Attachment I Drawings.pdf
PDF 11 MB Posted
- Attached to
- Z1DA--Fire and Storage Room Doors Federal contract opportunity
- Solicitation number
- 36C24625B0009
About this file
This is a set of construction drawings detailing the upgrade and replacement of fire and storage room doors at Buildings 47 and 62 at the Charles George VA Medical Center in Asheville, NC. The drawings include floor plans, door schedules, frame details, and architectural symbols for a fully sprinklered facility.
The drawings specify various door and frame types, including hollow metal and solid core wood doors, with detailed remediation requirements for each door. Remediation work includes replacing doors, frames, hinges, and hardware; adjusting clearances; and ensuring proper fire ratings and closures. The documents contain ICRA (Infection Control Risk Assessment) requirements and phasing plans to minimize disruption to hospital operations. Construction sequencing notes indicate work must be coordinated with VA staff, with some doors requiring after-hours or weekend work. Asbestos notes indicate potential asbestos-containing materials in pipe insulation and joint compound that may require abatement if disturbed during construction.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
SITE MAPDESIGN TEAM
OWNER
ARCHITECT / CONTRACT PRIME
FIRE PROTECTION ENGINEER
Charles George VA Medical Center 1100 Tunnel Road Asheville, NC 28805 Contact: Dan Schweikert daniel.schweikert@va.gov Cell: (828) 298-0326 Office: (828) 298-7911 ext. 5625
Awen Solutions Group 4196 Merchant Plaza Woodbridge VA 22192 Contact: Benjamin Wurzer bwurzer@awensolutions.com
(405) 245-2456
Coffman Engineers, INC 8171 Maple Lawn Blvd. #320 Fulton, MD 20759 Contact: Mike Love michael.love@coffman.com (301)323-3599
Au to de sk
D oc s:
//A sh ev ille F ire D oo rs
/6
-2 3-
3.
.A
.A
SH
FD
.rv t 9/
/2
1:
:5
PM
00-GI001
COVER SHEET
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
09/23/2024
UPGRADE-REPLACE FIRE AND
STORAGE ROOM DOORS, BLDGS 47
AND 62
1100 TUNNEL ROAD, ASHEVILLE, NC 28805
637-23-103
09/23/2024
1100 TUNNEL ROAD, ASHEVILLE, NC 28805
100% CONSTRUCTION
DOCUMENTS
UPGRADE-REPLACE FIRE AND STORAGE ROOM
DOORS, BLDGS 47 AND 62
100% CONSTRUCTION DOCUMENTS
DRAWING NUMBER DRAWING TITLE
01-GENERAL
00-GI001 COVER SHEET
00-GI002 GENERAL NOTES & ARCHITECTURAL SYMBOLS
00-GI003 TYPICAL ADA REQUIREMENTS
00-GS001 CONSTRUCTION SEQUENCE PLAN
47-GS100 PHASING/ICRA PLAN - LEVEL 00
47-GS101 PHASING/ICRA PLAN - LEVEL 01
47-GS102 PHASING/ICRA PLAN - LEVEL 02
47-GS103 PHASING/ICRA PLAN - LEVEL 03
47-GS104 PHASING/ICRA PLAN - LEVEL 04
47-GS105 PHASING/ICRA PLAN - LEVEL 05
62-GS101 PHASING/ICRA PLAN - LEVEL 00 AND LEVEL 01
62-GS102 PHASING/ICRA PLAN - LEVEL 02
08-ARCHITECTURE
47-AE100 OVERALL FLOOR PLAN - LEVEL 00
47-AE101 OVERALL FLOOR PLAN - LEVEL 01
47-AE102 OVERALL FLOOR PLAN - LEVEL 02
47-AE103 OVERALL FLOOR PLAN - LEVEL 03
47-AE104 OVERALL FLOOR PLAN - LEVEL 04
47-AE105 OVERALL FLOOR PLAN - LEVEL 05
62-AE101 OVERALL FLOOR PLAN - LEVEL 00 AND LEVEL 01
62-AE102 OVERALL FLOOR PLAN - LEVEL 02
00-AE511 DOOR, FRAME & FRAMING DETAILS
00-AE512 FRAMING DETAILS
00-AE601 SCHEDULES
00-AE602 DOOR, FRAME & PARTITION TYPES
/62
Revisions: Date:
ARCHITECTURAL SYMBOLS
CENTER LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
HIDDEN FEATURES LINE
NEW CONSTRUCTION LINE
PROPERTY LINE
SMOKE BARRIER LINE (ABOVE CEILING)
BREAK, ROUND
BREAK, STRAIGHT
DETAIL INDICATOR
DETAIL/CALLOUT PLAN INDICATOR
DIMENSION LINE, CLEAR
DIMENSION LINE, CENTER OF STUD, UNO
DOOR OPENING/BROWED LIGHT INDICATOR
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
INTERIOR ELEVATION INDICATOR,
MULTIPLE VIEWS WHERE OCCURS
EXTERIOR ELEVATION INDICATOR,
MULTIPLE VIEWS WHERE OCCURS
BUILDING SECTION INDICATOR
GRAPHIC SCALE
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
OUT OF SCOPE AREA, REFER TO FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM
DRAWINGS FOR ADDITIONAL WORK INSIDE
THIS AREA
THERMAL BATT INSULATION
ACOUSTIC BATT INSULATION
S
D2
AE512
D2
AE512
6'-0"
DRAWING BLOCK TITLE
1/4"=1'-0"C4
D2
AE512
AE512
D2
AE512
5 10 15 20
CORRIDOR
C123
A
AA
PL
AN
N
O R
TH
FEC
CG
S
12 34 56.A1
6'-0"
AE5121
VIEW NUMBERING EXAMPLE
THE NUMBER OF THE MODULE WHICH
OCCURS IN THE LOWER LEFT CORNER OF A
SINGLE MODULE OR SEVERAL MODULES
GROUPED TOGETHER WILL DEFINE THE
FINAL VIEW NUMBER AS SHOWN IN THE
ILLUSTRATION TO THE LEFT. ALTHOUGH
THE MODULE NUMBERS OCCUR IN
CONSECUTIVE ORDER, NOT ALL NUMBERS
ARE NECESSARILY USED ON EACH SHEET.
VIEW NUMBERING LAYOUT
VIEWS ARE NUMBERED ACCORDING TO THEIR
LOCATION ON EACH SHEET AND ARE NOT
NUMBERED CONSECUTIVELY. EACH MODULE
MAINTAINS THE ALPHA-NUMERIC VALUE
ASSOCIATED WITH IT. THIS SYSTEM CAN BE
APPLIED TO ANY DRAWING THAT CONTAINS
MULTIPLE IMAGES. THE IMAGES ARE
NUMBERED ACCORDING TO THE MODULE
SYSTEM SHOWN ILLUSTRATED TO THE LEFT.
EACH VIEW MAY OCCUPY ONE OR MORE
WHOLE MODULES. THE VIEW MODULE IS
USED TO ESTABLISH THE IDENTIFYING LABEL
FOR EACH DETAIL NOT TO LIMIT THE SIZE OF
THE DETAIL
B1 B3 B5 B7
C5
D1 D5 D7
E1 E2 E3
F1 F2 F3 F5 F7
A1 A2 A3 A4 A5 A6 A7 A8 A9
B1 B2 B3 B4 B5 B6 B7 B8 B9
C1 C2 C3 C4 C5 C6 C7 C8 C9
D1 D2 D3 D4 D5 D6 D7 D8 D9
E1 E2 E3 E4 E5 E6 E7 E8 E9
F1 F2 F3 F4 F5 F6 F7 F8 F9
A10
B10
C10
D10
E10
F10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//A sh ev ille F ire D oo rs
/6
-2 3-
3.
.A
.A
SH
FD
.rv t 9/
/2
1:
:5
PM
00-GI002
GENERAL NOTES & ARCHITECTURAL
SYMBOLSAwen Solutions Group
4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
09/23/2024
UPGRADE-REPLACE FIRE AND
STORAGE ROOM DOORS, BLDGS
47 AND 62 47
1100 TUNNEL ROAD, ASHEVILLE, NC 28805
637-23-103100% CONSTRUCTION
DOCUMENTS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
GENERAL
THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED ON GI001,
SHEET INDEX.
MATERIAL QUANTITIES EXTRACTED BY THE GC FROM THE DESIGN-INTENT MODEL SHOULD BE
USED WITH CAUTION BECAUSE A DESIGN-INTENT MODEL IS NOT CREATED FOR THIS PURPOSE.
THE GC IS OBLIGATED TO DETERMINE, AND ASSUMES ALL RISK FOR, THE SUITABILITY OF THE
DESIGN-INTENT BIM FOR MATERIAL QUANTITY TAKEOFFS.
THE GC IS RESPONSIBLE TO ENSURE THAT EQUIPMENT AND SYSTEMS ARE INSTALLED
ACCORDING TO THE CONSTRUCTION COORDINATED MODEL LOCATIONS, WHICH HAVE BEEN
SIGNED OFF BY VA FACILITY MANAGEMENT PERSONNEL, AND ARE REFINED FROM THE AE
DESIGN COORDINATED MODEL LOCATIONS. ANY DEVIATIONS THAT IMPINGE ON SPACE
RESERVATIONS AS NOTED IN VA BIM STANDARDS MUST BE APPROVED BY VA IN WRITING.
THE COMPLETE SET OF DRAWINGS CONSIST OF ALL DRAWINGS LISTED BY THE “SHEET INDEX”.
THE WORK DESCRIBED IN ONE SHEET MAY BE REFERENCED AND MAY BE AFFECTED BY WORK
DESCRIBED ON ANOTHER SHEET.
IT SHALL BE THE CONTRACTOR ’S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES AND SUPPLIERS WITH REQUIREMENTS OF THE CONTRACT
DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE
AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE
CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT TRADE.
