 Medium ATCT – Reconfigure the console after removal of the TVS
3. Q28, Q29, Q31, Q32, Q35*Camper Refurb – Sanitize camper, inspect mattresses and linens in sleeper campers clean bed lining and store in sealed bag, replace bedding/mattress as needed, prep for deployment.
• Test and repair heat and air conditioning systems.
• Test road and interior lighting and repair as needed
• Test Braking and break away systems
• Ensure the propane is available and equipment using it is operational
• Check tire pressure and lug nut torque are within specifications.
• Check roof for leaks, cracks, caulk cracks, etc and repair as needed.
• Q35* thorough checkout for roadworthiness and condition assessment.
Pictures below are for reference for the above objectives:
Bearings, tires and brakes should be on similar types shown;
Attachment J-2 Seed Project
Console reconfiguration will be accomplished on this or a similar console. The squares on the extreme left and right will be removed leaving a hole in the laminated wood console which will need to be filled or the laminated console replaced (if matched only the portion shown).
Equipment racks in the assets (that are bolted to the floor), once emptied of equipment and wiring need to be removed. Also empty racks may need to be installed in places for equipment to be added. Qualified technicians would then install equipment in those added racks.