Attachment J 0200000-08 ELINs.xlsx

XLSX spreadsheet 61 KB Posted

Attached to
REGIONAL ELECTRIC UTILITY TREE TRIMMING AND GROUND CLEANING SERVICES
Solicitation number
N4008524R2861
Issued by

About this file

This document is an Exhibit Line Item Numbers (ELINs) attachment for a federal contract opportunity related to electric utility tree trimming and ground clearing services. The attachment details comprehensive pricing and service specifications for tree pruning, tree and stump removal, undergrowth clearing, vine removal, and herbicide application across multiple tree size categories, ranging from 3-inch to 48-inch caliper trees. The contract covers five option periods with consistent line items (A700-A719, B700-B719, etc.) for the Norfolk Naval Shipyard and several other naval installations in Virginia, including Portsmouth Naval Hospital, Little Creek Naval Amphibious Base, Oceana Naval Air Station, and Yorktown Weapons Station.

Key service elements include directional pruning methods with specific clearance requirements (20-foot vertical and 15-foot lateral), debris removal on the same or next work day, and emergency response capabilities. The contractor must provide detailed scheduling within five working days of receiving a task order and complete work within specified timeframes depending on the scope. Unique line items cover specialized services like ground-up tree pruning, stump removal, herbicide application, and an emergency response option. The Materials and Equipment and Composite Hour Labor Rate line items are designated as "MUST BE NEGOTIATED BY KO" (Contracting Officer), indicating flexibility in final pricing determination. The solicitation number is N4008524R2861, issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
24R2861 Amendment 0004.pdf PDF
24R2861 Amendment 0003.pdf PDF
Amendment 0002 N4008524R2861.pdf PDF
24R2861 Amendment 0001.pdf PDF
24R2861 Section F Annexes.pdf PDF
24R2861 Tree Trimming RFP.pdf PDF
Section J-0200000 Attachments.pdf PDF
24R2861 Section C Annexes.pdf PDF
Section J-1503050 Attachments.pdf PDF
J-0200000-07 - SERVICE PROVIDER INFORMATION.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Summary
** NOTE** (EA Annually) and (XX EA) in ELINs to refer to Annex 0200000 Management and Administration Section J Acronyms and Definitions.
PeriodRecurringNonrecurring
BASE$ - 0$ - 0
OPTION 1$ - 0$ - 0
OPTION 2$ - 0$ - 0
OPTION 3$ - 0$ - 0
OPTION 4$ - 0$ - 0
OPTION 5$ - 0$ - 0
Totals$ - 0$ - 0
Total Aggregated$ - 0

ELINs-Base Period-Non Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008524R2861
EXHIBIT A
Line Item 0001 Non-Recurring Work - Base Period
PROVIDE PRICES FOR ELECTRIC UTILITY TREE TRIMMING AND GROUND CLEARING SERVICES. - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A719
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Electric Utility Line Tree Pruning, (LF, Pole to Pole Clearance Zone)The contractor shall perform utility line clearance tree pruning providing a 20-foot clearance above and below the power lines and 15-foot clearance on each side of the outside power line wires. This Line Item is ordered per Linear Foot (LF) based on one side of the power lines from pole to pole. Tree pruning shall be completed in accordance with ANZI Z133.1 and ANZI A300 and as follows: Trees shall be trimmed using the directional pruning method. This pruning method removes branches growing toward conductors in favor of those growing away. Reduction cuts are used for all branches that are pruned. Branches shall be pruned properly back to a lateral branch that is at least one-third the diameter of the branch being removed. Locations will be noted on each task order. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the trimming process.
All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday per task order for the first pole to pole footage, 1 additional workday for every additional pole to pole footage ordered.80,000LF$ - 0$ - 0
A701Special Electric Utility Line Tree Pruning, Tree Pruning from ground up (LF, Pole to Pole Clearance Zone)The contractor shall perform special utility line clearance (from ground up) tree pruning providing a 20-foot clearance above the power lines and 15-foot clearance on each side of the outside power line wires, beginning at ground level and extending to 20 feet above the highest conductor.. This Line Item is ordered per Linear Foot (LF) based on one side of the power lines from pole to pole. Tree pruning shall be completed in accordance with ANZI Z133.1 and ANZI A300 and as follows: Trees shall be trimmed using the directional pruning method. This pruning method removes branches growing toward conductors in favor of those growing away. Reduction cuts are used for all branches that are pruned. Branches shall be pruned properly back to a lateral branch that is at least one-third the diameter of the branch being removed. Locations will be noted on each task order. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the trimming process.
All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday per task order for the first pole to pole footage, 1 additional workday for every additional pole to pole footage ordered.40,000LF$ - 0$ - 0
A702Tree and Stump Removal

(48-1/8" and Above Caliper) Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first tree, two additional workday for each additional tree ordered.

