ATTACHMENT_J_1_Work_Spec_MSCOK 26-010_N6264926RK011.docx
DOCX document 69 KB Posted
- Solicitation number
- N6264926RK011
About this file
This is a Work Specification document for corrective maintenance engineering work on the USNS SACAGAWEA (T-AKE 2) during a Voyage Repair Availability (VRA) at Chinhae, South Korea. The specification, designated MSCOK 26-010 with an effective date of August 1, 2026, outlines a comprehensive scope of maintenance and repair work organized into ten major sections: General Services and Requirements, Hull and Structural, Propulsion Machinery, Electrical, Communication and Navigation, Auxiliary Machinery, Habitability Outfitting and Furnishings, HVAC, and Underway Replenishment Equipment.
The work specification details approximately 80+ individual work items spanning structural repairs (messenger reels, handrails, topside preservation, tank inspections), propulsion system maintenance (lube oil pump overhaul), electrical work (ECDIS modifications, bilge alarms, generator maintenance, UPS battery replacement), navigation and communication system maintenance (EPIC announcement system, antenna maintenance, echo sounder service), auxiliary machinery repairs (MDG vent piping, steering gear testing, winch repairs, anchor windlass overhaul), habitability improvements (tile deck renewals, joiner door repairs, lagging), HVAC system work (ventilator repairs, air conditioning seals, AHU heater replacement), and underway replenishment equipment refurbishment (hauling winch repairs, spanwire motor repair, highline equipment maintenance). All items are categorized as either NSP (Non-Standard Product) or A-type work, with various preventative maintenance cycles noted (2.5-year, 3-year, 5-year, and 10-year intervals) to support continued fleet readiness and regulatory compliance.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Print Date:
04/09/2026
MSC Corrective Maintenance
Engineering Report
USNS SACAGAWEA
(TAKE 2)
MSCOK 26-010
2026-08-01 - VRA
WORK ITEM INDEX REPORT
| Item Number |
| Title |
| Category |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| GENERAL REQUIREMENTS AND DEFINITIONS |
| NSP |
| 0002 |
| UTILITIES AND GENERAL SERVICES FOR SHIP AND PORT |
| A |
| 0004 |
| TESTING AND QUALITY ASSURANCE |
| NSP |
| 0005 |
| HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE |
| NSP |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0101 |
| MESSENGER REELS (VR25-0088) |
| A |
| 0102 |
| HANDRAIL REPLACEMENT |
| A |
| 0103 |
| TOPSIDE PRESERVATION (VR26-0006) |
| A |
| 0104 |
| CLEANING LOCKER PRESERVATION (VR25-0089) |
| A |
| 0105 |
| PLENUM REPAIRS (VR25-0014) |
| A |
| 0106 |
| ROLLER CURTAIN CARGO DOOR REPAIRS (VR25-0063-0073) |
| A |
| 0107 |
| HVAC ROOM DECK PRESERVATION (VR25-0091) |
| A |
| 0108 |
| ABS MISCELLANEOUS HITS |
| A |
| 0110 |
| TANK VENTS (VR25-0090) |
| A |
| 0111 |
| TAKE-CSI-BALLAST TANK ZINC INSPECTION (2.5 YR) |
| A |
| 0112 |
| TAKE-CSI-FOOD WASTE TANK INSPECTION (2.5 YR) |
| A |
| 0113 |
| CLIMBER SAFETY RAILS (VR25-0023) |
| A |
| 0114 |
| GANGWAY FALL ARREST ANCHOR POINTS (VR19-0024) |
| A |
| 0152 |
| T-AKE Ultrasonic Thickness Gauging (Ballast Piping) |
| A |
| 0156 |
| TAKE-CCSI-FLIGHT DECK PRESERVATION (3 YR) |
| A |
| 0163 |
| TAKE-CCSI-FLIGHT DECK SAFETY NET INSPECTION AND |
| A |
| 0173A |
| TAKE-CCSI-POINT AND PRESERVE 2K SQFT TOPSIDE (1YR) |