ALL PARTS OF THE WORK – INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC – SHALL
COMPLY WITH ALL APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND
LAWS OF ALL FEDERAL GOVERNMENT AUTHORITIES HAVING JURISDICTION OVER THE DESIGN,
CONSTRUCTION, AND OCCUPANCY OF THE PROJECT, WHETHER LISTED BY THE CONTRACT
DOCUMENTS OR NOT.
NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT WORK
CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR LAW.
IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY
REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE MORE
STRINGENT OR RESTRICTIVE REQUIREMENT:
THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE
REGULATORY REQUIREMENTS,
WHERE THE DRAWINGS AND SPECIFICATIONS PROVIDE MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS, THE CONTRACTOR SHALL COMPLY WITH THOSE
REQUIREMENTS. WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES,
CODES, REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT SET
FORTH BY THE DRAWINGS AND SPECIFICATION, THE CONTRACTOR SHALL COMPLY WITH ALL
SUCH MORE RESTRICTIVE REQUIREMENTS. ALTHOUGH SUCH REQUIREMENTS MAY NOT BE
ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.
APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED IN THE PROJECT
MANUAL ARE INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS “BASIS OF DESIGN”.
ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR
ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURERS
AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY THE
DRAWINGS IS THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY.
THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF
SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE “BASIS OF DESIGN” MAY VARY
FROM THAT SHOWN BY THE DRAWINGS.
THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU OF
THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY. HOWEVER, THE CONTRACTOR IS
RESPONSIBLE (AT NO ADDITIONAL EXPENSE TO THE OWNER) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME FUNCTIONAL
AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE “BASIS OF DESIGN” SHOWN BY THE
CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL NOT SCALE DRAWINGS, THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SHALL NOTIFY THE
OWNER’S REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS, AND
PROJECT MANUAL, INCLUDING THESE GENERAL NOTES. THE CONTRACTOR SHALL COORDINATE
THE INTENT OF THE GENERAL NOTES WITH ALL TRADES.
THE PROJECT MANUAL, BOUND SEPARATELY, IS A PART OF THE CONTRACT DOCUMENTS.
THE ORGANIZATION OF THE DRAWINGS AND PROJECT MANUAL SHALL NOT CONTROL THE
CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN ESTABLISHING THE
EXTENT OF WORK TO BE PERFORMED BY ANY TRADE.
CONSTRUCTION, WORKMANSHIP, AND MATERIALS SHALL CONFORM TO THE CURRENT VA
STANDARDS.
THE CONTRACTOR SHALL NOTIFY THE COR AND AOR WHERE A CONFLICT OR DISCREPANCY
OCCURS BETWEEN THE CONTRACT DOCUMENT AND ANY OTHER PORTION OF THE CONTRACT
DOCUMENTS, FIELD CONDITIONS OR WHERE ANY CONDITIONS ARISE NOT COVERED BY THESE
DOCUMENTS WHEREIN WORK WILL NOT COMPLY WITH THE REQUIREMENTS OF THE VA
STANDARDS.
THESE DRAWINGS INDICATE IN GENERAL THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN
INTENT. THE DRAWINGS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED
FOR FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS. AS INDICATED OR DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS
REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK.
ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING SAME, OR
THEIR EXACT MEANING, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.
COORDINATE WORK WITH COR, INCLUDING SCHEDULING TIME AND LOCATIONS FOR DELIVERIES, BUILDING ACCESS, USE OF BUILDING SERVICES AND FACILITIES, AND USE OF ELEVATORS.
MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS.
ARCHITECTURAL DRAWINGS MUST ALWAYS BE READ IN CONJUNCTION WITH ALL OTHER
RELEVANT SERVICES DRAWINGS AND CONTRACT DOCUMENTS. ANY DISCREPANCY BETWEEN
THESE DRAWINGS AND DOCUMENTS SHOULD BE REPORTED TO THE COR AND ARCHITECT FOR
CLARIFICATION AND VERIFICATION.
FOR AREAS WITHOUT SUSPENDED CEILING HAVING EXPOSED SLAB AND BEAMS, WALL FINISH
MATERIAL SHALL BE FROM FLOOR LEVEL TO BOTTOM OF SLAB LEVEL. (UNLESS NOTED
OTHERWISE)
NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT SYSTEMS AND MATERIALS ARE TO
BE REVIEWED, COORDINATED AND ARE TO BE APPLIED TO ALL RELATED DRAWINGS AND
DETAILS.
1.
2.
3.
4.
5.
1.
2.
3.
4.
FIRE PROTECTION
ALL OPENINGS AT WALLS SHALL BE SEALED OFF (FILLED) WITH NON-COMBUSTIBLE MATERIALS
TO MAINTAIN THE REQUIRED FIRE RATING CONTINUITY OF THE WALL CONSTRUCTION. ALL
HOLES, INCLUDING THOSE FOR MECHANICAL, AND ELECTRICAL FACILITIES WHICH ARE
LOCATED ON PARTITIONS AND WALLS MUST BE FILLED WITH NON-COMBUSTIBLE MATERIALS
TO PROVIDE REQUIRED FIRE RATING AND SHALL BE SEALED AGAINST PASSAGE OF SMOKE
AND FLAME.
A FINISH OR FIRE RATING INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH OF WALL
IS TO BE FINISHED OR FIRE RATED.
FIRE RATED ASSEMBLIES SHALL BE PER TABLE 721.1(1), GENERIC ASSEMBLIES OF GYPSUM
HANDBOOK, OR HAVE ICC APPROVAL.
PENETRATIONS OF FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES AND FIRE
RESISTANCE RATED WALLS SHALL COMPLY WITH SECTION 714 OF THE IBC.
MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED
PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED
ASSEMBLIES AND THE BOX DOES NOT EXCEED 1/8" UNLESS LISTED OTHERWISE.
METAL WORKS
ALL MILD STEEL WORKS SHOWN ON THE CONTRACT DRAWINGS/DETAILS SHALL BE PRIMED
AND SHALL BE PAINTED WITH TWO COATS OF EPOXY PAINT.
STEEL ELEMENTS NOT SHOWN IN THE CONTRACT DRAWINGS BUT ARE DEEMED NECESSARY
FOR THE SATISFACTORY COMPLETION OF THE WORKS SHALL BE GALVANIZED STEEL PRIMED
& PAINTED WITH TWO COATS OF EPOXY PAINT FOR ALL INTERIOR SITUATIONS AND STAINLESS
STEEL (#316) FOR ALL EXTERIOR SITUATIONS.
ALL WELDED STEEL JOINTS SHALL BE GROUND SMOOTH, PRIMED & PAINTED.
ALL WELDING SHALL BE OF SUITABLE TYPE TO STEEL WORKS. NO WELDING SHALL TAKE
PLACE INSIDE OF THE MEDICAL FACILITY.
GENERAL NOTES GENERAL NOTES DEMOLITION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
DEMOLITION
DEMOLITION IS INTENDED TO PREPARE THE BUILDING TO RECEIVE THE NEW WORK. THE
INFORMATION PROVIDED IN NO WAY INTENDS TO MEAN THAT DEMOLITION IS LIMITED ONLY TO THOSE ITEMS SPECIFICALLY IDENTIFIED. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY
TO EXECUTE DEMOLITION WORK AS REQUIRED TO ALLOW THE EXECUTION OF NEW WORK.
REMOVE ALL EXISTING ITEMS OF CONSTRUCTION AND EQUIPMENT WITHIN THE PROJECT
AREA, INDICATED ON DEMOLITION PLAN, WHETHER SHOWN OR NOT INCLUDING BUT NOT
LIMITED TO FLOOR MATERIAL, BASE, WALLS, CEILINGS, DOORS, DOOR FRAMES, CASEWORK,
ELECTRICAL, MECHANICAL, PLUMBING FIXTURES AND SYSTEM, AS REQUIRED TO
ACCOMMODATE NEW CONSTRUCTION. ANY EXISTING WORK TO REMAIN, IF DAMAGED BY ANY
TRADE OR NEW CONSTRUCTION, SHALL BE PATCHED, REPAIRED OR REPLACED TO MATCH
EXISTING. COMPLY WITH APPLICABLE CODES AND REGULATIONS.
REMOVE MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF
THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND
REINSTALLED.
REMOVE AND SALVAGE MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND
DELIVER THEM TO OWNER READY FOR REUSE.
REMOVE AND REINSTALL MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE
THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
EXISTING TO REMAIN MEANS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE
REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND
SALVAGED, OR REMOVED AND REINSTALLED.
SCHEDULE WORK TO MINIMIZE DISRUPTION OF SERVICES. COORDINATE WORK SCHEDULE
WITH THE CONTRACTING OFFICERS REPRESENTATIVE.
COORDINATE WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES
TO THE CONTRACTING OFFICER REPRESENTATIVE.
THE DEMOLITION DRAWINGS ARE CONSIDERED SCHEMATIC. CONTRACTOR RESPONSIBLE FOR
FIELD VERIFYING EXISTING DEMOLITION WORK PRIOR TO SUBMISSION PROPOSAL.
ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN
AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO
DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING
ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES. VA TO APPROVE
BARRIER LOCATIONS; BARRIERS TO BE CONSTRUCTED AS INDICATED.
DURING DEMOLITION, PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS
TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATCH
AND REPAIR TO MATCH EXISTING ADJACENT FINISHES. SUBSTANTIAL DAMAGES TO BE
REPORTED TO THE VA COR.
ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
ALL FINISHES INDICATED TO BE DEMOLISHED SHALL BE REMOVED IN THEIR ENTIRETY
INCLUDING RELATED COMPONENTS.
