70Z08425RCGA000020001_US.pdf
PDF 663 KB Posted
- Attached to
- CG Academy fire sprinkler system service
- Solicitation number
- 70Z08425RCGA00002
About this file
This is Standard Form 30 (SF30), which is used for amendments to solicitations and modifications to contracts. The document amends solicitation number 70Z08425RCGA00002 for fire sprinkler system maintenance services at the US Coast Guard Academy in New London, CT.
The amendment includes two new attachments: Attachment VI containing Questions and Answers related to the solicitation, and Attachment VII containing CG Academy Sprinkler Inspection Reports. The amendment does not indicate whether the due date for offers has been extended. Contractors must acknowledge receipt of this amendment prior to the proposal due date through one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each copy of their offer, or by separate letter/electronic communication referencing the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CG Academy Sprinkler Reports.pdf | ||
| 70Z08425RCGA00001 Questions and Answers.pdf | ||
| Attachment V - Past Performance Questionnaire.doc | DOC document | |
| Attachment II - Appendix C.pdf | ||
| Attachment IV Campus Map.jpg | JPG image | |
| Attachment I - USCGA Fire Sprinkler Schedule revised.xlsx | XLSX spreadsheet | |
| 70Z08425RCGA00002_0_US.pdf | ||
| Attachment III - Wage Determination 2015_4111_Rev28.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
70Z08425RCGA000020001
Summary of Changes
Section IV: List of Documents, Exhibits, and other Attachments
Amendment specific attachments:
File Attachments:
Title Description File Name Entity Reference
Attachment VI Questions and Answers 70Z08425RCGA00001 Questions and Answers.pdf
Header
Attachment VII Inspection Reports CG Academy Sprinkler Reports.pdf
Header
| Text52: |
| Text54: 1 |
| TOTAL_NO_OF_PAGES: 2 |
| CUST_PROJ_CODE: |
| DOCUMENT_NUMBER: 70Z08425RCGA000020001 |
| EFFECTIVE_DATE: 2024-12-16T12:50:41.000-05:00 |
| REF_PR_NUM_T: |
| SOL_DOCUMENT_NUMBER: 70Z08425RCGA00002 |
| SOL_OPEN_BID_DATE: 2024-12-16T12:02:27.000-05:00 |
| NO_OF_COPIES: 1 |
| Check Box91: Yes |
| Check Box92: Off |
| MANUAL_EXTEND_FLAG: N |
| Check Box95: Yes |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Off |
| Text1: AMENDMENT CONTROL NUMBER : |
| HDR_DOCUMENT_NUMBER: 70Z08425RCGA00002 |
| Text134: SUMMARY OF CHANGES : |
| AMENDMENT_DESCRIPTION: AMEND-1. The purpose of this amendment is to provide Questions and Answers and to provide inspection reports. |
| Text2: Same As Issuing Office |
| AMD_ISSUING_OFFICE_LADDR: |
| AMD_ISSUING_OFFICE_LOCCODE: |
File details come from the government source that posted it. Updated .