3EA$ - 0$ - 0
A703Tree Removal Only (48-1/8" and Above Caliper)Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

3EA$ - 0$ - 0
A704Tree and Stump Removal (36 1/8" to 48" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

5EA$ - 0$ - 0
A705Tree Removal Only (36 1/8" to 48" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

5EA$ - 0$ - 0
A706Tree and Stump Removal (24 1/8" to 36" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

10EA$ - 0$ - 0
A707Tree Removal Only (24 1/8" to 36" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

10EA$ - 0$ - 0
A708Tree and Stump Removal (12 1/8" to 24" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

50EA$ - 0$ - 0
A709Tree Removal Only (12 1/8" to 24" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

50EA$ - 0$ - 0
A710Tree and Stump Removal ( 6 1/8" to 12" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

150EA$ - 0$ - 0
A711Tree Removal Only (6 1/8" to 12" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

150EA$ - 0$ - 0
A712Tree and Stump Removal (3 1/8" to 6" Caliper)Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first five trees ordered, and one additional workday for every five additional trees ordered.

600EA$ - 0$ - 0
A713Tree Removal Only (3 1/8" to 6" Caliper)Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first five trees ordered, and one additional workday for every five additional trees ordered.

600EA$ - 0$ - 0
A714Under brushingAll brush, shrubs, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday for the first 5,000 Square Foot, one additional workday for every additional 5,000 Square Foot ordered.
The total right of way cleared should be 40 ft500,000SF$ - 0$ - 0
A715Cut, Remove, and Herbicide VinesThe contractor shall cut all vines growing on a single utility pole at ground level and remove all vines growing up and around the utility pole. Any and all vines growing on a utility pole guy wire are to be considered as a part of the work ordered for a single pole. Each leg of a utility tower shall be ordered individually. In the event that vines grow up one leg and then cross to another side of the tower, the vines shall be ordered as one leg. When removal is complete apply herbicide to an area at least one foot around the pole, leg, or guy wire. If vines are reaching the structure from more than one foot, apply herbicide to the predominate vine growing area to stop, discourage, or slow regrowth of vines. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days.100EA$ - 0$ - 0
A716Apply HerbicidesThe contractor shall choose a herbicide that is the best match for the intended purpose of each application. The purpose of each application shall be to kill existing unwanted plant growth in a specific area and or to discourage, or delay regrowth of unwanted vegetation. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday for the first 5,000 Square Foot, one additional workday for every additional 5,000 Square Foot ordered.
The Contractor shall choose a herbicide that has the least harmful effect on the area surrounding the area to which herbicide is to be applied, and to the flora and fauna of the surrounding area.100,000SF$ - 0$ - 0
A717Emergency ResponseThe Contractor is required to respond within two hours of notification to perform Non recurring type work at established ELIN prices for work that is identified as an emergency (work that poses a potential threat to health, safety, or property) by the Government. The Contractor shall work continuously until all work is complete. Work will be ordered in conjunction with other Line Items at the normal bid price or negotiated price. Payment is based solely on the timeliness to respond and the diligent progress of the Contractor’s performance in relieving the emergency.5EA$ - 0$ - 0
A718Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) MUST BE NEGOTIATED BY KO.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO.500HR$ - 0$ - 0
A719Materials and Equipment MUST BE NEGOTIATED BY KO.All materials and equipment costs required to perform work requested by the Government not identified in the Non recurring work ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.