ALL DEMOLISHED ITEMS ARE TO BE REMOVED IN THEIR ENTIRETY INCLUDING ALL ASSOCIATED
PIPING, WIRING, HANGERS, SUPPORTS, PROJECTIONS BOLTS NAILS, ETC. FROM EXISTING
SURFACES. PATCH ALL HOLES TO MATCH ADJACENT SURFACES.
ALL STRUCTURAL INTERFERENCE OR STRUCTURAL WALLS, BEAMS, JOIST COLUMNS, ETC.
SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT FOR DECISION. NO FLOOR OR
STRUCTURAL MEMBERS SHALL BE CUT WITHOUT PERMISSION OF A REGISTERED STRUCTURAL
ENGINEER. ALL PROPOSED SLEEVE / CORING SHALL BE REVIEWED BY ARCHITECT.
ALL EXISTING WALLS TO RECEIVE NEW FINISHES SHALL HAVE EXISTING FINISHES, INCLUDING
CERAMIC TILE, VINYL WALL COVERING, ETC. COMPLETELY REMOVED UNLESS NOTED
OTHERWISE. REMOVE COMPLETELY ALL EXISTING WALL BASE AND ADHESIVE AS REQUIRED
FOR NEW WALL BASE. LEAVE WALL SURFACE SMOOTH TO RECEIVE NEW FINISH.
ANY FLOOR PENETRATIONS LEFT DUE TO REMOVAL OF PIPING OR CONDUIT SHALL BE FILLED
WITH AN U.L. APPROVED FIRE STOP MATERIAL.
DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR
LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.
DO NOT CUT AND PATCH OPERATING ELEMENTS AND RELATED COMPONENTS IN A MANNER
THAT RESULTS IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED OR THAT RESULT IN
INCREASED MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY. THESE INCLUDE
BUT ARE NOT LIMITED TO, PRIMARY OPERATIONAL SYSTEMS AND EQUIPMENT, AIR OR SMOKE
BARRIERS, FIRE-SUPPRESSION SYSTEMS, MECHANICAL SYSTEMS PIPING AND DUCTS,
CONTROL SYSTEMS, COMMUNICATION SYSTEMS, CONVEYING SYSTEMS, ELECTRICAL WIRING
SYSTEMS.
DO NOT CUT AND PATCH MISCELLANEOUS ELEMENTS OR RELATED COMPONENTS IN A
MANNER THAT COULD CHANGE THEIR LOAD-CARRYING CAPACITY, THAT RESULTS IN
REDUCING THEIR CAPACITY TO PERFORM AS INTENDED, OR THAT RESULT IN INCREASED
MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY. THESE INCLUDE BUT ARE NOT
LIMITED TO, WATER, MOISTURE, OR VAPOR BARRIERS, MEMBRANES AND FLASHINGS,
EXTERIOR WALL CONSTRUCTION, EQUIPMENT SUPPORTS, PIPING, DUCTWORK, VESSELS, AND
EQUIPMENT, NOISE- AND VIBRATION-CONTROL ELEMENTS AND SYSTEMS.
DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF
CUTTING AND PATCHING. DO NOT CUT AND PATCH CONSTRUCTION EXPOSED ON THE
EXTERIOR OR IN OCCUPIED SPACES IN A MANNER THAT WOULD, IN ARCHITECT'S OPINION,
REDUCE THE BUILDING'S AESTHETIC QUALITIES.
BEFORE PROCEEDING, MEET AT PROJECT SITE WITH PARTIES INVOLVED IN CUTTING AND
PATCHING, INCLUDING MECHANICAL AND ELECTRICAL TRADES. REVIEW AREAS OF POTENTIAL
INTERFERENCE AND CONFLICT. COORDINATE PROCEDURES AND RESOLVE POTENTIAL
CONFLICTS BEFORE PROCEEDING.
USE MATERIALS IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED SURFACES, USE
MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT SURFACES TO THE FULLEST EXTENT
POSSIBLE. IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS
THAT, WHEN INSTALLED, WILL MATCH THE VISUAL AND FUNCTIONAL PERFORMANCE OF IN-
PLACE MATERIALS.
EXAMINE SURFACES TO BE CUT AND PATCHED AND CONDITIONS UNDER WHICH CUTTING AND
PATCHING ARE TO BE PERFORMED. BEFORE PATCHING, VERIFY COMPATIBILITY WITH AND
SUITABILITY OF SUBSTRATES, INCLUDING COMPATIBILITY WITH IN-PLACE FINISHES OR
PRIMERS. PROCEED WITH INSTALLATION ONLY AFTER UNSAFE OR UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED.
PROVIDE TEMPORARY SUPPORT OF WORK TO BE CUT.
PROTECT IN-PLACE CONSTRUCTION DURING CUTTING AND PATCHING TO PREVENT DAMAGE.
PROVIDE PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS OF PROJECT
THAT MIGHT BE EXPOSED DURING CUTTING AND PATCHING OPERATIONS.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
AVOID INTERFERENCE WITH USE OF ADJOINING AREAS OR INTERRUPTION OF FREE PASSAGE
TO ADJOINING AREAS.
WHERE EXISTING SERVICES/SYSTEMS ARE REQUIRED TO BE REMOVED, RELOCATED, OR
ABANDONED, BYPASS SUCH SERVICES/SYSTEMS BEFORE CUTTING TO PREVENT
INTERRUPTION TO OCCUPIED AREAS.
EMPLOY SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH CUTTING
AND PATCHING AT THE EARLIEST FEASIBLE TIME, AND COMPLETE WITHOUT DELAY. CUT IN-
PLACE CONSTRUCTION TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR
PERFORMANCE OF OTHER CONSTRUCTION, AND SUBSEQUENTLY PATCH AS REQUIRED TO
RESTORE SURFACES TO THEIR ORIGINAL CONDITION.
CUT IN-PLACE CONSTRUCTION BY SAWING, DRILLING, BREAKING, CHIPPING, GRINDING, AND
SIMILAR OPERATIONS, INCLUDING EXCAVATION, USING METHODS LEAST LIKELY TO DAMAGE
ELEMENTS RETAINED OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW PROPOSED
PROCEDURES WITH ORIGINAL INSTALLER; COMPLY WITH ORIGINAL INSTALLER'S WRITTEN
RECOMMENDATIONS.
IN GENERAL, USE HAND OR SMALL POWER TOOLS DESIGNED FOR SAWING AND GRINDING,
NOT HAMMERING AND CHOPPING. CUT HOLES AND SLOTS AS SMALL AS POSSIBLE, NEATLY
TO SIZE REQUIRED, AND WITH MINIMUM DISTURBANCE OF ADJACENT SURFACES.
TEMPORARILY COVER OPENINGS WHEN NOT IN USE.
CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES.
CUT CONCRETE OR MASONRY USING A CUTTING MACHINE, SUCH AS AN ABRASIVE SAW OR
A DIAMOND-CORE DRILL.
CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE REMOVED. CAP, VALVE, OR
PLUG AND SEAL REMAINING PORTION OF PIPE OR CONDUIT TO PREVENT ENTRANCE OF
MOISTURE OR OTHER FOREIGN MATTER AFTER CUTTING. PROCEED WITH PATCHING AFTER
CONSTRUCTION OPERATIONS REQUIRING CUTTING ARE COMPLETE.
PATCH CONSTRUCTION BY FILLING, REPAIRING, REFINISHING, CLOSING UP, AND SIMILAR
OPERATIONS FOLLOWING PERFORMANCE OF OTHER WORK. PATCH WITH DURABLE SEAMS
THAT ARE AS INVISIBLE AS POSSIBLE.
RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND FINISH RESTORATION INTO
RETAINED ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF
PATCHING AND REFINISHING.
CLEAN PIPING, CONDUIT, AND SIMILAR FEATURES BEFORE APPLYING PAINT OR OTHER
FINISHING MATERIALS. RESTORE DAMAGED PIPE COVERING TO ITS ORIGINAL CONDITION.
WHERE WALLS OR PARTITIONS THAT ARE REMOVED EXTEND ONE FINISHED AREA INTO
ANOTHER, PATCH AND REPAIR FLOOR AND WALL SURFACES IN THE NEW SPACE.
PROVIDE AN EVEN SURFACE OF UNIFORM FINISH, COLOR, TEXTURE, AND APPEARANCE.
REMOVE IN-PLACE FLOOR AND WALL COVERINGS AND REPLACE WITH NEW MATERIALS,
IF NECESSARY, TO ACHIEVE UNIFORM COLOR AND APPEARANCE. WHERE PATCHING
OCCURS IN A PAINTED SURFACE, APPLY PRIMER AND INTERMEDIATE PAINT COATS OVER
THE PATCH AND APPLY FINAL PAINT COAT OVER.
PROTECT ADJACENT SURFACES; FOR EXAMPLE, BUT NOT LIMITED TO, SILLS, JAMBS AND
HEAD FRAMES AT WINDOWS AND DOORS TO NAME A FEW.
REMOVAL OF FIRE ALARM, FIRE SUPPRESSION, PLUMBING, MECHANICAL, ELECTRICAL,
TELECOMMUNICATION, AND SECURITY SYSTEM SHOULD BE LIMITED TO WHAT IS NECESSARY
FOR SAFE REMOVAL OF THE INDICATED WALL OR CEILING. APPROPRIATE LIGHT FIXTURES
SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING LEVELS FOR
CONSTRUCTION.
CONTRACTOR SHALL DEMOLISH ALL FIXTURES, CEILINGS, MECHANICAL, PLUMBING, AND
ELECTRICAL AS REQUIRED TO COMPLETE THE SCOPE OF WORK OUTLINED WITHIN THE
CONSTRUCTION DOCUMENTS.
VIEW NUMBERING SCHEME
DEMOLITION NOTES
PULL SIDE
PUSH SIDE
PROVIDE THIS ADDITIONAL
CLEARANCE IF DOOR IS
EQUIPPED WITH BOTH A LATCH
AND A CLOSER.
