Attachment J-1 is a Price Schedule for Solicitation 030ADV26Q0008 for Painting Frame Fabrication Services issued by the Library of Congress. The document outlines a detailed project timeline and deliverables, including site visits, detailed drawings, samples, fabrication, and delivery of eight painting frames, with specific milestones between January and July 2026. The contractor is required to generate shop drawings, present samples, fabricate components, deliver and frame paintings, and provide a punch list of delivery items.

The pricing schedule shows a total project value of $0.00, with key deliverables marked as "Not Separately Priced (NSP)" for activities such as the initial site visit. Critical dates include shop drawing delivery by 1/30/2026, sample presentation by 2/28/2026, fabrication between 3/1/2026 and 6/1/2026, painting delivery by 6/15/2026, and a final punch list due by 7/1/2026. The project involves creating custom, conservation-grade frames with acrylic glazing and support components for paintings, including on-site fitting and preparation of hanging and security hardware.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Price Schedule Solicitation 030ADV26Q0008 - Attachment J-1 - Price Schedule

Offeror shall complete the price schedule below.

Price Schedule: Offeror shall insert a firm fixed price for each deliverable under the "Total Price" column.

SOW SectionDeliverableDue DateTotal Price
C.3.1, C.3.2Site Visit(s): Kick off meeting and site visit to complete field dimension, review exhibit components and delivery requirements.Within 5 days of period of performance start date.Not Separately Priced (NSP)
C.3.3Detail Drawings: Generate shop drawings in CAD of each typical exhibit element to be fabricated for review/approval by LOC staff. Deliver samplesNo later than 1/30/2026
C.3.4Samples:
Present required samples to LOCNo later than 2/28/2026
C.3.5Fabrication:
Fabricate all componentsBetween 3/1/2026 – 6/1/2026
C.3.9Delivery and Framing of eight paintings:
Deliver scope of order for original installationNo later than 6/15/2026
C.3.10Punch List: Official list of delivery items needed for replacement or repairNo later than 7/1/2026
TOTAL:$0.00