Completion time will be established per task order. MUST BE NEGOTIATED BY KO. 10,000 EA $ 1.00 $ 10,000.00

TOTAL NON RECURRING PRICE BASE YEAR $ - 0

ELINs-1ST Opt Period

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N4008524R2861
EXHIBIT B
Line Item 0002 Non-Recurring Work - Option One Period
PROVIDE PRICES FOR ELECTRIC UTILITY TREE TRIMMING AND GROUND CLEARING SERVICES. - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B719
ELIN/Product Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
B700Electric Utility Line Tree Pruning, (LF, Pole to Pole Clearance Zone)The contractor shall perform utility line clearance tree pruning providing a 20-foot clearance above and below the power lines and 15-foot clearance on each side of the outside power line wires. This Line Item is ordered per Linear Foot (LF) based on one side of the power lines from pole to pole. Tree pruning shall be completed in accordance with ANZI Z133.1 and ANZI A300 and as follows: Trees shall be trimmed using the directional pruning method. This pruning method removes branches growing toward conductors in favor of those growing away. Reduction cuts are used for all branches that are pruned. Branches shall be pruned properly back to a lateral branch that is at least one-third the diameter of the branch being removed. Locations will be noted on each task order. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the trimming process.
All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday per task order for the first pole to pole footage, 1 additional workday for every additional pole to pole footage ordered.80,000LF$ - 0$ - 0
B701Special Electric Utility Line Tree Pruning, Tree Pruning from ground up (LF, Pole to Pole Clearance Zone)The contractor shall perform special utility line clearance (from ground up) tree pruning providing a 20-foot clearance above the power lines and 15-foot clearance on each side of the outside power line wires, beginning at ground level and extending to 20 feet above the highest conductor.. This Line Item is ordered per Linear Foot (LF) based on one side of the power lines from pole to pole. Tree pruning shall be completed in accordance with ANZI Z133.1 and ANZI A300 and as follows: Trees shall be trimmed using the directional pruning method. This pruning method removes branches growing toward conductors in favor of those growing away. Reduction cuts are used for all branches that are pruned. Branches shall be pruned properly back to a lateral branch that is at least one-third the diameter of the branch being removed. Locations will be noted on each task order. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the trimming process.
All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday per task order for the first pole to pole footage, 1 additional workday for every additional pole to pole footage ordered.40,000LF$ - 0$ - 0
B702Tree and Stump Removal

(48-1/8" and Above Caliper) Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first tree, two additional workday for each additional tree ordered.

3EA$ - 0$ - 0
B703Tree Removal Only (48-1/8" and Above Caliper)Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

3EA$ - 0$ - 0
B704Tree and Stump Removal (36 1/8" to 48" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

5EA$ - 0$ - 0
B705Tree Removal Only (36 1/8" to 48" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

5EA$ - 0$ - 0
B706Tree and Stump Removal (24 1/8" to 36" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

10EA$ - 0$ - 0
B707Tree Removal Only (24 1/8" to 36" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first tree, two additional workdays for each additional tree ordered.

10EA$ - 0$ - 0
B708Tree and Stump Removal (12 1/8" to 24" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

50EA$ - 0$ - 0
B709Tree Removal Only (12 1/8" to 24" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

50EA$ - 0$ - 0
B710Tree and Stump Removal ( 6 1/8" to 12" Caliper )Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

150EA$ - 0$ - 0
B711Tree Removal Only (6 1/8" to 12" Caliper )Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. . Completion times shall be two workdays for the first two trees, and one additional workday for every two trees ordered.

150EA$ - 0$ - 0
B712Tree and Stump Removal (3 1/8" to 6" Caliper)Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree and stump removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first five trees ordered, and one additional workday for every five additional trees ordered.

600EA$ - 0$ - 0
B713Tree Removal Only (3 1/8" to 6" Caliper)Cut down and remove trees using standard trade practices and safety procedures. Trees shall be cut at a height of 6 inches above grade. All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the tree removal process.

Tree caliper shall be measured as the diameter of the tree trunk 6" above ground level.

After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be two workdays for the first five trees ordered, and one additional workday for every five additional trees ordered.