CLEAR @ EXTERIOR DOORS
CLEAR @ INTERIOR DOORS
" M
IN
" M
IN
18" MIN.
24" MIN.
12" MIN.
CLEAR @ EXTERIOR DOORS
CLEAR @ INTERIOR DOORS
PULL SIDE
"X" - WHEN 'X' = 8" OR GREATER,
PROVIDE CLEAR FLOOR SPACE
AT STRIKE SIDE.
PULL SIDE
"X" - WHEN 'X' IS LESS THAN 8",
WALL JOG IS ALLOWED WITHIN
STRIKE SIDE CLEARANCES
18" MIN.
24" MIN.
"X
"X
" M
IN
PROVIDE MINIMUM CLEARANCE
AT STRIKE SIDE IF DOOR IS
EQUIPPED WITH BOTH A LATCH
AND A CLOSER.
MI
N.12
MI
N.12
48" MIN.
" M
IN
" M
IN
48" MIN.
48" MIN.
" M
IN
" M
IN
PUSH SIDE
PULL SIDE
*48" MINIMUM IF DOOR HAS BOTH A
LATCH AND A CLOSER.
36" MIN.
54" MIN.
" M
IN
" M
IN
MIN.
22"
*48" MINIMUM IF DOOR HAS BOTH A LATCH AND A CLOSER.
PUSH SIDE
PULL SIDE
" M
IN
" M
IN
24" MIN.
MINIMUM WIDTH FOR ROUTES
OVER 200' WITHOUT PASSING
SPACES
MINIMUM WIDTH FOR
ROUTES UNDER 200'
WITHOUT PASSING SPACES
60" MIN. 44" MIN.
PASSING ALCOVE
PASSING ALCOVE
60"X60" PASSING ALCOVES PROVIDED WHEN
ACCESSIBLE ROUTES OVER 200' IN LENGTH ARE
LESS THAN 60" MINIMUM PASSING WIDTH
(OR AN INTERSECTION OF TWO WALKING
SURFACES PROVIDING AN ACCESSIBLE T-
SHAPED SPACE WHERE THE BASE AND ARMS OF
THE T-SHAPED SPACE EXTEND 48" MINIMUM
BEYOND THE INTERSECTION)
OCC. LOAD OF 10 OR MORE
44" MIN.
60" MIN.
OCC. LOAD OF 10 OR MORE
44" MIN.
" M
IN
NO
T T
O
EX
CE
ED
0'
"T" INTERSECTING ROUTES PROVIDED
WHEN CORRIDORS OVER 200' IN LENGTH
ARE LESS THAN 60" MINIMUM CORRIDOR
WIDTH. (INTERSECTION MUST EXTEND
MINIMAL 48" IN ANY DIRECTION)
T-SHAPED
CORRIDOR
INTERSECTION
T-SHAPED
CORRIDOR
INTERSECTION
44" MIN.
" M
IN
NO
T T
O
EX
CE
ED
0'
" M
IN
44" MIN.
44" MIN.
36"
24"
TY
P.12
*WHEN 'X' IS GREATER THAN 24", PROVIDE ADDITIONAL
CLEAR MANEUVERING SPACE AS SHOWN
FRONT APPROACH
SIDE APPROACH *WHEN 'X' IS GREATER THAN 15", PROVIDE ADDITIONAL
CLEAR MANEUVERING SPACE AS SHOWN
30" *
" "X >2
4"
" "X
<2 4"
48" *
"X >2
4"
"X <2
4"
36"
60"
*MINIMUM CLEARANCES FOR SINGLE
WHEELCHAIR ACCESS. VERIFY
CORRIDOR WIDTHS WITH
OCCUPANCY REQUIREMENTS
12" MIN. 36" MIN.* 12" MIN.
" M
IN
.* 60
" M
IN
24" MAX.
" M
IN
" M
IN
POINT
CONTINUOUS
ACCESSIBLE PATH OF TRAVEL
FRONT APPROACH SEATING SIDE APPROACH SEATING
36" MIN.
MIN.
60"
WHERE TWO ADJACENT WHEELCHAIR SPACES ARE PROVIDED, EACH WHEELCHAIR SPACE SHALL BE 33" WIDE MINIMUM
MI
N.36
ACCESSIBLE PATH OF TRAVEL
FRONT APPROACH SIDE APPROACH
" M
IN
30" MIN.
48" MIN. 19" MIN.
" M
IN
60" MIN.
ACCESSIBLE PATH OF TRAVEL
WING WALL
DOWN TO FLOOR
PROTRUDING OBJECTS
HANGING ON WALL W/ LEADING EDGE ABOVE 27"
(MUST BE PROTECTED WITH CANE DETECTION)
4" M
AX
CL
EA
R
" M
IN
24" MAX. ANY DIMENSION CL
EA
R
" M
IN
OBJECTS WITH LEADING EDGES MORE THAN 27" AND NOT MORE THAN 80" ABOVE
THE FINISH FLOOR OR GROUND SHALL PROTRUDE 4" MAXIMUM HORIZONTALLY
INTO THE CIRCULATION PATH
THE CLEAR WIDTH SHALL BE PERMITTED TO BE
REDUCED TO 32" MINIMUM FOR A LENGTH OF 24"
MAXIMUM PROVIDED THAT THE REDUCED WIDTH
SEGMENTS ARE SEPARATED BY SEGMENTS THAT
ARE 48" LONG MINIMUM AND 36" WIDE MINIMUM
FRONT SIDE
" M
IN
36" MIN.
FRONT SIDE
" M
IN
3/8" = 1'-0"B7
ACCESSIBLE CLEARANCE AT DOOR -
FRONT APPROACH
3/8" = 1'-0"C7 ACCESSIBLE CLEARANCE AT DOOR IN ALCOVE
3/8" = 1'-0"E7
ACCESSIBLE CLEARANCES AT DOOR -
OUTSWINGING DOORS AT VESTIBULE
3/8" = 1'-0"F1
ACCESSIBLE CLEARANCES AT DOOR -
INSWING OUTSWING AT VESTIBULE
3/8" = 1'-0"B5
ACCESSIBLE CLEARANCES AT DOOR -
INSWINGING DOORS AT VESTIBULE
3/8" = 1'-0"C5
ACCESSIBLE CLEARANCE AT DOOR -
HINGE APPROACH
3/8" = 1'-0"E5
ACCESSIBLE CLEARANCE AT DOOR -
LATCH APPROACH
3/8" = 1'-0"E9 ACCESSIBLE ROUTES - MINIMUM WIDTHS
3/8" = 1'-0"B3 ACCESSIBLE ROUTES WITH PASSING ALCOVES
3/8" = 1'-0"C3
ACCESSIBLE ROUTES WITH
T-INTERSECTIONS FOR PASSING
3/8" = 1'-0"E3 ACCESSIBLE ALCOVE CLEARANCES
3/8" = 1'-0"C9
ACCESSIBLE ROUTES - MINIMUM
WHEELCHAIR CLEARANCES
3/8" = 1'-0"B1
WHEELCHAIR SPACES AT SEATING AND
DESIGNATED AISLE SEATS
3/8" = 1'-0"C1
DINING SURFACES AND WORK
SURFACES TO PATH OF TRAVEL
3/8" = 1'-0"E1 CLEAR WIDTH FOR ACCESSIBLE ROUTES
3/8" = 1'-0"B9
ACCESSIBLE CLEARANCE AT SLIDING
DOOR - FRONT APPROACH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//A sh ev ille F ire D oo rs
/6
-2 3-
3.
.A
.A
SH
FD
.rv t 9/
/2
1:
:5
PM
00-GI003
TYPICAL ADA REQUIREMENTS
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
09/23/2024
UPGRADE-REPLACE FIRE AND
STORAGE ROOM DOORS, BLDGS
47 AND 62 47
1100 TUNNEL ROAD, ASHEVILLE, NC 28805
637-23-103
SUGGESTED CONSTRUCTION
STAGING AREA
TUNNEL ROAD
1.
2.
3.
A.
B.
A.
a.
b.
c.
d.
ALL CONSTRUCTION SEQUENCING SHALL BE COORDINATED WITH THE VA FOR WORK RELATED
TIMES FOR DAY, NIGHT AND WEEKEND WORK. CONTRACTOR SHALL COORDINATE WITH VA AHJ
FOR CODE AND LIFE SAFETY RELATED MEASURES ASSOCIATED WITH PHASING OF DEMOLITION
AND CONSTRUCTION WORK TO MAINTAIN LIFE SAFETY MEASURES.
THE FOLLOWING CONSTRUCTION SEQUENCING DESCRIPTION HAS BEEN INCORPORATED INTO
THE PROPOSED CONSTRUCTION SCHEDULE AND PHASING FOR USE IN PREPARING THE
CONSTRUCTION COST ESTIMATE. THE SEQUENCING HAS BEEN ORGANIZED BY BUILDING WITH
THE ASSUMPTION THAT THE WORK IN THE FOLLOWING CATEGORIES MAY BE COMPLETED IN
PARALLEL AND ARE PRESENTED IN NUMERICAL ORDER AND NOT IN ORDER OF NEED. SEE
PHASING/ICRA PLANS FOR ADDITIONAL INFORMATION.
THE WORK TASKS AND PROPOSED ORDER OF PRIORITY HAVE BEEN ORGANIZED AS FOLLOWS:
COORDINATE SCHEDULING AND HOURS OF WORK WITH FACILITIES AND OIT PERSONNEL.
SOME WORK MAY NEED TO BE PERFORMED AFTER NORMAL WORKING HOURS AND/OR ON
WEEKENDS. PROVIDE 14 CALENDAR DAYS ADVANCE NOTICE WHENEVER POSSIBLE.
CONTRACTOR SHALL DO NO MORE THAN ONE DOOR AT A TIME PER DEPARTMENT/UNIT
UNLESS APPROVAL IS PROVIDED FROM VA. CONTRACTOR SHALL DO NO MORE THAN ONE
DOOR NOTED ON THE PLANS AS REQUIRING WORK AFTER HOURS OR WEEKENDS AT ONE TIME
UNLESS APPROVAL IS PROVIDED FROM VA.
5. FIRE/SMOKE DOORS - TYPICAL PHASING:
ROOM THAT WILL REMAIN IN USE:
IF WALLS CONTAINING LEAD PAINT OR ASBESTOS CONTAINING MATERIAL IS INDICATED,
REFER TO FLOOR PLANS AND SPECIFICATION SECTIONS 02 82 11 FOR LOCATION AND
PROCEDURES.
REFERENCE DRAWINGS FOR EXTENTS OF ARCHITECTURAL WORK PER EACH DOOR. IT IS
ANTICIPATED THAT SOME OF THIS WORK CAN BE DONE DURING NORMAL BUSINESS
HOURS, BUT CONTRACTOR NEEDS TO COORDINATE WITH VA COR FOR SCHEDULING.
WORK WILL NEED TO BE COORDINATED WITH VA FOR ROOMS THAT CAN BE DONE DURING
NORMAL AND NIGHT HOURS.
NEW POWER TO BE INSTALLED FROM EXISTING PANEL TO ANY DOORS REQUIRING POWER.
COORDINATE INSTALLATION WITH VA COR DUE TO POSSIBLE DOWNTIME OF VA END
USERS. THIS WORK IS ANTICIPATED TO OCCUR AT NIGHTS OR OVER THE WEEKENDS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
ALL CONTRACTORS, CONSTRUCTION WORKS, AND COR SHALL ATTEND THE INFECTION
PREVENTION TRAINING, BIANNUALLY AND CANNOT BE ON SITE WITHOUT A CURRENT VA
HOSPITAL ISSUED SECURITY-SAFETY BADGE.
THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ALL PRE-CONSTRUCTION
MEETINGS.
THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ALL WASTE SHUT-OFF OR
INTERRUPTIONS.
THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED IF THE HVAC SYSTEM IS
INTERRUPTED IN AREAS THAT AFFECTS PATIENT CARE.
THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ANY OF ANY ANTICIPATED
ALTERATIONS TO THE ACCESS ROUTES USED DURING CONSTRUCTION ACTIVITIES.
INFECTION CONTROL RISK ASSESSMENT (ICRA) SHALL BE WRITTEN AND AMENDED INTO THE
CONTRACT AND SPECIFICATIONS FOR THE CONSTRUCTION PROJECT TO PREVENT COST
DISCREPANCIES.
GENERAL CONTRACTOR SHALL CLEAN THE WHEELS AND OUTSIDE OF ALL CARTS AND
EQUIPMENT GOING IN AND OUT OF THE CONSTRUCTION AREA.
GENERAL CONTRACTOR SHALL WET MOP HEAVY TRAFFIC AREAS AT LEAST TWO (2) TIMES A
DAY OR MORE IF THE SITE HAS AN IRCA CLASS OF 3 OR 4, OR IF THE AREA HAS A HIGH VOLUME
OF DUST. WATER SHALL BE CHANGED DAILY. DO NOT LEAVE WATER STANDING OVERNIGHT.
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.11 PERSONAL PROTECTIVE
EQUIPMENT (PPE) IN REGARDS TO PPE REQUIREMENTS.
ALL ICRA CLASS 4 PROJECT SITES MUST HAVE AN ANTE ROOM TO MAINTAIN NEGATIVE AIR
FLOW AND BE LARGE ENOUGH TO REMOVE COVERALLS AND HAVE A TRASH CONTAINER.
AIR FILTRATION DEVICES WITH HEPA FILTERS SHALL BE USED ON SITE FOR SMALL CLEAN UPS
IN PATIENT CARE AREAS THAT HAVE AN ICRA CLASS OF 2-4.
ALL BUILDINGS WILL REMAIN OPERATIONAL 24 HOURS A DAY, 7 DAYS A WEEK. THE
CONTRACTOR SHALL ENSURE THAT A PATH OF TRAVEL BETWEEN BUILDINGS IS MAINTAINED
AT ALL TIMES.
BEFORE STARTING CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE A COMPLETE ACCESS
PATH / ROUTE FROM THE PROPOSED CONSTRUCTION STAGING AREA ON SITE TO THE AREA
OF WORK WITHIN EACH BUILDING.
THE CONTRACTOR MAY USE ELEVATORS BE-1 AND BE-2 AND STAIRS TO TRANSPORT
EQUIPMENT AND MATERIALS INTO AND OUT OF THE WORK AREA.
UPON COMPLETION OF WORK, REMOVE BARRIERS CAREFULLY TO MINIMIZE SPREAD OF DIRT
AND DEBRIS ASSOCIATED WITH THE CONSTRUCTION. DO NOT REMOVE FINAL CONSTRUCTION
BARRIERS UNTIL COMPLETED PROJECT IS INSPECTED AND APPROVED BY THE COR.
THE WORK AREAS ARE TO BE KEPT CLEAN, CLEAR AND FREE OF DEBRIS. CONSTRUCTION
MATERIALS AND PARTIALLY INSTALLED WORK CANNOT INTERFERE WITH THE FACILITY
OPERATIONS OR CREATE A SAFETY HAZARD.
COMPLETE ALL CRITICAL CONSTRUCTION BARRIERS BEFORE DEMOLITION / CONSTRUCTION
WORK BEGINS. COR AND INFECTION CONTROL DEPARTMENT SHALL INSPECT INFECTION
CONTROL BARRIERS BEFORE DEMOLITION BEGINS .
SEAL ALL EXISTING UNUSED DOORS TO PREVENT THE GENERAL PUBLIC FROM ENTERING THE
DEMOLITION /CONSTRUCTION AREAS.
IF EXISTING LIFE SAFETY SYSTEM IS SHUT OFF FOR CONSTRUCTION, THE CONTRACTOR IS TO
PROVIDE A 24 HOUR FIRE WATCH UNTIL THE SYSTEM IS BACK ON LINE.
REFER TO SECTION 1.12 INFECTION CONTROL OF SPEC 01 35 26 SAFETY REQUIREMENTS FOR
ADDITIONAL DETAILS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//A sh ev ille F ire D oo rs
/6
-2 3-
3.
.A
.A
SH
FD
.rv t 9/
/2
1:
:0
PM
00-GS001
CONSTRUCTION SEQUENCE PLAN
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
09/23/2024
UPGRADE-REPLACE FIRE AND
STORAGE ROOM DOORS, BLDGS
47 AND 62 47
1100 TUNNEL ROAD, ASHEVILLE, NC 28805
637-23-103100% CONSTRUCTION
DOCUMENTS
1" = 100'-0"F1 CONSTRUCTION SEQUENCE PLAN
SEQUENCING NOTES
INFECTION CONTROL NOTES
CONSTRUCTION SAFETY NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
A.
B.
C.
D.
CONSTRUCTION BARRIER SHALL CONSIST OF: 1-HOUR RATED GYPSUM BOARD PARTITION FROM
FLOOR TO DECK, OR, PROVIDE TEMPORARY SMOKE DETECTORS AT PERIMETER AS NEEDED ALONG WITH 1-HOUR RATED GYPSUM BOARD PARTITION FROM FLOOR UP TO JUNIOR BEAMS AND BOTTOM CHORD FOR TRUSSES AND FIRE RATED POLY BARRIER FROM JUNIOR BEAMS UP TO UNDERSIDE OF DECK ABOVE. ALL PENETRATIONS THROUGH THE DUST BARRIER SHALL BE TAPED AND SEALED SO AS TO MAINTAIN A NEGATIVE AIR PRESSURE IN THE WORK AREA.. DUST BARRIER WALLS EXTENDING PERPENDICULAR TO A CORRIDOR SHALL BE BUILT AT A 45 DEGREE ANGLE IN REFERENCE TO THE
CORRIDOR PATH OF EGRESS. BARRIERS SHALL BE WIPED DOWN BEFORE BEING REMOVED.
DIRECTIONAL SIGNS AND TEMPORARY FIRE EXIT SIGNS SHALL BE POSTED DURING ALL PHASES OF CONSTRUCTION TO DISPLAY MEANS OF EGRESS AND LIFE SAFETY INFORMATION. SIGNS SHALL BE IN
PLACE AT ALL TIMES THROUGH DURATION OF CONSTRUCTION.
ILLUMINATED EXIT SIGNS SHALL BE RELOCATED WHEN OBSTRUCTED BY CONSTRUCTION.
GENERAL CONTRACTOR SHALL WORK CLOSELY WITH THE CONTRACTING OFFICER TECHNICAL
REPRESENTATIVE (COR) WHEN LIFE SAFETY HAZARDS ARE PRESENT. THE COR SHALL COMMUNICATE
ALL SAFETY CONCERNS TO THE SAFETY OFFICE.
GENERAL CONTRACTOR SHALL KEEP DUST CONTAINMENT BARRIER PRESSURE AT NEGATIVE AT ALL
TIMES. HVAC EXHAUST, RETURN AND SUPPLY DUCTS SHALL BE COVERED AND SEALED DURING
DEMOLITION AND POSSIBLY DURING CONSTRUCTION.
GENERAL CONTRACTOR SHALL CONTINUOUSLY MEASURE CONSTRUCTION DUST CONTAINMENT
BARRIER PRESSURE AND KEEP RECORD LOG OF MEASUREMENTS. GENERAL CONTRACTOR SHALL
REPORT READINGS AND PROVIDE RECORD LOG TO THE SAFETY OFFICE AND DESIGN OFFICE AT
INTERVALS DETERMINED BY THE COR.
