About this file
This document is Section F (Deliverables or Performance) from a federal contract solicitation for tree trimming and ground maintenance services across multiple naval facilities in Virginia. The deliverables section provides a comprehensive table detailing 40+ specific reporting and documentation requirements for the contractor, including submission timelines, distribution recipients, and frequency of deliverables.
Key deliverable categories include safety and compliance documents (safety certifications, permits, accident prevention plans), environmental management plans (water conservation, pesticide use sheets), personnel documentation (employee lists, key personnel qualifications, citizenship proof), and periodic reports (monthly labor reports, quality management reports, work schedules). Most deliverables require submission within 15 calendar days prior to contract start or within specified timeframes after contract commencement, with distribution primarily to the Contracting Officer (KO) and Contracting Officer's Representative (COR). The documentation requirements underscore the comprehensive administrative and safety oversight expected for this electric utility tree trimming and ground maintenance service contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24R2861 Amendment 0004.pdf | ||
| 24R2861 Amendment 0003.pdf | ||
| Amendment 0002 N4008524R2861.pdf | ||
| 24R2861 Amendment 0001.pdf | ||
| Attachment J 0200000-08 ELINs.xlsx | XLSX spreadsheet | |
| 24R2861 Tree Trimming RFP.pdf | ||
| Section J-0200000 Attachments.pdf | ||
| 24R2861 Section C Annexes.pdf | ||
| Section J-1503050 Attachments.pdf | ||
| J-0200000-07 - SERVICE PROVIDER INFORMATION.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration
Section F 0200000 Deliveries or Performance
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
2 As required
2.3.1 N/A Sign-in Sheets and
Minutes for Review and Comments
Within two working days
KO, COR
and all attendees
3 As Required
2.3.1 N/A Sign-in Sheets and
Minutes Final Revision
Within two working days
KO, COR
and all attendees
3 As Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
2 As specified
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
2 As required
2.3.5.1 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
2 As specified
2.6.1 N/A Plans of Action
and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command Security Manager
2 As required
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command Security Manager
2 As required
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.6.4 N/A Scheduling and
Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
COR
2 As Specified
2.6.4 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 2 Monthly
2.6.5 N/A Notification of any
Difficulty in Scheduling Work
By the end of each workday
KO and
COR
2 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
2 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
2 As required
2.6.7.1 N/A Traffic Plan At least five
working days in advance
KO and
COR
2 As required
2.6.9 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
specified
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.6.9 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
2 As specified
2.6.9.1 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
2 As specified
2.6.9.2 N/A Contractor Quality
Inspection and Surveillance Report
First workday of each month.
KO and
COR
2 Monthly
2.7.1 N/A List of Key
Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
2 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
2 As specified
2.7.2.6 N/A Proof of United
States of America Citizenship
Prior to be admitted to site of work.
KO and
COR
2 As specified
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31 October
KO and
COR
2 Annually for labor executed during the period of performanc e during each Governmen t fiscal year
(FY)
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2 As required
2.8.8 N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
and
Security Manager
3 As required
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.8.9 N/A List of personnel
requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security Manager
3 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2 As specified
2.9.2.1 N/A Activity Hazard
Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
2 As specified
2.9.3 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
2 As specified
2.9.4 N/A Control of
Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
2 Annually
2.9.6 J-0200000-05-
NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
2 As required
2.9.6 J-0200000-05-
Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO and
COR
2 As required
2.9.6 J-0200000-05-
Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
2 As required
2.9.8 N/A Monthly On-Site
Labor Report
First workday of each month.
KO and
COR
2 Monthly
2.9.9 N/A OSHA Citations
and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.9.10 N/A Safety Inspection
and Monitoring Report
Upon request. KO and
COR
2 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
2 As specified
2.10 N/A EMS Goals and
Policy Measurement Information
Upon request. KO and
COR
2 As required
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2 As specified
2.10.2.2 N/A Emergency
Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
2 As specified
2.10.2.2 J-0200000-05-
Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
2 Annually
2.10.2.3 N/A Fuel and hazardous
substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
2 As required
2.10.2.3 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
2 As required
2.10.2.3 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.10.3 N/A Sustainable
Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
2 Annually
2.10.3 N/A Sustainable
Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
2 Annually
2.10.3 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
2 As specified
2.11 N/A Mission Essential
Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2 As Required
2.11 N/A Mission
Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
2 As specified
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
2 As specified
2.12.1 N/A Pipe Delimited
Flat-File
By the end of each workday
KO or a representat ive designated by the KO
2 Daily
2.12.1 N/A Sample Pipe
Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representat ive designated by the KO
3 As required to demonstrat e the ability to properly format the flat-file
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.12.2 N/A List of personnel
requiring access to Government’s Maximo
Within 30 calendar days prior to contract start.
KO and
COR
2 As specified
2.14 Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
2 As required
2.14.1 N/A Notification to the
Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
2 As required
2.15.1.1 N/A Non-Recurring
Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and
COR
2 Monthly
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO and
COR
2 As required
1503050 – Grounds Maintenance and Landscaping
SECTION F: DELIVERIES OR PERFORMANCE
Section F – 1503050 Grounds Maintenance and Landscaping
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.2.1 N/A Certification, Training, and Licensing
Within 15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO/COR 2 Annually and as required by Section H – Special Contract Requirements, FAC 5252.237-
9301 Substitutions of Key Personnel
(JUN 1994)
2.3.1.1 N/A Business
Licensing
Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO/COR 2 As required
2.3.1.5 J-1503050-05 Planned
Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO,
COR,
PPMC
3 Annually for each pesticide/herbicide, as required.
2.3.3 N/A Permits Within 15
calendar days prior to start of work.
KO/COR 2 As required
2.3.9.1 N/A Water
Conservation Plan
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
2.4 N/A Top Dressing
and Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule