Attachment I - USCGA Fire Sprinkler Schedule revised.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
CG Academy fire sprinkler system service
Solicitation number
70Z08425RCGA00002
Issued by

About this file

This is a pricing template spreadsheet for fire sprinkler system inspection and testing services at the U.S. Coast Guard Academy. The template covers a base period (January 1, 2025 - July 31, 2025) and four option periods extending through July 31, 2029.

The pricing structure includes four main recurring service types: weekly inspections with fire pump runs, monthly inspections with backflow testing, quarterly inspections, and annual inspections with BPD test flow. Additionally, there are special 3-year and 5-year inspections scheduled during Option Periods Two and Four respectively. The template requires vendors to input unit prices and totals for each service type across all periods, with quantities varying from 30 weeks in the base period to 52 weeks in each option year for weekly services, 6 months to 12 months for monthly services, and consistent quarterly and annual service requirements throughout all periods.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period Instructions:

Fill in the boxes only for Unit Price, Total, Total Base Period, and Total Value (Base Period Plus Four (4) Option Periods).

Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.

BASE PERIOD: 1/01/2025 - 07/31/2025
CLINDescriptionQTYUNITUnit PriceTotal
0001Weekly Inspection, Testing All Systems (Fire Pump run)30WK
0002Monthly Inspection, Testing All Systems (Backflows)6MO
0003Quarterly Inspection, Testing All Systems1QR
0004Annual Inspection, Testing All Systems (BPD test flow)1+1 quarterlyYR
Total Base Period

Total Value (Base Period Plus Four (4) Option Periods)

Option Period One Instructions:

Fill in the boxes only for Unit Price and Total.

Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four

OPTION PERIOD ONE: 08/01/2025 - 7/31/2026
CLINDescriptionQTYUNITUnit PriceTotal
1001Weekly Inspection, Testing All Systems (Fire Pump run)52WK
1002Monthly Inspection, Testing All Systems (Backflows)12MO
1003Quarterly Inspection, Testing All Systems3QR
1004Annual Inspection, Testing All Systems (BPD test flow)1+1quarterlyYR

Total Option Period One

Option Period Two Instructions:

Fill in the boxes only for Unit Price, Total, and Total Option Period Two.

Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.

OPTION PERIOD TWO: 08/01/2026 - 07/31/2027
CLINDescriptionQTYUNITUnit PriceTotal
2001Weekly Inspection, Testing All Systems (Fire Pump run)52WK
2002Monthly Inspection, Testing All Systems (Backflows)12MO
2003Quarterly Inspection, Testing All Systems3QR
2004Annual Inspection, Testing All Systems (BPD test flow)1+1 quarterlyYR
20053 Year Inspection1YR

Total Option Period Two

Option Period Three Instructions:

Fill in the boxes only for Unit Price, Total, and Total Option Period Three.

Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.

OPTION PERIOD THREE: 08/01/2027 - 07/31/2028
CLINDescriptionQTYUNITUnit PriceTotal
3001Weekly Inspection, Testing All Systems (Fire Pump run)52WK
3002Monthly Inspection, Testing All Systems (Backflows)12MO
3003Quarterly Inspection, Testing All Systems3QR
3004Annual Inspection, Testing All Systems (BPD test flow)1+1 quarterlyYR

Total Option Period Three

Option Period Four Instructions:

Fill in the boxes only for Unit Price, Total, and Option Period Four Total.

Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.

OPTION PERIOD FOUR: 08/01/2028 - 07/31/2029
CLINDescriptionQTYUNITUnit PriceTotal
4001Weekly Inspection, Testing All Systems (Fire Pump run)52WK
4002Monthly Inspection, Testing All Systems (Backflows)12MO
4003Quarterly Inspection, Testing All Systems3QR
4004Annual Inspection, Testing All Systems (BPD test flow)1+1 quarterlyYR
40055 Year Inpsection1YR

Total Option Period Four

File details come from the government source that posted it. Updated .