600EA$ - 0$ - 0
B714Under brushingAll brush, shrubs, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday for the first 5,000 Square Foot, one additional workday for every additional 5,000 Square Foot ordered.
The total right of way cleared should be 40 ft500,000SF$ - 0$ - 0
B715Cut, Remove, and Herbicide VinesThe contractor shall cut all vines growing on a single utility pole at ground level and remove all vines growing up and around the utility pole. Any and all vines growing on a utility pole guy wire are to be considered as a part of the work ordered for a single pole. Each leg of a utility tower shall be ordered individually. In the event that vines grow up one leg and then cross to another side of the tower, the vines shall be ordered as one leg. When removal is complete apply herbicide to an area at least one foot around the pole, leg, or guy wire. If vines are reaching the structure from more than one foot, apply herbicide to the predominate vine growing area to stop, discourage, or slow regrowth of vines. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days.100EA$ - 0$ - 0
B716Apply HerbicidesThe contractor shall choose a herbicide that is the best match for the intended purpose of each application. The purpose of each application shall be to kill existing unwanted plant growth in a specific area and or to discourage, or delay regrowth of unwanted vegetation. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday for the first 5,000 Square Foot, one additional workday for every additional 5,000 Square Foot ordered.
The Contractor shall choose a herbicide that has the least harmful effect on the area surrounding the area to which herbicide is to be applied, and to the flora and fauna of the surrounding area.100,000SF$ - 0$ - 0
B717Emergency ResponseThe Contractor is required to respond within two hours of notification to perform Non recurring type work at established ELIN prices for work that is identified as an emergency (work that poses a potential threat to health, safety, or property) by the Government. The Contractor shall work continuously until all work is complete. Work will be ordered in conjunction with other Line Items at the normal bid price or negotiated price. Payment is based solely on the timeliness to respond and the diligent progress of the Contractor’s performance in relieving the emergency.5EA$ - 0$ - 0
B718Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) MUST BE NEGOTIATED BY KO.The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
Estimated hours and completion time will be established with each task order per negotiations. MUST BE NEGOTIATED BY KO.500HR$ - 0$ - 0
B719Materials and Equipment MUST BE NEGOTIATED BY KO.All materials and equipment costs required to perform work requested by the Government not identified in the Non recurring work ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate.

Completion time will be established per task order. MUST BE NEGOTIATED BY KO. 10,000 EA $ 1.00 $ 10,000.00

TOTAL NON RECURRING PRICE OPTION YEAR ONE $ - 0

ELINs-2nd Opt Period

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N4008524R2861
EXHIBIT C
Line Item 0003 Non-Recurring Work - Option Two Period
PROVIDE PRICES FOR ELECTRIC UTILITY TREE TRIMMING AND GROUND CLEARING SERVICES. - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C719
ELIN/Product Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
C700Electric Utility Line Tree Pruning, (LF, Pole to Pole Clearance Zone)The contractor shall perform utility line clearance tree pruning providing a 20-foot clearance above and below the power lines and 15-foot clearance on each side of the outside power line wires. This Line Item is ordered per Linear Foot (LF) based on one side of the power lines from pole to pole. Tree pruning shall be completed in accordance with ANZI Z133.1 and ANZI A300 and as follows: Trees shall be trimmed using the directional pruning method. This pruning method removes branches growing toward conductors in favor of those growing away. Reduction cuts are used for all branches that are pruned. Branches shall be pruned properly back to a lateral branch that is at least one-third the diameter of the branch being removed. Locations will be noted on each task order. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the trimming process.
All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday per task order for the first pole to pole footage, 1 additional workday for every additional pole to pole footage ordered.80,000LF$ - 0$ - 0
C701Special Electric Utility Line Tree Pruning, Tree Pruning from ground up (LF, Pole to Pole Clearance Zone)The contractor shall perform special utility line clearance (from ground up) tree pruning providing a 20-foot clearance above the power lines and 15-foot clearance on each side of the outside power line wires, beginning at ground level and extending to 20 feet above the highest conductor.. This Line Item is ordered per Linear Foot (LF) based on one side of the power lines from pole to pole. Tree pruning shall be completed in accordance with ANZI Z133.1 and ANZI A300 and as follows: Trees shall be trimmed using the directional pruning method. This pruning method removes branches growing toward conductors in favor of those growing away. Reduction cuts are used for all branches that are pruned. Branches shall be pruned properly back to a lateral branch that is at least one-third the diameter of the branch being removed. Locations will be noted on each task order. The Contractor, at no additional cost to the Government, shall repair to its original condition all ground surfaces damaged by tree branches falling, or vehicle tire damage made during the trimming process.
All debris shall be removed from the limits of Government property the same day as work is performed, or no later than the next regular work day. After receiving the FEDMALL order, the Contractor shall provide a schedule that reflects the stated start and completion dates as requested in FedMall. The Contractor shall have the schedule in place to preform work and approved by the Government Representative within five working days. Completion times shall be one workday per task order for the first pole to pole footage, 1 additional workday for every additional pole to pole footage ordered.40,000LF$ - 0$ - 0
C702Tree and Stump Removal

(48-1/8" and Above Caliper) Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Backfill and compact all excavated holes to match existing grade and reseed with the same type of vegetation as surrounding area. Any required excavation permits will be provided by the base utilities department when work is ordered.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .