ATTACHMENT III - DRAWINGS 5.27.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25025Q0554
About this file
The provided document is a set of architectural drawings for the Cincinnati VA Medical Center, specifically focusing on security camera installation and facility improvements. The drawings include detailed floor plans for the 7th floor (Methadone Clinic), 3rd floor, and the Community Living Center (CLC) 1st floor, along with a site map of the medical campus. The primary project objective is to enhance facility security by installing additional cameras in Building 2 (CLC) and Building 1 at the Cincinnati VAMC.
The technical drawings provide precise camera mounting details, with a specific note highlighting that one camera (out of nine) on the 7th floor will be an independent system tied directly to a local monitor in an adjacent consult room. The site map indicates the location of key buildings, including the Main Entrance, Emergency Entrance, and Community Living Center & Outpatient PT Rehab facility. The drawings are part of solicitation 36C25025Q0554, issued by the Department of Veterans Affairs Veterans Health Administration, with an improvement project focused on security upgrades across multiple building zones.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25025Q0554 0002.docx | DOCX document | |
| Site visit sign in sheet 6.18.25.pdf | ||
| 36C25025Q0554 0001.docx | DOCX document | |
| ATTACHMENT V- LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE.pdf | ||
| ATTACHMENT VI - RFI FORM.docx | DOCX document | |
| 36C25025Q0554_1.docx | DOCX document | |
| ATTACHMENT II - DBA WD.pdf | ||
| ATTACHMENT IV - SPECS COMBINED.pdf | ||
| ATTACHMENT I - JA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tobacco & Acohol
Research Center B712
Group Rm.
B713
Office B711A Off.
B714
Off.
B711 Off.
B714A
Office B710
Off.
B715A
Office B709 Off.
B715B
Stair 3 S*7*3
Elec B706
Staff Tlt.
B705E Break
Room B705D
Signal Closet B705F
Reception B705C
Stor.
B719
Office B708 Off.
B716A
Adm. Asst.
B716B
Off.
B717
Bath B721A
Off.
B721
Off.
B722
Off.
B723
Off.
B724
Group Room B725
Elec.
B720
Waiting B705
Stor.
B731
HAC
B732
Stat.
B704
KLT
B730
Tlt.
B729A
Off.
B729
Tlt.
B722A
Corridor C*7*5
Tlt.
B723A
Wash Room B728
Off.
B727
Off.
B726
Tlt.
B726A
Group Room B725B
Off.
B733
Off.
B733B
Nurse Man.
B703
Elec.
A728B
Stair 2 S*7*2
Nurse T.L.T.
A723A
Bed Room A722
T.L.T.
A722A
Q.R.
A723
Station Meds A725A
Stor.
A724
Tele.
A713
Ex. Group A720 Bed Room
A719 Bath A719A
S.R.
A718
S.R.
A717
Clean Linen A716
S.R.
A715
T.L.T.
A715A
Bath A711A
Exist.
Seclusion
A711B
S.R.
A709A
Ante A709
Corridor C*7*3
Bath A709B
Office #2 A768
Office #5B A765
Bath A707A
Bath A706A Office #3
A769
Obser.
A710
Elec.
A714
Soil. Util.
A712
Ante A711
Clos.
A772
Nurse Station A705A
Copy Rm.
A773A
S.R.
A706
Vis. Bath A771
Testing A770
Corridor C*7*4
Office A762
Office #5 A763
Office #5A A764
T.R.
A708
T.R.
A707
Staff Office A767
Group #1 (12-20)
A766
Bath A708A
Office A767A
Dining/Group Room A705
Corridor C*7*2
Sensory Therapy Room A704
Storage A704B
Bath A702A
Nurse Station
A725
Nurse Station
Work/Conference A725B
Break Room A726
Laundry A728A
Lockers A727B
Trash Chute A727A
Service Elev. Lobby
A727 Staff Tlt.
A736
Sig. Clos.
A734
Elec.
A739 Elec.
A759
Interview Room A702
Elec.
A758
Nurse Off.
A701
Chief Nurse Off.
A700
Exam Rm.
A776
Office #18 A775 Reception
A773
HAC
A760
Ante A761
Staff Toilet A761A
Office #6 A757
Office #7 A756
Office #8 A755
Office #9 A754
Tlt.
A753
Office #10 A752
Storage A740
Waiting A774
Office #14 A743
Office #13 A744
Office A741
Office A742
Training (6) A746
Stor.
A747
Stor.
A735A
HAC
A735
Stair 1 S*7*1
Stair 5 S*7*5
S. Office #11A A748
S. Office #11A A749
Office #12 A750
Group Room A728
Closet A728E
Group #2 (10-12)
A751
Corridor C*7*6
SEVENTH FL. KEY PLAN
Scale: 1/64" = 1'-0"
Dispense/ Pharmacy
Corridor
Nurse Pract.
Tlt.
Soc.
Worker
Intake Coor.
Vault Tlt. Consult/
LPN
Consult
Waiting
EHRM
Tlt.
Nurse Mgr.
B702
B701 B734
B734A
B733A
A728CA728D
C*7*1
A732
A732A
A730 A729
A731A731A
B703
Dispense/ Pharmacy
Nurse Pract.
Soc.
Worker
Vault Tlt.
B702
B701
B734A
A728CA728D A729
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
01-CAI.107
SEVENTH FLOOR PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD STAMP:CONSULTANT
321 4 6 7 8 9 10
IMPROVE CLC &
FACILITY SECURITY
CINCINNATI, OHIO (539)
09.05.2024 CWA
Revisions: Date:
ADDRESS:
CAI RECORD DRAWING
& SPACE ASSIGNMENTS
CINCINNATI VAMC
3200 VINE ST.
CINCINNATI, OH 45220
NOT FOR CONSTRUCTION
7TH FLOOR PLAN
SCALE: 3/8" = 1'-0"
539-25-506
C C*
*: Camera shall be on an independent system, tied directly to a local monitor in the adjacent consult room. This is the only camera of the (9) being installed that will be on an independent system.
VHACINReynoM Ellipse
VHACINReynoM Text Box
CC
VHACINReynoM Arrow
VHACINReynoM Polygon
VHACINReynoM Polygon
VHACINReynoM Rectangle
VHACINReynoM Rectangle
VHACINAppleC Oval
VHACINAppleC Line
149 SF
Medical Service Admin
1,147 SF
SPS Service
139 SF
Nursing Service Admin
Off.
B319D
Off.
B319C
Off.
B319B
O.R.
Light Rm.
C352C
Off.
Stor.
B319
Res. Stor.
B318 O.R. 3
C351 Control Room B320A
Eq. Stor.
B317
210 SF
Nursing Service Admin
196 SF
Surgical
2,105 SF
Nursing Service Admin
Stair 3 S*3*3
Off.
B311A
Off.
B311B
Lounge B311C
Asst. Ch.
B311D
Asst. Ch.
B311E
Adm. Off.
B311F
Word Proc.
B311G
Off.
B311H
Chief Nurse B311I
Stor.
B311M
Stair 4 S*3*4
Corridor C*3*5
Elec B306
Stor.
B310 Nurse
Educator B309 Classroom
B308
Storage B308A
Ante Rm/ Clean Exit
B307
Office B305B
Open Office B305
Office B305A
Office B305C
Conf Rm.
B305D
Work Area B322B
Office B310A
Conf.
B310B
Office B311
Off.
B312A
Research Off.
B312
Elec.
B312C
Sig.
B312B Elec.
B322C
Learning Exchange
B322
O.R. 6 C348
Mech.
C342
Clean Vendor
Cool Down Cart B307B
23 SF
Nursing Service Admin
199 SF
Nursing Service Admin
934 SF
Education
7,411 SF
SPS Service
175 SF
Nutrition/Food
183 SF
Prosthetics
Prosthetics
728 SF
Stair 2 S*3*2
Chief PBS A324D
Office A324E
Office A324G
Stor.
A324F
Office A324C Adm. Asst.
A324
Office A324B
Stor.
A324H
Stor.
A324I
Office A324A
Ward Adm.
Off.
A323
Pros. Stor.
A330
Elec.
A331A
Corridor C*3*2
Clos.
A320A
Chief Off.
A321
Pros. Adm.
Asst.
A320
Stor.
A317
HAC
A318
Asst. Chief A319 M. Tlt.
A316 Elec.
A315
Waiting A307
1,400 SF
Healthcare Admin Service
64 SF
Nutrition/Food
831 SF
Nutrition/Food
182 SF
Specialty Care
779 SF
Specialty Care
4,508 SF
Surgical
2,678 SF
Prosthetics
Stair 11 S*3*11
166 SF
Director's Suite/Quality Management
Adm. Asst.
A307A
Exam A308
F. Tlt.
A306A
Diet Off.
A305
HAC
A378
Diet Sec.
A303
Chief Diet.
A302
Vascular Lab A301
Vasc. Lab A300
Vasc. Lab A379 Off.
A361
Mech.
A351
Elec.
A350 HAC
A380 Female Locker A382C
M. Lock.
A382B
Tlt.
A382A
Respiratory Therapy
A384
Lounge A382
Off.
A360
Corridor C*3*4
Off.
A359
Adm. Asst.
A352
Sig.
A396
Off.
A353
Elec.
A395
Off.
A314
Exam A309
CAD/CAM
A313
Storage A310
Mechanical A3002
Off.
A358
Conf.
A354
Patient Room A387I
Off.
A357
Chief of Surgery
A355
Plaster A312
Off.
A356
Lab A311
Machine A311A
Physician Review A355B
Equip. Stor.
A392
HVAC
A394
Off.
A355A
Stair 9 S*3*9
Nurse Off.
A390
Patient Room 10
A387K
277 SF
On-Call Program
Patient Room A387J
Shower A387H
Soil Utility A391
Linen Clos.
A389
Tlt.
A388
Patient Room A387G
11,436 SF
Beds ICU
290 SF
SPS Service
Corridor C*3*18
113 SF
Primary Care
Pharm.
A386
Nurse
Clean Supply
A397
Station A387
Patient Room A387F
Pros. Off.
A332
Stor.
A336
Asst. Chief Diet.
A337
Stor.
A335
F. Locker A340
M. Locker A339
Tr. Ch.
A338A
Service Lobby A338
Stor.
A344
Stor.
A344A
Sig.
A345
Stair 1 S*3*1 Elect.
A346
Tlt.
A347A
UP
Corridor
C*3*3 UP Patient Room A387E
947 SF
Surgical
Vasc. Lab A347
Tricare Services
NC/CPAC
A348
Off.
A350A
Off.
A350C
Off.
A350B
Off.
A350D Off.
A349
HAC
B307D
Gowning Rm.
A341
De-Gown A342
RO DI
Water A343
Prep/Pack B307C
De-Con B303
Db. Wtr B302
HAC
B301
Reception B327
HAC
B303A
Office C300
Patient Rm.
C304A
Corridor
C*3*1 UP
F. Tlt.
A341
Corridor C*3*19
Elec A338B
M. Tlt.
A342
OI&T
EHRM TR
C305
Corridor C*3*17
Office C306
Acute Care C307
Stair 5 S*3*5
On Call A381
Tlt.
A381A
Soc. Wrk.
A383
Storage C308
Family Wtng.
C310
Patient Rm C304B
Patiet Rm C304C
Electrical C309 Tele
C311 Dr. Office
C315
Office C317
Office C319
Office C321
Office C323
Lactation C312
Grieve Consult
C313
ICU Dir.
Off.
C314
Office C325
Stair 6 S*3*6
Family Waiting
B326
Steam Equip Rm.
B307A
Off.
C361
UP
Tlt.
C302A
Consult C301
Patient Tlt.
C303 Patient Rm.
C304O
Patient Rm.
C304G
Patient Rm.
C304F
Meds.
C304D
Clean Supp.
C304E
Frozen Section
C316
Sterile Core C347A
W. Shower C322A
Utility C320
Office C318
Corridor C*3*9
Entry C322C
Entry C324 M. Shower
C324A
Elec.
C335
Tele.
C333
Break Rm.
C302 Patient Rm.
C304N PACU
C304
EMS
C360
Patient Rm.
C304M
Patient Rm.
C304L
Patient Rm.
C304K
Patient Tlt.
C304J
Patient Rm.
C304I
Patient Rm.
C304H
Cysto O.R.
C332 Women's Locker C322
Men's C3002A
Cysto O.R.
C347 Women's
C3002BFD
Room B307E
UP
Corridor
C*3*6 Office C330
HAC
C346
Anesthesia Tech.
C328
Staff Vestibule
C322B
Men's Locker C324B
Waiting C3002
Vestibule C324C
Lounge C326 Stair 10
S*3*10
376 SF
Surgical
375 SF
Digestive/Endoscopy
23,157 SF
Surgical
Lobby C3001
Drop Off B304
Pat. Dining
B325 HAC
C359 Storage
C358 Soil C357
Anaesthetics C356
Stretcher Stor.
C355
Corridor C*3*7 A/C Shaft
C337A
Oxygen Storage
C369
Corridor C*3*13
Anesthesia Work Rm.
C337
Patient Toilet Rm.
C3037
Prep/Recovery Rm.
C3038
Prep/Recovery Rm.
C3039
Post-Op C3040
Elec.
Sub-Waiting
C3036 C3036A
Temp.
Control C3005A
OI&T
EHRM
C3006
Reception C3004
Consult.
C3005
Work Rm.
C3004A
Corridor C*3*11
Staff Work Rm.
C3007
Storage C3007A
O.R.
Alcove C334
Corridor C*3*12
Work Area B322A
Stor.
B316
F. Tlt.
B315
Classroom B321B
Nursing Conf.
B314
Office B321
Clean Core C340
O.R. 5 C349
Signal Clos.
C3035
O.R. #7 C329
HAC
C3033
Elec.
C338A
O.R. 4 C350
O.R.
Storage
C339 SPD Case
Cart C3034
Prep/Recovery Rm.
C3029
Stor.
B321A
Stor.
B320B
O.R.
Alcove C352E
Prep/Recovery Rm.
C3027
Isolation Prep/Recovery
Rm.
Prep/Recovery
Rm.
C3028
Isolation Prep/Recovery
Rm.
C3012
Prep/Recovery Rm.
C3011
Prep/Recovery Rm.
Soiled Utility C3032
C3030
Nurse Station C3031
Prep/Recovery Rm.
C3010
Patient Toilet Rm.
C3008
Staff Toilet C3009A
Staff Break Rm.
C3009
C3013
Cleaning Supply C3016B
Classroom B320
O.R. 2 C353
O.R. 1 C354 Procedure
Rm.
C3025
Procedure Rm.
C3026
Scope Clean Supply C3014
Cleaning C3016A
Ante Rm.
C3016
HAC
B319E
B319A
Corridor C*3*14
Alcove C352B
O.R.
Alcove C352A
O.R.
Alcove C352
Fluoro Procedure
Rm.
C3023
Pat. Tlt.
C3022
Scope Storage C3017
4,380 SF
Education
Isolation Corridor C*3*16 Corridor
C*3*15
Procedure Rm.
C3024
Procedure Rm.
C3021
Wash Room C3020
Stair 8
S*3*8 8,311 SF
Digestive/Endoscopy
Physician Work Room
C3019
Conference Room A385
Patient Room 1
A387A
Patient Room A387B
Patient Room A387C
Patient Room A387D Department Area Legend
Beds ICU Common Space/Lobby Space Digestive/Endoscopy Director's Suite/Quality Management Education Healthcare Admin Service
Medical Service Admin Nursing Service Admin Nutrition/Food On-Call Program Primary Care Prosthetics Specialty Care SPS Service Surgical
11,271 SF
20,889 SF
8,686 SF
166 SF
5,314 SF
1,400 SF
149 SF
2,676 SF
1,069 SF
277 SF
113 SF
3,590 SF
962 SF
8,848 SF
29,183 SF
95,049 SF
THIRD FLOOR PLAN
Scale: 1/16" = 1'-0"
143 SF
Information Management
Information Management 456 SF
OI&T
EHRM
B313
149 SF
Information Management
164 SF
Information Management
Resident Room C313B
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
01-CAI.103
THIRD FLOOR PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD STAMP:CONSULTANT
321 4 6 7 8 9 10
UPDATE FACILITY BIM
CINCINNATI, OHIO (539)
09.05.2024 CWA
Revisions: Date:
ADDRESS:
CAI RECORD DRAWING
& SPACE ASSIGNMENTS
CINCINNATI VAMC
3200 VINE ST.
CINCINNATI, OH 45220
CHIEF OF ENGINEERING
ZACH SCHMIDT
NOT FOR CONSTRUCTION
B01-PIPE BASEMENT
B01-BASEMENT
B01-FIRST FLOOR
8,350 SF
96,117 SF
116,957 SF
B01-SECOND FLOOR 103,461 SF
B01-THIRD FLOOR 95,049 SF
B01-FOURTH FLOOR 44,396 SF
B01-FIFTH FLOOR
B01-SIXTH FLOOR
40,418 SF
36,960 SF
B01-SEVENTH FLOOR 30,816 SF
B01-EIGHTH FLOOR 25,908 SF
B01-NINTH FLOOR
B01-PENTHHOUSE
B01-MECHANICAL
624,899 SF
18,835 SF
4,612 SF
3,020 SF
CAI Gross Building Area
VHACINAppleC Stamp
VHACINAppleC Rectangle
VHACINAppleC Line
Line
BATHROOM
1117A
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BATHROOM
1116A
BEDROOM
BATHROOM
1115A
BATHROOM
1114A
ELECTRIC
CLOSET
BATHROOM
1113A
BATHROOM
1112A
BEDROOM
BATHROOM
1110A
BATHROOM
1111A
BEDROOM
BEDROOM
1118 BATHROOM
1118A MED
NURSE'S
STATION
CLOSET
LEISURE
TECH
CLOSET
BARBER
SHOP
ACTIVITIES
GROUP
ROOM
WHEELCHAIR
STORAGE
LAUNDRY
OXYGEN
STORAGE
STAFF
MEN'S
STAFF
WOMEN'S
BATHROOM
1123A
BEDROOM
BEDROOM
BEDROOM
1122 BATHROOM
1122A
HAC
SOILED
UTILITY
COMP.
CLOSET
BATHING
SUITE
CLEAN
SUPPLY
KITCHEN &
PANTRY
CORRIDOR
C*1*9
CORRIDOR
C*1*11
BATHROOM
1121A
BEDROOM
BATHROOM
1120A
LINEN
CLOSET
DINING
ROOM
NURSES
STATION
1106A
WORK
ROOM
1106B
DN
STAIR 3
S*1*3
BEDROOM
BATHROOM
1119A
SPECIAL
CARE
CORRIDOR
C*1*10
DEN
LINEN
CLOSET
COAT
CLOSET
1134 SHORT
TERM
REHAB GYM
BATHROOM
1108A
SPECIAL
CARE
RESIDENT
ROOM
BATHROOM
1109A
BEDROOM
CORRIDOR
C*1*8
CLC 1S - FIRST FLOOR PLAN
SCALE: 3/32" = 1'-0"
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
2N-CLC-1
CLC 1S - FIRST FLOOR PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD STAMP:CONSULTANT
321 4 6 7 8 9 10
IMPROVE CLC &
FACILITY SECURITY
CINCINNATI, OHIO (539)
09.05.2024 CWA
Revisions: Date:
ADDRESS:
CAI RECORD DRAWING
& SPACE ASSIGNMENTS
CINCINNATI VAMC
3200 VINE ST.
CINCINNATI, OH 45220
NOT FOR CONSTRUCTION
539-25-506
VHACINReynoM Ellipse
VHACINReynoM Text Box
CC
VHACINReynoM Arrow
VHACINReynoM Ellipse
VHACINReynoM Text Box
CC
VHACINReynoM Arrow
VHACINReynoM Ellipse
VHACINReynoM Text Box
CC
VHACINReynoM Arrow
VHACINReynoM Ellipse
VHACINReynoM Text Box
CC
VHACINReynoM Arrow
VHACINReynoM Ellipse
VHACINReynoM Text Box
CC
VHACINReynoM Arrow
VHACINReynoM Text Box
CC
VHACINReynoM Ellipse
VHACINReynoM Arrow
VHACINReynoM Ellipse
VHACINReynoM Arrow
Rectangle
CLC 1st Floor (Page 3)
GI Lab 3rd Floor (Page 2)
Methadone Clinic 7th Floor (Page 1) Watch Office 1st Floor
VHACINAppleC Stamp
VHACINAppleC Polygon
VHACINAppleC Polygon
VHACINAppleC Polygon
VHACINAppleC Polygon
VHACINAppleC Line
VHACINAppleC Line
VHACINAppleC Line
VHACINAppleC Line
Stamp
| 7TH FLOOR PLAN |
| Layout1 |
| CLC 2N - FIRST FLOOR PLAN |
| Layout1 |
Blank Page
File details come from the government source that posted it. Updated .