GENERAL CONTRACTOR SHALL INSPECT THE INTEGRITY OF THE DUST CONTAINMENT BARRIER AND SHALL REPAIR AS REQUIRED. DUST CONTAINMENT BARRIER INTEGRITY SHALL BE MAINTAINED FROM
FINISH FLOOR UP THROUGH THE INTERSTITIAL SPACE TO THE UPPER DECKING FOR THE
CONSTRUCTION FLOOR.
WORK SITE SHALL BE SECURED BY LOCK WHEN NO CONSTRUCTION PERSONNEL ARE PRESENT AT
THE WORK AREA.
FLOOR MATS AND STICKY MATS SHALL BE LOCATED AT THE ENTRANCE TO THE CONSTRUCTION AREA
AND BE REPLACED WHEN THEY ARE APPROXIMATELY 75-PERCENT USED.
GOOD HOUSEKEEPING, TRASH AND DEBRIS SHALL BE PROMPTLY REMOVE, AT LEAST ONCE A DAY.
HAZARDOUS MATERIALS SHALL BE STORED APPROPRIATELY.
ALL MATERIALS SAFETY AND DATA SHEETS (MSDS) SHALL BE POSTED AT THE CONSTRUCTION AREA.
INFECTION CONTROL RISK ASSESSMENT (ICRA) SHALL BE POST AT THE CONSTRUCTION AREA.
SMOKING, MUSIC, AND PROFANITY REGULATIONS SHALL BE FOLLOWED.
FIRE EXTINGUISHERS SHALL BE READILY AVAILABLE AND CURRENTLY INSPECTED IN THE
CONSTRUCTION AREA.
HOT WORK PERMITS SHALL BE ISSUED WHEN NECESSARY.
SUB-CONTRACTORS SHALL BE AWARE OF AND TRAINED IN SAFETY AND ENVIRONMENTAL ISSUES.
EXTENSION CORDS SHALL BE PROTECTED AND DISCONNECTED AT THE END OF EACH DAY.
MEANS OF EGRESS SHALL BE CLEARLY DESIGNATED IN BOTH CONSTRUCTION AND ADJACENT AREAS.
ACCESS FOR THE FIRE DEPARTMENT AND EMERGENCY SERVICES SHALL BE CLEAR. STATUS OF THE
FIRE DETECTION AND SPRINKLER SHALL BE:
FIRE SPRINKLER SYSTEM IS ACTIVE
FIRE ALARM SYSTEM IS ACTIVE
SMOKE DETECTORS ARE ACTIVE
TEMPORARY SYSTEMS ARE IN PLACE
EXIT TRAVEL DIST. (47-011F)
119' - 9"
5' - 0"
EXIT TRAVEL DIST. (47-022F)
46' - 10"
42' - 6"
26' - 4"
EX
IT
T
RA
VE
L
DI
ST
-0 F)
47-010F
47-005F
47-006F
47-007F
47-014F
47-026F
47-022F
47-021F
47-019F
47-017F
47-020F
47-018F
47-013F
47-016F
47-015F
47-012F
47-025F47-024F
47-011F
47-002H
47-003H
47-004F 47-009F47-008F
ELECTRICAL
BA007
ELEVATOR MACHINE RM
BA006
ELEV
H1600
ELEV.
H1601
ELEV
SIGNAL
BA008
CORRIDOR
BA001
CORRIDOR
BA003
CORRIDOR
BA
RETAIL STORE
BA010
CORRIDOR
BA037
STORAGE
BA021
OFFICE
BA020
EQUIP'T/ STORAGE
BA021A
CORRIDOR
BA005
LAB & PATH
BA038
WORK AREA
LAB & PATH
BA039
ADA TLT
LAB & PATH
BA042
OFFICE LAB
& PATH
BA057
ADA TLT
LAB & PATH
BA043
CORRIDOR
BA041
CORRIDOR
BA040
CORRIDOR
BA053
STA 2
LAB & PATH
BA056
STA 4
LAB & PATH
BA055
STA 6
LAB & PATH
BA051
STA7
LAB & PATH
BA050
STA 5
LAB & PATH
BA052
STA 3
LAB & PATH
BA054
CORRIDOR
BA044
LAB & PATH
BA045
LAB & PATH
BA046
STA 10
LAB & PATH
BA047
STA 9
LAB & PATH
BA048
STA 8
LAB & PATH
BA049
STORAGE
LAB & PATH
BB014A
HAC
BB013
BULK STORES
BB014
MICROBIOLOGY LAB & PATH
BB052
ELEVATOR LOBBY
BA004
CORRIDOR
BA002
MALE HC TLT
BB006
FEMALE
HC TLT
BB007
MICRO LAB
& PATH
BB057
REFER
BB056
STER / SOLUTION
BB055
BIO-SAFETY
BB054
FLOR-
MICROSCOPE
BB053
STORAGE FMS
BB067
OFFICE
BC131A
OFFICE
BB043
OFFICE
BB042
STORAGE ROOM
BB041
KITCHEN
BC127
ELECTRICAL
BC128
KITCHEN
BC126
STORAGE
BC125A
VENDING
BC125
FOOD STORAGE
BC124
CAFETERIA CANTEEN
BC123
RECORDS
LAB & PATH
BB039
CYTOLOGY
BB038
FROZEN / GROSS
BB036
HISTOLOGY
BB037
OFFICE
BB035
OFFICE
BB034
OFFICE
BB033
OFFICE
BB030
OFFICE
BB029
OFFICE
BB028
OFFICE
& PATH
BB026
OFFICE
BB025
FLAM STORAGE
BB020
MALE
HC TLT
BB021
FEMALE
HC TLT
BBO22OFFICE
BB023
OFFICE
BB027
OFFICE
BB027A
ELECTRICAL
BB019
SIGNAL FMS
BB018
STAIR
H1602
CORRIDOR
BB005
BLOOD BANK
BB058
CORRIDOR
BB040
COAG
LAB & PATH
BB044
SEND OUT
BB045
HERAROUTINE
BB046
AUTOMATED
BB047
BLOOD GAS
BB048
URINE & FECES
BB049
SPECIAL CHEMISTY
BB051
CORRIDOR
BB0124
CORRIDOR
BB016
CORRIDOR
BB015
STORAGE
BC117A
TEL OPER
BC141
COMP
WRKRM IRM
BC142
TELEHEALTH
BC131
PIPE BASEMENT
N/A
RECEPTION
LAB & PATH
BB004
LOCKER ROOM
BB003CORRIDOR
BB
COMPUTER ROOM
BC144
CORRIDOR
BC-A
ELECTRICAL
FMS
BC140
STORAGE
BC139
STAIR
H1603
F.E.
H1604
STORAGE
BC145
CRAWL SPACE
H1605
ELECTRICAL
BA017
FILE STORAGE
BA016
STAIR
H1606
AREAWAY
BA018
STORAGE CANTEEN
BC148
FITNESS CENTER VAEA
BC147
BARBER
CANTEEN
BC146
BOILER ROOM
BF152
STAIR #06
H1607
BLR SPVR
BF155
LOCKER
BF154
CONTROL
BF153
EXISTING AREA WAY
H1608
BIOHAZARD
BF136
TRANSFORMER
BF135
OFFICE POLICE
BF148
TRAINING ROOM
BF149D
TRAINING ROOM B
BF149B
STOR.
POLICE
BF149C
STOR.
POLICE
BF149A
OFFICE POLICE
BF149
HAC FMS
BF147
DETECTIVE
BF146
FEM TLT
BF145
CORRIDOR
BF-B
SEC / WAITIN
BF137
CHIEF POLICE
BF138
ASST CHIEF POLICE
BF141
EMS ASST CHIEF
BF132
M&O FORMAN
BF130
OTHER
BF102
STOR.
BF146A
ARMORY
BF144
MALE LOCKERS
BF143
HOLDING
POLICE
BF139A
MALE TLT
BF142
OPERATIONS POLICE
BF139
STOR POLICE
BF137A
COMM CENTER
BF140
FMS PSA
BF129
VESTIBULE
BF100
A/C SHOP
BF103
STAIR #05
H1609
ELECT SHOP
BF104
LOCKSMITH
BF105
ELECT SUPER
BF104B
LOUNGE
BF104A
BIOMED SHOP
BF117
BIOMED SUPER
BF117B
MED GAS
WRK RM FMS
BF117A
MALE TLT
FMS
BF119D
HAC
BF119C FEMALE TLT
TLT FMS
BF119B
WAREHOUSE
BF121
LAUNDRY
BF122
SEAMSTRESS
BF118
ELECTRIC
FMS
BF112
F.E.
BF113
STOR.
BF114
SUPPLIES PHARMACY
BF115
HAC
BF111
STORAGE
BF106
TELECOM
FMS
BF107
EMS CHIEF
BF108
M-LOUNGE
BF109
SHOWER FMS
BF109C
MALE TLT
BF109A
LOCKER FMS
BF109B
OFFICE
LOGISTICS
BF156
F-LOUNGE
BE125
STORAGE CANTEEN
BE124
F-LOCKER
BE125B
HAC
SPD
BE107
M-LOCKER
BE106
TLT.
BE106A
STAFF LOUNGE
BE104
STORAGE
BE123A
F.E.
BE123B
ELECTICAL
FMS
BE123C
ELECTRICAL
BE123D
F-LOCKER
BE105
HAC
BE122
TOILET
BE105A
STERILE SUPPLY
BE103
EQUIP STORAG
BE102A
CART WASH
PASS THRU
H1610
MAIN CART WASH
BE108
CHIEF
BE117
INVENTORY MANAGEMENT
BE116
OFFICE
LOGISTICS
BE115
OFFICE
LOGISTICS
BE115A
BREAK-OUT
BE100
OFFICE
BE100A
OFFICE
BE100B
DISPATCH
BE101
CLEAN SUPPLY
BE102
HAC
BE112
R.O.