| A |
| SECTION 0200 |
| PROPULSION MACHINERY |
| 0201 |
| LUBE OIL PRIMING PUMP OVERHAUL (VR25-0092) |
| A |
| SECTION 0300 |
| ELECTRICAL |
| 0301 |
| T-ALT 661 ECDIS MODIFICATION FOR PAPERLESS |
| A |
| Page 1 of |
| 3 |
| Print Date: |
| 04/09/2026 |
MSC Corrective Maintenance
Engineering Report
| 0302 |
| BILGE FLOODING ALARM (VR20-0068) |
| A |
| 0303 |
| TAKE-CSI-HIGH VOLTAGE SHIP SERVICE AND EMERGENCY |
| A |
| 0304 |
| TAKE-CSI-CLEANING MAIN GENERATORS AND |
| A |
| 0306 |
| TAKE-CSI-EMERGENCY GENERATOR - INSPECT AND |
| A |
| 0310 |
| TAKE-CSI-REPLACE UPS BATTERIES (2.5 YR) |
| A |
| SECTION 0400 |
| COMMUNICATION AND NAVIGATION |
| 0401 |
| EPIC ANNOUNCING SYSTEM (VR25-0097) |
| A |
| 0404 |
| TAKE-CSI-OE-570 WSC ANTENNA SYSTEM MAINTENANCE |
| A |
| 0407 |
| TAKE-CSI-CALIBRATE ELECTRONIC TEST EQUIPMENT |
| A |
| 0444 |
| T-ALT 649 SHIPS WHISTLE (VR25-0076) |
| A |
| 0459 |
| TAKE-CCSI-ECHO SOUNDER SERVICE (2.5 YR) |
| A |
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0501 |
| MDG VENT CONTAINMENT DRAIN PIPING AND VALVE |
| A |
| 0507 |
| TAKE-CSI-STEERING GEAR RELIEF VALVE TESTING (5 YR) |
| A |
| 0508 |
| FLIGHT DECK SPRINKLER PIPING (VR24-0057) |
| A |
| 0509 |
| INSPECTION OF SHIPS AIR RECEIVERS (VR25-0056) |
| A |
| 0510 |
| DRAIN PIPING REPAIRS |
| A |
| 0511 |
| M4 MOORING WINCH REPAIRS (VR25-0086) |
| A |
| 0512 |
| ANCHOR WINDLASS PLANETARY GEAR REPLACEMENT |
| A |
| 0513 |
| EDG TURBOCHARGER AND CYLINDER HEADS REUBILD |
| A |
| 0516 |
| TAKE-CSI-SEWAGE SYSTEM PIPING CLEANING (2.5 YR) |
| A |
| 0555 |
| INSPECT, TEST AND CERTIFY NON-CARGO LIFTING GEAR |
| A |
| 0564 |
| SCBA COMPRESSOR AND FILLING STATION REPAIRS |
| A |
| 0565D |
| TAKE-CCSI-FIXED GAS FIREFIGHTING SYSTEM |
| A |
| 0574 |
| LAGGING AND INSULATION REPAIRS |
| A |
| 0578 |
| TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER |
| A |
| 0579 |
| TAKE-CCSI-BOLL AND KIRCH AUTO FLUSH FO FILTER |
| A |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0601 |
| TILE DECK RENEWALS (VR24-0018) |
| A |
| 0603 |
| LIFEBOAT DAVITS SHEAVE PINS (VR25-0087) |
| A |
| 0604 |
| LIGHT POSTS AND FIXTURES (VR25-0052) |
| A |
| 0605 |
| REPAIR AND REPLACE JOINER DOORS (VR26-0012) |
| A |
| 0606 |
| ENGINE ROOM LAGGING (VR26-0004) |
| A |
| 0610 |
| TAKE-CSI-GALLEY AND MSO EQUIPMENT CALIBRATION |
| A |
| 0668 |
| TAKE-CCSI-INSPECT, TEST AND CERTIFY MATERIAL |
| A |
| SECTION 0800 |
| HVAC |
| Page 2 of |
| 3 |
| Print Date: |
| 04/09/2026 |
MSC Corrective Maintenance
Engineering Report
| 0801 |
| T-ALT 657 MUSHROOM VENTILATOR W WATERTIGHT |
| A |
| 0802 |
| NO. 1 AIR CONDITIONING SHAFT SEAL (VR25-0096) |
| A |
| 0805 |
| AHU HEATERS REPLACEMENT (VR24-0119) |
| A |
| 0851 |
| TAKE-CCSI-GALLEY VENTILATION SYSTEM AND |
| A |
| 0852 |
| TAKE-CCSI-LAUNDRY VENT CLEANING (2.5 YR) |
| A |
| SECTION 1000 |
| UNDERWAY REPLENISHMENT EQUIPMENT |
| 1001 |
| HAULING WINCH DRUM CLUTCH ASSEMBLY |
| A |
| 1002 |
| SPANWIRE ELECTRIC MOTOR REPAIR (VR26-0007) |
| A |
| 1003 |
| REMOVE, REFURBISH AND REINSTALL RAM TENSIONER |
| A |
| 1006 |
| RAS STA 2, 6 & 8 CONTROLEX SOLO CABLES INSTALL |
| A |
| 1008 |
| FABRICATION OF HAULING WINCH LABYRINTH RINGS |
| A |
| 1061 |
| TAKE-CSI-HIGHLINE ASD REFURB AND FDN PRESERV(10 |
| A |
| 1062 |
| TAKE-CSI-HIGHLINE SPANWIRE WINCH BAND BRAKE |
| A |
| 1076 |
| TAKE-CSI-WINCH CONTROL BOOTH WINDOWS AND |
| A |
| Page 3 of |
| 3 |