BE111
CORR.
SPS
BE110
DECONTAM
BE109
OFFICE
BE118
TELECOM
FMS
BE119
SCOPE ROOM
SPS
BE120
SOILED UTIL
BE121
ELEV
BE-1
ELEV
BE-2
SIM ROOM
BC121A
CONTROL
ROOM LRS
BC121
DIET COMM
BD104
FLAM
STOR BMS
BD102
STERILE PREP
BE113
MULTI-PURPOSE ROOM
BC122
CHECK-IN
BC132
DUPLICATION
BC133
CHIEF
BC138AOFFICE
CANTEEN
BC138
STORAGE
BC138B
OFFICE
BC137
OFFICE
BE113A
OFFICE
BC135
OFFICE
BC134
HAC FMS
BC129
STORAGE
BC130
MAIL ROOM
BE114
CORRIDOR
BB060
CORRIDOR
BB059
CONFERENCE ROOM
BB001
BREAKROOM
BB002
CRAWL SPACE
CS
STAIR
H1611
OFFICE
BC103
OFFICE
BC104
MED MEDIA
BC108
CHIEF
BC107
OFFICE
BC106
OFFICE
BC105
MALE TLT
BC115
FEMALE TLT
BC114
OFFICE
BC101
OFFICE
BC102
STORAGE
BC112A
CK-IN LRS
BC111
CORRIDOR
BC-B
STORAGE
BC110A
CHIEF LIBRARY
BC109
STAIR
EXT.
CLASSROOM #2
BC110
CLASSROOM #1
BC112
ELECTRICAL
FMS
BD120
CLEAN
UTIL N&FS
BD119
TEL OPER
BC113
STAIR
H1612
OFFICE
BC119B
SECRETARY
BC119
CHIEF
BC119A
REFER-VEG
BD105
REFER - THAW
BD111
REFER-EGG
N&FS
BD110
REFER
CONDIMENTS N&FS
BD109
REFER
MOW N&FS
BD108
REFER
COOKS
N&FS
BD106
ELEC
CLOSET FMS
BD113
REFER-MEAT
BD112
HAC
BF123
OXY
STORE
BMS
BF124
OXY
STORE
BMS
BF125
DOCK
DOCK
WAREHOUSE
BF127
CHEM
STOR N&FS
BD124
A/C/SHOP
BF126
PAPER STORE
BD123
OFFICE
BD122
CLASSROOM
N&FS
BD121
SUPERVISORS
BD114
OFFICE
BD114A
FOOD PREP
BD115
POT RM
BD117
REFER-VEG
BD116
CORRIDOR
BF - A
CORRIDOR
BD001
CORRIDOR
AB15N
F.E.
BD103A
F.E.
H1613
STORAGE
BC117B
INGREDIENT CONTROL
BD107
MAIN KITCHEN
BD103
DISH RM
BD118
ELECTRICAL
BD125
ELECTRICAL
FMS
BC118
LIBRARY
BC100
MECHANICAL
BA012
CLASSROOM
BC117
LINEN
BC120
FEMALE TLT
BE125A
STORAGE
BF156A
MALE TLT
BD100
FEMALE TLT
BD101
CORRIDOR
BF-C
SWITCHGEAR
BF134
MECH RM
BF150
PLUMBING SHOP
BF151
SHOP
BF133
F.E.
H1614 SUPPLY
BF131
CORRIDOR
BF-E
M&O ASST
BF128
EMS SUPERVISORS
BF110
STOR IRM
BC145A
CORRIDOR
BF-D
CORRIDOR
BF100A
STERILIZER
TWO
H1615
STERILIZER
ONE
H1616
ELEV
BC1
ELEV
BC2
ELEV.
BC3
MECHANICAL
BA009
AREAWAY
H1617
WAITING ROOM IMAGING
BF101
OFFICE
BB031
CORRIDOR
BA011
F.E.
TAB15
ELECTRICAL
FMS
BD126
TRASH CHUTE
H1619
OFFICE
H1933
CORRIDOR
H1946
A01
A02
A02
DEPARTMENT LEGEND
Canteen
FMS
HAS
Interdepartmental circulation
Lab & Path
Logistics
LRS
Morgue
Multi-purpose
N&FS
OI&T
Phlebotomy
Police
ROI
SPS
VAEA
VOL
Room 1B105
Room 1B106
Room 1B212
Room 1B213
INFECTION CONTROL RISK ASSESSMENT
CONSTRUCTION ACTIVITY INFECTION CONTROL RISK GROUP
TYPE A: Inspection, non-invasive activity GROUP 1: Low risk - office spaces, engineering, EVS, laundry TYPE B: Small scale, short duration, moderate to high levels of dust GROUP 2: Medium Risk - patience care areas not 3 or 4, lab, rehab, outpatient services TYPE C: Activity generates moderate to high levels of dust, requires greater than one work shift for completion
GROUP 3: High Risk - ED, imaging, PACU, L/D NICU, newborn areas, nuc med, admissions, dialysis, sterile processing, cardiopulmonary, pediatrics
TYPE D: Major demolition and construction activities GROUP 4: Highest Risk - OR, cath lab, ICU, CCC, RTC, anesthesia, ENDO, pharmacy compounding, neg pressure rooms
CLASS I
A-1, A-2, A-3
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
CLASS II
B-1, B-2, C-1
CLASS III
A-4, B-3, C-2, C-3
CLASS IV
B-4, C-4, D-1, D-2, D-3, D-4
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
SEQUENCING/ICRA LEGEND
WORK AREAS REQUIRING
TEMPORARY PARTITIONS
PHASE 1 - ICRA CLASS II (TYPE B/LOW RISK)
PHASE 2 - ICRA CLASS II (TYPE B/MED. RISK)
PHASE 3 - ICRA CLASS III (TYPE B/HIGH RISK)
PHASE 5 - ICRA CLASS II (TYPE C/LOW RISK)
PHASE 6 - ICRA CLASS III (TYPE C/MED. RISK)
PHASE 7 - ICRA CLASS IV (TYPE C/HIGH RISK)
WORK AREAS BLOCKING MEANS OF
EGRESS REQUIRING TEMPORARY
PARTITIONS & WORK AFTER HOURS
OR WEEKENDS
EXIT
WORK AREAS BLOCKING MEANS
OF EGRESS REQUIRING WORK
AFTER HOURS OR WEEKENDS
NOTE: INFORMATION SHOWN HERE ARE PHASING/ICRA
RECOMMENDATIONS. GC TO CONFIRM SEQUENCING DETAILS &
FACILITY ICRA REQUIREMENTS WITH COR. SEE SPEC SECTION 01 35 26
SAFETY REQUIREMENTS FOR ADDITIONAL DETAILS.
CONTRACTOR PATH OF TRAVEL
PHASE 8 - ICRA CLASS V (TYPE C/HIGHEST RISK)
PHASE 4 - ICRA CLASS IV (TYPE B/HIGHEST RISK)
FIRE/SMOKE BARRIER, 3 HOUR
PARTITION LEGEND
REFER TO SHEET GC001, FIRE/SMOKE BARRIER DESCRIPTIONS, FOR
REQUIREMENTS FOR PENETRATIONS AND DOORS IN RATED PARTITIONS.
FIRE/SMOKE BARRIER, 2 HOUR
FIRE BARRIER, 2 HOUR
FIRE/SMOKE BARRIER, 1 HOUR
FIRE BARRIER, 1 HOUR
FIRE PARTITION/SMOKE BARRIER, 1/2 HOUR
SMOKE TIGHT PARTITION
16 16 32 1/16" = 1'-0"
FEETSCALE
PLAN
NORTH
TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//A sh ev ille F ire D oo rs
/6
-2 3-
3.
.A
.A
SH
FD
.rv t 9/
/2
1:
:0
PM
47-GS100
PHASING/ICRA PLAN - LEVEL 00
Awen Solutions Group 4196 Merchant Plaza, Suite 711 Woodbridge, VA 22192
09/23/2024
UPGRADE-REPLACE FIRE AND
STORAGE ROOM DOORS, BLDGS 47
AND 62
1100 TUNNEL ROAD, ASHEVILLE, NC 28805
637-23-103100% CONSTRUCTION
DOCUMENTS 47
INFECTION CONTROL RISK ASSESSMENT
CONSTRUCTION ACTIVITY INFECTION CONTROL RISK GROUP
TYPE A: Inspection, non-invasive activity GROUP 1: Low risk - office spaces, engineering, EVS, laundry TYPE B: Small scale, short duration, moderate to high levels of dust GROUP 2: Medium Risk - patience care areas not 3 or 4, lab, rehab, outpatient services TYPE C: Activity generates moderate to high levels of dust, requires greater than one work shift for completion
GROUP 3: High Risk - ED, imaging, PACU, L/D NICU, newborn areas, nuc med, admissions, dialysis, sterile processing, cardiopulmonary, pediatrics
TYPE D: Major demolition and construction activities GROUP 4: Highest Risk - OR, cath lab, ICU, CCC, RTC, anesthesia, ENDO, pharmacy compounding, neg pressure rooms
CLASS I
A-1, A-2, A-3
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
CLASS II
B-1, B-2, C-1
CLASS III
A-4, B-3, C-2, C-3
CLASS IV
B-4, C-4, D-1, D-2, D-3, D-4
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
SEE SPEC SECTION 01 35 26 - SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL
47-101F
47-114S
47-131S
47-104S
47-101S47-104H
47-130S
47-129S
47-128S
47-127S
47-126S
47-117H
47-114H
47-125S 47-124S
47-102F
47-103F
47-123S
47-122S
47-117S
47-118S
47-104F
47-119S
47-120S47-121S
47-115S
47-116S
47-108F
47-134S
47-106F
47-107F
47-121F
47-111F
47-125H
47-123F
47-122F
47-110F 47-119F
47-120F
47-126F 47-127F
47-129F47-128F
47-124F
47-125F
47-134H
47-112F
47-118F
47-133S
47-132S
47-121H
47-122H
47-109S
47-111S
47-110S
47-102S
47-105F 47-108S
47-103S
47-101H
47-112S
47-106BS
47-106S
47-107H
47-115F
47-134F
47-130F
47-132F
47-131F
47-133F
47-139H
47-138H
ENT EXAM
1G106
FIRE UTIL
H1783
AUD EXAM
1G107A
AUD EXAM
1G107B
AUD INSTR CALIB
1G108
HC TLT
AUDIO
1G108A
PHONE
UTIL FMS
1D152A
ELEC
UTIL FMS
1D152B
AUD EXAM
1G109
TLT
1G105A TLT
1G106A
ENT EXAM
1G105
BOOTH AUDIO
1G118A
CONTROL AUDIO
1G118
CORRIDOR
1D163
ENT EXAM
1G104
ENT EXAM
1G103
BOOTH AUDIO
1G117A
CONTROL AUDIO
1G117
CONTROL AUDIO
1G116
BOOTH AUDIO
1G116A
AUDIO
RECEPTION SURGERY
1G102 AUD OFFICE
1G115
ENT EXAM
1G119
AUD EXAM
1G114
AUD EXAM
1G113
AUD EXAM
1G112
AUD EXAM
1G111
AUD EXAM
1G110
CPE RESIDENTS
1G100B
AUDIO WAITING
1G101
CORRIDOR
1D170
CORRIDOR
1D151
MAIN CHAPEL
1G130
OFFICE
1G100A
STORE ROOM
1D157
OFFICE
1D156
OFFICE
1G155
C/T TA CTL
1G154
C/T TA SCAN
1D153
STORAGE
1D152
ENT EXAM
1G120
ENT EXAM
1G121
ENT EXAM
1G122
EXAM/OFFICE
1G123
EXAM/OFFICE
1G124
EXAM/OFFICE
1G125
EXAM/OFFICE
1G126
EXAM/OFFICE
1G127
SPINAL CORD INJURY
1G128
EXAM/OFFICE
1G129
EXAM/OFFICE
H1784
EXAM/OFFICE
1G131
OFFICE
1G132
ELECT UTIL
TG133D
PHONE UTIL
TG133C
ELEC UTIL
1G133B
WHEEL CHAIR SHOPS
1G134
MALE TLT
1G135
HAC
1G133A
TR
1G131A
STORAGE
1H113A
OFFICE
1H113
STORAGE
1H113B
EXAM
1H114
EXAM
1H115
EXAM
1H116
OFFICE
1H124
FML TLT
1G136
OFFICE
1H110
OFFICE
1H111 OFFICE
1H112
STAIR
H1785
WAITING
1G137
OFFIC
1H120
OFFICE
1H121 OFFICE
1H122
RECEPTION
1H122A
OFFICE
1H123
OFFICE
1H136
EXAM
1H139
EXAM
1H138
EXAM ROOM
PMRS
1H143
OFFICE
1H144
OFFICE
PMRS
1H142
HANDICAP TLT
1H149
MALE TLT
1H148
FML TLT
1H147
STORAGE
1H118A
WORK STM
1H126
WAITING
1H117
EXAM
1H133
TLT
1H145
HAC
1H146
ELEC
EQUIP
TA137A
ELEC
EQUIP
TA137B
FIRE
EQUIP
TA137C
CORRIDOR
1E110
EXAM
1E109
EXAM
1E108
EXAM
1E107
CACI
1F137
RO CLOSET
1F119
SUPPLY
1F138
CASE MGR
1F139
OFFICE
1F121
OFFICE
1F122
OFFICE
1F123
BREAK ROOM
1F124
TECH OFFICE
1F117 IRM
1F114
EXAM
1E106
EXAM
1E105
OFFICE
1D148
OFFICE
1D147
FIRE EQUIP
H1800
OFFICE
1D146
PHYSICIAN
H1801
RADIOLOGIST
1D145
COMP ROOM
1D144
MEDICAL SUPPLIES
1D143
ULTRASOUND
1D142
C/T PQ SCANNER
1D167
UTIL
1D140
OFFICE
H1802
OFFICE
1D137
OFFICE
1D136
OFFICE
1D135
OFFICE
1D134
DIV/ANGIO
1D169
STAFF LOUNGE
1D114
NUC MED CAMERA 3
1D120
ULTRASOUND
H1803
UPTAKE ROOM
1D122
FLUORO RM 3
1D164
RADIOGRAPHIC RM 2
H1804
C/T CONTROL
1D168
NM READ/PROC
1D121
TLT
1D141A
RADIOGRAPHIC
1D113
ELEC EQUIP
1D111
LOCKERS
1D123
DOSE ADMIN
1D115
OFFICE
1D125
BREAK RM
1D126
OFFICE
1D124
TOILET
1D117
FLUOROSCOPIC RM 4
1D166
DRESS ROOM
1D165
TLT
1D165A
TLT
1D165B
OFFICE
1D150
ELEC
EQUIP
TD149
CORRIDOR
H1805
CONF RM
1D104
RECEPT / WAITING
1D105
TOILET
1D103
MRI SCANNER
1D127
TOILET
1D101
NUC MED CAMERA 1
1D118
RADIO PHARMACY
1D116 EXAM
1J118A
IV CONSENT
1D110
NUC MED CAMERA 2
1D119
HAC
1D112
DRESSING RM
1D108
OFFICE
1D107
OFFICE
1D109
WAITING
1D106
RADIO
GRAPHIC
1D113A
CORRIDOR
H1806
CORRIDOR
1D133
DECAY CLOSET
1D116ASTORAGE
1D165C
OFFICE
1F129
CONF RM
1F130
OFFICE
1F126A
OFFICE
1F126
BREAKROOM
1C150
CLINIC PHARM
1F125
CONF ROOM
1F128
OFFICE
1F127
MED PREP
1F111
CORRIDOR
1C126
ELEC EQUIP
1H140A
CK-IN
1H135
WAITING
1H140
OFFICE
1H141
OFFICE
1H151
OFFICE
1H156
OFFICE
1H160
OFFICE
1H159
OFFICE
1H161
MINOR PRO
1C156
STORAGE
1H153
OFFICE/WAITING
1H150
OFFICE
1H154
INVENTORY
1H157
EXAM RM
1C157
SPD
1C166
STAFF LOCKER
1C160
EXAM
1C152
EXAM
1C148
EXAM
1C147
EXAM
1C171
TOILET
1C160A
DRESSING RM
1C168
SOIL
UTIL
1C170
NO ROOM
NAME
1C167
NO ROOM
NAME
H1807
TLT
1C169
VASCULAR
1C154
RADIOGRAPHIC RM
1D159
OFFICE
1D158
STOR.
1H158
BREAKROOM
1H155
OFFICE
1H152
PHYSICIAN
1J155
PHYSICIAN
1J154
PHYSICIAN
1J153
FIRE EQUIP
H1813
ELEC
1D132
ELEC EQUIP
1D131
PHYSICIAN
1J156
RADIOGRAPHIC RM
1D160
RADIOGRAPHIC RM 1
1D161
RECEPT
H1814
ROOM
1C143
EXAM
H1815
EXAM
H1816
BIOPSY RM
H1817
URODYNAMICS
H1818
EXAM 17
1C129
STOR.
1C132
EXAM 16
1C134EXA 15
1C137
EXAM 14
1C138
HAC
1C142
MEDS
1C144
RECEPT
H1819
WAITING
H1820
WAITING
1D102
MRI COMPUTER RM
1D128A
OFFICE
H1821
CONTROL
H1822
TLT
H1823
D.R.
H1824
CYSTO
H1825
CONTROL
H1826
HAC
1C118
STAIR
H1827
STORAGE
1C149
EXAM 13
1C140
EXAM 12
1C139
EXAM 11
1C135
EXAM 10
1C133
EXAM 9
1C130
EXAM 8
1C128
EXAM 7
1C127
STORAGE
1F105
WINDOWS
1F104
WAITING
1F101
RESEARCH ROOM
1F102
VAULT
1F113
INPATIENT PHARMACY ACCESS
H1828
ELECT UTIL
1F136
CART STOR
1F135
TLT
1D162A
TECH IMAGING WORK ROOM
1D171
DRESSING RM
1D162
OFFICE
1E127
CLEAN RM
1E125
DIRTY RM
1E126
NUTRITION
1E121
TLT
1E122
TLT
1E123
TRIAGE
1E119 CLERK
1E118
STAFF BREAKROOM
1E113
ELECT UTIL
1E112 PHONE UTIL
1E113C
FIRE UTIL
1E113B
EXAM ROOM
1E114
OFFICE
1E116
TLT
1E114A
TLT
1E113A
WAITING
1E117
TLT.
1E117A
TLT.
1E116A
HAC
1E120
INFUSION CENTER
H1829 FIRE UTIL
1E123A
EXAM/TRMT
1E128 OFFICE
1E129
CORRIDOR
1E124
CORRIDOR
H1830
STAIR #04
H1831
TLT
1E104
TLT
1E103
OFFICE
1E102
OFFICE 1E101
1E101
SOILED UTIL
1C122
EXAM 6
1C125
EXAM 5
1C123
TLT
H1836
STORAGE
1K136B
OFFICE
1K136A
STRESS TEST
1K136
EXAM
1K135
EXAM
1K133 EKG
1K134
EXAM ROOM
1C120A
CAST RM
1C120
CONSULT
1K104
CASHIER
1K137
TRAVEL CK
1K139
WAITING
1K140
OFFICE
1K1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .