Attachment - I -AHU Drawings.pdf
PDF 13 MB Posted
- Attached to
- Replace AHUs and Condensing Units 610A4-21-203 Federal contract opportunity
- Solicitation number
- 36C25023B0052
About this file
This document provides details on a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation number is 36C25023B0052 and seeks to replace air handling units and condensing units at location 610A4-21-203. The opportunity type is a solicitation. The attached file is a 13MB PDF with drawings related to the air handling units. The contract aims to replace existing air handling and condensing units, likely for an inpatient facility, with the work to be awarded on a full and open basis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25023B0052 Amendment 3.pdf | ||
| Asbestos and Lead Report Ft. Wayne.pdf | ||
| 36C25023B0052 P0002.pdf | ||
| 36C25023B0052 Amendment 1.pdf | ||
| 36C25023B0052 IFB.pdf | ||
| Attachment - III - Contractor Certification Regarding Safety and Environmental.docx | DOCX document | |
| Attachment - II - Design Firm Specs.pdf | ||
| Attachment - VI - Contractor EMR Certification Form.docx | DOCX document | |
| Attachment - IV - RFI Form.doc | DOC document | |
| Attachment - V -Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ALTERNATE
ALTERNATE NO. 1: ALL WORK ASSOCIATED WITH THE PLACEMENT OF THE LAB CONDENSING UNIT
INCLUDING ICRA, TEMPERATURE CONTROLS, ELECTRICAL, MECHANICAL AND PIPING.
SITE
EMERGENCY ENTRANCE
MAIN ENTRANCE
BUILDING 1
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/3
/2
:5
:2
A
M C
U s e rs \l b y rd
\D o c u m e n ts \A
-2
-1
V
A F
W
A H
U lb y rd
V D
E K
F .r v t
G-001
COVER
1 3LB
REPLACE AHU'S AND
CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
JULY 5, 2022
100% CONSTRUCTION DOCUMENTS
610A4-21-20320-187
REPLACE AHU'S AND CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
VA PROJECT #: 610A4-21-203
JB
DRAWING LIST
GENERAL
G-001 COVER 1 3
G-100 GENERAL INFORMATION AND ICRA DETAILS 2 3
LS101 FIRST FLOOR LIFE SAFETY PLAN 3 3
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS, DETAILS AND NOTES 1 4
A-002 SITE LOGISTICS PLAN 2 4
A-003 LOGISTICS FLOOR PLANS 3 4
A-101 FIRST AND SECOND FLOOR PLANS 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 5
MD101 MECHANICAL DEMOLITION PLAN 2 5
MH101 CHILLER AND LAB CONDENSING UNIT MECHANICAL PLAN 3 5
M-501 MECHANICAL DETAILS 4 5
M-502 MECHANICAL DETAILS 5 5
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 4
ED101 ROOF ELECTRICAL DEMOLITION PLAN - AREA A 2 4
EP101 CHILLER AND CONDENSER POWER PLAN 3 4
E-501 ELECTRICAL DETAILS 4 4
VA NORTHERN INDIANA HEALTH CARE SYSTEM, FORT WAYNE CAMPUS
DocuSign Envelope ID: 822E543F-8DD2-4E8C-BC31-9D27142A3B62
6/30/2022
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE CONTRACTOR
OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED SUBMITTAL OF
DESIGN WORK TO THE CITY OF ANYWHERE FOR PLAN REVIEW AND PERMITTING:
1. FIRE SPRINKLER SYSTEMS
2. FIRE ALARM SYSTEMS
ILSM SIGNAGE
REPLACE AHU'S AND CONDENSING UNITS
THIS EXIT IS CLOSED AND LEADS TO A CONSTRUCTION AREA
1'-5"
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
PLEASE USE ALTERNATE EXITS AS MARKED
ICRA, ILSM, FIRE WATCH
AND MISC. FORMS
FORMS CONTAINER
TO BE CLEAR
PLASTIC
A. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER.
B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS
I OR CLASS II SHALL REQUIRE APPROVAL BY THE
FACILITY SAFETY MANAGER AND CONTRACTING
OFFICER REPRESENTATIVE BEFORE BEGINNING
ANY CONSTRUCTION WORK. HAZARD RISK
CLASSIFICATIONS OF CLASS III OR IV SHALL
REQUIRE A PERMIT BEFORE BEGINNING ANY
CONSTRUCTION WORK. INFECTION CONTROL
PERMITS WILL BE ISSUED BY THE FACILITY SAFETY
MANAGER AND CONTRACTING OFFICER
REPRESENTATIVE.
C. INFECTION CONTROL PERMITS SHALL BE POSTED
OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.
MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK
IS LOCATED IN MULTIPLE AREAS.
D. THE REQUIRED INFECTION CONTROL PRECAUTIONS
ARE AS FOLLOWS:
CLASS 1:
• NOTIFY THE COR.
• EXECUTE WORK USING METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION OPERATIONS.
• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING
TILES DISPLACED FOR VISUAL INSPECTION.
• UPON COMPLETION: CLEAN WORK AREA, AND
NOTIFY COR.
CLASS 2:
• NOTIFY THE COR.
• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE
DUST FROM DISPERSING INTO ATMOSPHERE SUCH
AS WET METHODS OR TOOL MOUNTED DUST
COLLECTORS.
• WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
• SEAL UNUSED DOORS WITH PAINTERS TAPE.
• BLOCK OFF AND SEAL AIR VENTS.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
• UPON COMPLETION: WIPE WORK SURFACES WITH
CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
CLASS 3:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• REMOVE OR ISOLATE HVAC SYSTEM IN AREA
WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
CLASS 4:
DURING CONSTRUCTION WORK:
• OBTAIN PERMIT FROM THE COR.
• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS
BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL
CUBE METHOD (CART WITH PLASTIC COVERING AND
SEALED CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS.
• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF
WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITORED WITH A DIGITAL
DISPLAY, RECORDING AND ALARM INSTRUMENT,
WHICH MUST BE CALIBRATED ON INSTALLATION,
MAINTAINED WITH PERIODIC CALIBRATION AND
MONITORED BY THE CONTRACTOR.
• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
• CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM
CLEANER BEFORE LEAVING WORK SITE OR THEY
CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE
REMOVED EACH TIME THEY LEAVE WORK SITE.
• ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
UPON COMPLETION:
• DO NOT REMOVE BARRIERS FROM WORK AREA
UNTIL COMPLETED PROJECT THOROUGHLY
CLEANED, AND IS INSPECTED BY THE CONTRACTING
OFFICER REPRESENTATIVE AND BY THE VA
ENVIRONMENTAL SERVICES DEPARTMENT.
• REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION, OUTSIDE OF NORMAL WORK
HOURS.
• CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
• COVER TRANSPORT RECEPTACLES OR CARTS.
TAPE COVERING UNLESS SOLID LID.
• VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
• WET MOP AREA WITH CLEANER/DISINFECTANT.
• UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
• RETURN PERMIT TO THE COR.
OUTSIDE OF BUILDING
DAILY CHANGED HEPA
FILTER
HEPA NEGATIVE
AIR UNIT
DAILY CHANGED (OR MORE AS NEEDED)
PRE FILTER
FIRE RATED PLYWOOD
F L E
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
TYPE A PLASTIC ZIPPER
WALL CURTAIN BARRIER
6 MIL PLASTIC, SEE PLANS
FOR LOCATION
INDICATOR SHALL BE AT -0.01 OR
GREATER (VERIFY DAILY). IF NOT,
VERIFY ALL OPENINGS SUCH AS
DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
DOOR OPENING
VENT TO OUTSIDE
ROUTE TO BE
APPROVED BY OWNER
INFECTION CONTROL RISK ASSESSMENT (ICRA) (GENERAL)
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS PROJECT AS INDICATED IN ICRA MATRIX FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE TIGHT SEALS SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
3. A DWYER GAUGE SHALL BE USED AT CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR FLOWS.
4. AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 16.
5. PROVIDE STICKY MATS AT THE PLASTIC BARRIER ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
6. USE CORRIDORS AS INDICATED ON CONSTRUCTION ACCESS PLANS AS PRIMARY CONSTRUCTION ACCESS.
7. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN
TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
8. CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND THE
CONSTRUCTION STAGING/PREP AREA.
9. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, DESIGNATED TRAFFIC ROUTES SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
10. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION
DEBRIS.
VENTILATION AND ENVIRONMENTAL CONTROLS
11. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND NOTIFY CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH
FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
12. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST INTO A ROOM, A PRE-FILTER AND HEPA FILTER
SHALL BE USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
13. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE VERIFIED DAILY.
14. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT
THE PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES EQUIPMENT AND RELATED AREAS
15. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA..
16. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS
INSPECTED AND APPROVED THE CLEANING.
17. AIR BALANCING AND AHU STARTUP ARE NOT PERMISSIBLE PRIOR TO REVIEW AND APPROVAL OF EXTENSIVE
"CONSTRUCTION CLEAN" BY THE CONTRACTOR.
PHASING AND EGRESS
18. THE VA RESERVES THE RIGHT TO ADJUST THE PHASING LIMITS AND WORK HOURS OR ENTIRE CONSTRUCTION
DURATION AS NECESSARY FOR THE BENEFIT OF THE OPERATION OF THE HOSPITAL.
19. ALTHOUGH EGRESS IN THE CONSTRUCTION PHASES IS RESTRICTED DURING CONSTRUCTION HOURS, EMERGENCY EGRESS IN CORRIDORS MUST BE MAINTAINED WHEN POSSIBLE. WHEN EMERGENCY EGRESS CANNOT BE PROVIDED, THE CONTRACTOR SHALL DEVELOP AN INTERIM LIFE SAFETY PLAN, WITH ALL APPLICABLE TEMPORARY SIGNAGE, TO
BE APPROVED BY THE VA SAFETY DEPARTMENT, SIGNAGE BY CONTRACTOR.
20. DRILLING INTO EXISTING LEAD CONTAINING YELLOW GLAZED TILE AND HAZARDOUS MATERIALS IN ADDITION AND RENOVATION PROJECTS: ACTIVITIES WILL BE PERFORMED IN ICRA APPLICABLE PLASTIC TENT/ ENCLOSURE USING AN
IMPACT DRILL WITH INTEGRAL HEPA FILTERED VACUUM.
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING
RUNNER
TOP SEALING
RUNNER
SUPPORT POLES,
QUANTITY PER
MANUF.
RECOMMENDATIONS
REQU.
AS
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove or isolation of HVAC system in areas where work was being performed.
1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant
5. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covers.
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
• Cardiology
• Echocardiography
• Endoscopy
• Nuclear Medicine
• Physical Therapy
• Radiology / MRI
• Respitory Therapy
• CCU
• Emergency Room
• Labor & Delivery
• Laboratories (soecimen)
• Newborn Nursery
• Outpatient Surgery
• Pediatrics
• Pharmacy
• Post Anesthesia Care Unit
• Surgical Units
• Any area caring for immunocompromised patients
• Burn Unit
• Cardiac Cath Lab
• Central Sterile Supply
• Intensive Care Units
• Medical Unit
• Negative pressure isolation rooms
• Oncology
• Operation rooms including C-section rooms
• Office Spaces
• Hallways
• FES/EMS areas
C L
A S
S I V
C L
A S
S I
II
C L
A S
S I I
C L A
S S
I
PATIENT RISK GROUPS
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
TYPE A TYPE B TYPE C TYPE D
I II II III/IV
I II III IV
I II III/IV IV
II III/IV I/IV IV
During Construction Project: Upon Completion of Project:
TYPE D
TYPE C
TYPE B
TYPE A
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project ny Ptient Risk
Construction Project Type
Note: Infection Control approval will be required when the Contruction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.
It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
Type of Construction Project activity (Type A-D)
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/3
/2
:5
:1
A
M C
U s e rs \l b y rd
\D o c u m e n ts \A
-2
-1
V
A F
W
A H
U lb y rd
V D
E K
F .r v t
G-100
GENERAL INFORMATION AND ICRA
DETAILS
2 3LB
REPLACE AHU'S AND
CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
JULY 5, 2022
100% CONSTRUCTION DOCUMENTS
610A4-21-20320-187
JB
GENERAL SYMBOL LEGEND
DEFERRED SUBMITTALS
Scale: 3" = 1'-0"
ICRA DETAILS
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION PLAN LAYOUT
Scale: 12" = 1'-0"
ISLM
Scale: 1/2" = 1'-0"
ICRA MOBLE CONTAIMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPES
CART REQUIRED ONLY FOR DEDUCT ALTERNATE NO. 1 WORK.
CART REQUIRED ONLY FOR DEDUCT ALTERNATE NO. 1 WORK.
G
F
E
C
A
B
H
I
J
43A 5 6 7 8 10 12 13 14 15 16 18 19 20 21 229 11
A
A
B
OFFICE
107A
107B
107C
109109A
MECH.
109B
OFFICE
109C
OFFICE
109D
PHARMACY
COMP.
111A
110B
TOILET
MECH.
120B
121A 121B 121C
121D
121E
121F 121G
123D
EXAM
EXAM
123A
EXAM
123B
EXAM
123C
REPRODUCTION
OFFICE
OFFICE
126A
OFFICE
OFFICE
OFFICE
EXAM
EXAM
EXAM
133A
134A
135A
PATIENT
REGISTRATION
ELIGIBILITY
138A
MEN'S
TESTING
138B
STAFF
LOUNGE
SMALL
CONFERENCE
176A
INFORMATION
A104
A157 A158
A159
A165 A166
A169A
A168
LOCKERS
A169
A169B
A169C
A169D
A
A
CORRIDOR
STAIR DOWN
COMMON PATH 53'-11"
TOTAL TRAVEL DISTANCE 190'-9"
DEDUCT ALTERNATE
NO.1 AREA OF WORK
STAIR #2
MULTI-PURPOSE
FA
100A
CORRIDOR
1E-1
VEST.
EXAM
120A
HALL
120C
ELEV.
ELEV.
ELEV.
DEDUCT ALTERNATE
NO.1 AREA OF WORK
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
XXX
XXX
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
EGRESS WIDTH
(per NFPA 101 - 7.3.3.1)
COMMON PATH OF TRAVEL
(per NFPA 101 18.2.5.3)
EXIT ACCESS TRAVEL
(per NFPA 101 19.2.5.7.2.4)
DEAD-END CORRIDOR
(per NFPA 101 19.2.5.2)
STAIR 1 EXIT DOORS =
38"/(0.30) = 127 PPL
STAIR 2 EXIT DOORS =
38"/(0.30) = 127 PPL
STAIR 3 EXIT DOOR =
42"/(0.30) = 140 PPL
96'-0" MAXIMUM
100'-0" ALLOWED
191'-0" MAXIMUM DISTANCE
200'-0" ALLOWED
21'-4" MAXIMUM
30'-0" ALLOWED
OCCUPANT LOAD
(per NFPA 7.3.1.2) TOTAL BUILDING
56,934 GSF/150 = 380 PPL
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
59,260 SF
GROSS MEASURED AREA
(INTERIOR FACE WALLS)
56,934 SF
REQUIRED # OF EXITS
(per NFPA 101, CH 19)
EXISTING
REQUIRED DISTANCE
BETWEEN EXITS
EXISTING
FLOOR
FLOOR AREAS (per TABLE 506.2):
EXISTING NEW TOTAL
0 SF
AREA TOTAL = 56,934 SF
AREA ALLOWED = 112,500 SF
FIRST 59,260 SF
EGRESS INFORMATION
BUILDING HEIGHT = 5 STORIES + BASEMENT >85'-0"
EXSTING BUILDING
ALLOWABLE HEIGHT = EXISTING
AREA AND HEIGHT REQUIREMENTS:
59,260 SF
RENOVATED AREA = 195 SF
SCOPE OF CONSTRUCTION
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/3
/2
:5
:2
A
M C
U s e rs \l b y rd
\D o c u m e n ts \A
-2
-1
V
A F
W
A H
U lb y rd
V D
E K
F .r v t
LS101
FIRST FLOOR LIFE SAFETY PLAN
3 3LB
REPLACE AHU'S AND
CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
JULY 5, 2022
100% CONSTRUCTION DOCUMENTS
610A4-21-20320-187
JB
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
TYPE II (222)
HEALTHCARE
BUSINESS
2021 International Building Code
2021 International Plumbing Code
2021 International Energy Conservation Code 2021 International Mechanical Code 2019 NFPA 72 National Fire Alarm and Signaling Code 2017 NFPA 70 National Electrical Code
2010 ADA Code 2018 NFPA 101 Life Safety Code
ASHRAE 90.1-2016
VA Design Guide Architectural Manual 2014 August 01 VA Barrier Free Design Standard 2018 November 01
2010 ADA Standards for Accessible Design
REPLACE AHU'S AND CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
DEPARTMENT OF VETERANS AFFAIRS
CODE INFORMATION
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
LIFE SAFETY LEGEND
EGRESS PATH "A"
PATH ID LENGTH
A 94' - 5"
A (COMMON) 96' - 4"
TOTAL PATH LENGTH 190' - 9"
EGRESS PATH "B"
PATH ID LENGTH
B (COMMON) 53' - 11"
TOTAL PATH LENGTH 53' - 11"
Gross Area Level Area
FIRST FLOOR 59025 SF
Renovated Area Level Area
FIRST FLOOR 195 SF
N
KEY PLAN
SCALE: NO SCALE
SCOPE OF WORK LEGEND
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE WINDOW TYPE
WALL TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE VA COR
AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCTS.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE VA COR PRIOR TO BIDDING.
WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR
GREATER QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE VA COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS, NOTIFY THE VA COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT
GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA
OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF
PROJECT GROUNDS. COORDINATE WITH VA COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND
RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH
OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT
EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS,
AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE
REMOVAL WITH VA COR.
6. NOTIFY VA COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR
INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW
CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-
PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.) REPAIR OR
REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO
ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN
THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION
REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND
THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE
PROJECT AREA. NOTIFY AND COORDINATE WITH THE VA COR, PROVIDE
DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE
SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND
DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF
SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE
INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE VA
COR.|
13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY VA
COR AND ARCHITECT OF ANY CONFLICTS PRIOR TO PROCEEDING WITH
DEMOLITION.
14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF
THE VA COR UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE VA
COR WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE VA
COR OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR
REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
15. CONTRACTOR SHALL NOTIFY VA COR OF ANY AREA REQUIRING DEMOLITION
OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS,
TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF
PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR
REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.
16. COORDINATE WITH VA COR FOR CONSTRUCTION ACCESS ROUTE AND
LOCATIONS OF DUMPSTER AREA. COORDINATE WITH VA COR FOR SCHEDULE
OF USE OF ACCESS ROUTE FOR WASTE REMOVAL.
HOLD SUBSTRATE 1/2" OFF
FINISH FLOOR TYPICAL, NO
EXCEPTIONS
ONE LAYER 5/8" GYPSUM
BOARD ON METAL STUDS
SILL
PLAN
HEAD
TAG STUD SIZE OVERALL THICK UL ASSEMB STC*
Ma0
Mm1
Mm2
Mm3
Mm4
Mm6
Mm8
REFER TO
PARTITION TAG
FOR
INSULATION
INFORMATION
(SHOWN HERE
FOR
REFERENCE
ONLY - MAY NOT
EXIST), AND
FIRE RATING
7/8"
1-5/8"
2-1/2"
3-5/8"
4"
6"
8"
1-1/2"
2-1/4"
3-1/8"
4-1/4"
4-5/8"
6-5/8"
8-5/8"
TERMINATE WALL
CONSTRUCTION 4" ABOVE
CEILING
FINISH CEILING
PIPE
PENETRATION
(V.I.F. LOCATIONS)
VERIFY FIRE RESISTANCE
CAULKING AS REQUIRED
AROUND OPENINGS.
REPAIR ANY VOIDS.
EXISTING TPO
ROOF MEMBRANE
EXISTING
STRUCTURAL
DECK TO REMAIN
ROOF VENT PIPE
BOOT COVER
CONTINUOUS EDGE
SEALANT AT ROOF
TERMINATION
POINTS
EXISTING COVER
BOARD
EXISTING VAPOR
BARRIER
EXISTING
INSULATION
SEALANT
SAW CUT ALL NEW
PENETRATIONS AND SLEEVE
FOR WATER TIGHT CONDITION
SEAL FULL PERIMETER EA. SD.
STAINLESS STEEL CURB CAP,
SECURE TO NEW CURB
NEW INSULATED EQUIPMENT CURB,
SECURE TO DECK PER MANUF.
RECOMMENDATIONS
EXISTING ROOF MEMBRANE, TURN
UP NEW EQUIPMENT CURB
EXISTING INSULATION
AND COVER BOARD
EXISTING
STRUCTURAL DECK
TO REMAIN
EXISTING VAPOR
BARRIER
NEW TPO FLASHING, FULLY WELD AND
SEAL TO EXISTING MEMBRANE, TURN
OVER TOP OF CURB
FULLY WELD FLASHING TO
MEMBRANE
2x MEMBER TURNED
ON END
SEE MECHANICAL FOR
NEW PENETRATION POINTS
VERIFY FIRE RESISTANCE
CAULKING AS REQUIRED
AROUND OPENINGS. REPAIR
ANY VOIDS.
EXISTING TPO
ROOF
EXISTING
STRUCTURAL
DECK TO REMAIN
ROOF PIPE BOOT
COVER
CONTINUOUS EDGE
SEALANT
FULLY WELD PIPE BOOT
FLANGE TO MEMBRANE, SEAL
TO PIPE BOOT
EXISTING
VAPOR BARRIER
EXISTING
INSULATION
NON SHRINK
INSULATED FILLER
1" 1"1" 1"
EXPANDABLE
CLOSED CELL FOAM
FILLER
SAW CUT ALL NEW
PENETRATIONS AND SLEEVE
FOR WATER TIGHT CONDITION
NON SHRINK
POURABLE
SEALER
FASTENERS ON
12" O.C. SEAM TAPE AND
PRIMER/ADHESIVE
EXISTING ROOF MEMBRANE, TURN
UP NEW EQUIPMENT CURB
EXISTING INSULATION
AND COVER BOARD
EXISTING
STRUCTURAL DECK
TO REMAIN
EXISTING VAPOR BARRIER
FULLY WELD FLASHING TO
MEMBRANE
SEALANT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/3
/2
:5
:3
A
M C
U s e rs \l b y rd
\D o c u m e n ts \A
-2
-1
V
A F
W
A H
U lb y rd
V D
E K
F .r v t
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS, DETAILS AND NOTES
1 4LB
REPLACE AHU'S AND
CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
JULY 5, 2022
100% CONSTRUCTION DOCUMENTS
610A4-21-20320-187
JB
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
Scale: 1" = 1'-0"
PARTITION TYPE - Mm_ Scale: 1 1/2" = 1'-0"
FLASHING DETAIL AT NEW PIPE PENETRATIONS
Scale: 1 1/2" = 1'-0"
FLASING DETAIL AT NEW EQUIPMENT CURB
Scale: 1 1/2" = 1'-0"
FLASHING DETAIL AT PITCH POCKET
DEMOLITION NOTESGENERAL NOTES
Scale: 1 1/2" = 1'-0"
ROOF PATCHING DETAIL
TO BE INCLUDED IN DEDUCT ALTERNATE NO. 1.
TO BE INCLUDED IN DEDUCT ALTERNATE NO. 1. TO BE INCLUDED IN DEDUCT ALTERNATE NO. 1. TO BE INCLUDED IN DEDUCT ALTERNATE NO. 1. TO BE INCLUDED IN DEDUCT ALTERNATE NO. 1.
V A N
V A N
V A N
V A N
HHHHHHHHHHHHHHHHHHHH
H
HHHHHHHHHHH
HHHHHHHHHHH
H H H H H H
H
H H
H H H H
H H H H
H H
H
H
H
H
H
H
H
H
T T T T
H H
D O
W N
BELOW GRADE - OPEN AIR
D O
W N
BELOW GRADE - OPEN AIR "WINDOW WELL" & H.V.A.C. EQUIPMENT
U P
W
W
W
W
W
W
D O
W N
D O
W N
D O
W N
D O
W N
D O
W N
D O
W N
D O
W N
D O
W N
D O
W N
D O
W N
S e rv ic e P it R a m p
D O
W N
G A
Z E
B O
P A
V
IL
IO
N
G T E
B U
IL
D
IN
G
Building 5 Building 6
Building 10
B u ild in g
B u ild in g
B U
IL
D
IN
G
- 2
B U
IL
D
IN
G
- 1
A m b u la t o ry
C a re
A d d itio n
(1 -S to ry
Building 16
B u ild in g
T
T
17 (MRI)
B U
IL
D
IN
G
- 1 (5
-S to rie s
T
B U
IL
D
IN
G
- T
B U
IL
D
IN
G
- T
B U
IL
D
IN
G
- T
B U
IL
D
IN
G
- 0 T
V A
N or th er n I nd ia na H e alth
C ar e S ys tem
F or t W a yn e Ca m p us S ite R ec or d D ra wing s S ite P la n
P a rk in g
P la n
L igh t in g
S ew er
S team
W ater
E lec tr ica l
L oo p
M ed ic al G as S ch em at ic
N at ur al G as
E lec t ric al an d L igh t in g
A ll Ut ilit ie s
BELOW GRADE - OPEN AIR "WINDOW WELL"
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
PROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINE
L A K E A V E N U E PROPERTY LINEPROPERTY LINE
R A
N D
A L
L I A
D R
I V E
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
P R O
P E R T Y L
IN
E
T o C a re w S t
PROPERTY LINE PROPERTY LINE
VERMONT AVENUE
NEVADA AVENUE
3 546
LOGISTICS PLAN LEGEND
BUILDING IN CONTRACT
DIRECTION FOR SITE ACCESS
BUILDING ACCESS
SITE ACCSESS ROUTE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/3
/2
:0
:3
A
M C
U s e rs \l b y rd
\D o c u m e n ts \A
-2
-1
V
A F
W
A H
U lb y rd
V D
E K
F .r v t
A-002
SITE LOGISTICS PLAN
2 4LB
REPLACE AHU'S AND
CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
JULY 5, 2022
100% CONSTRUCTION DOCUMENTS
610A4-21-20320-187
JB
Scale: 1/64" = 1'-0"
SITE LOGISTICS
A. PROJECT DUMPSTER TO BE LOCATED NEAR
PARKING LOT BEHIND BUILDING. COORDINATE
FINAL LOCATION WITH COR.
B. CONTRACTOR PARKING ON SITE ADJACENT TO
BUILDING IS LIMITED. COORDINATE ADDITIONAL
PARKING IN REMOTE LOTS WITH COR.
C. NO CONEX STORAGE UNITS ADJACENT TO
BUILDING. COORDINATE LOCATION IN REMOTE
PARKING LOT WITH COR.
D. PORTABLE TOILET UNITS LOCATED NEAR
PARKING LOT BEHIND BUILDING.
E. CONTRACTOR USE OF ELEVATOR AND
INTERIOR ACCESS PATH LOCATED ON SHEETS
A-003.
CONTRACTOR TO KEEP NOISE AND
DISTURBANCE TO A MINIMUM INSIDE OF
FACILITY.
F. CONTRACTOR AND ALL SUBCONTRACTORS
REQUIRED TO UNDERGO COVID SCREENING
PROCEDURES PRIOR TO ENTERING THE SITE.
DEPENDING ON RESTRICTIONS IN PLACE,
BUILDING ENTRY MAY FLUCTUATE.
COORDINATE WITH COR WEEKLY FOR
UPDATES.
NORTH
0 10050 200
1 CONTRACTOR VEHICULAR TRAFFIC PATH.
2 LOCATION OF CRANE UNITS, CONFIRM WITH
COR.
3 LOCATION OF CONTRACTOR DAILY PARKING,
USE AREA F-1 CONFIRM FINAL LOCATION
WITH COR.
4 LOCATION OF CONTRACTOR LAY DOWN
AREA.
5 LOCATION OF CONTRACTOR PORTAJONS.
6 GC BUILDING ACCESS.
7 LOCATION OF CHILLER ON PAD.
8 LOCATION OF NEW CONDENSING UNIT FOR
EXISTING LAB. DEDUCT ALTERNATE NO. 1.
9 LOCATION OF DUMPSTER. CONFIRM FINAL
LOCATION WITH COR.
UP
UP
WOMEN'S
BATHROOM
PUMP
ROOM
MECH.
HAC
ELECTRICAL
STORAGE
44A
TOILETS
45AMEN'S
BATH.
BIOMED
OFFICE/
FILE
ROOM
ELECTRICAL
42A
MECHANICAL
STORAGE
MEN'S
LOCKER
ROOM
HAC
EMS
EQUIPMENT
STORAGE
63A15
VESTIBULE
18 19
SPS
22A
MEDICAL
SURGICAL
LOGISTIC
MEDICAL
SURGICAL
LOGISTIC
MEDICAL
SURGICAL
LOGISTICS
OFFICE
MECHANICAL
KITCHEN
DISHWASHING
ELEV.
ELEV.
ELEV.
STAIRS
#2
COR.
STOR. STOR.
MECH.
36A
COR.
CORRIDOR
COR.
COR.
CORRIDOR
COR.
107A
107B
107C
109A
MECH.
109BOFFICE
109C
OFFICE
109D
121F 121G
123D
EXAM
EXAM
123A
EXAM
123B
EXAM
123C
OFFICE
126A OFFICE
OFFICE
EXAM
EXAM
EXAM
OFFICE
133A
134A
135A
STORAGE
137A
PATIENT
REGISTRATION
ELIGIBILITY
138A
STAFF
LOUNGE
SMALL
CONFERENCE
176A
A159 A165 A166
A169A
A168
LOCKERS
A169
A169A
A169B
A169C
A169D
STAIRS
#2
ELEV.
ELEV.
ELEV.
CORRIDOR
AREA OF WORK
OFFICE
Room
208A
Room
Room
Room
210ARoom
210B
Room
210C
Room
XRAY
Room
214A
ULTRASOUND
EXAM
OFFICE
216A
EXAM
231BREAK
232 TOILET
XRAY
WORK
ROOM
XRAY
BREAK
LOCKER
237B
XRAY
RECEP.
239 CONFERENCE
240A
Room
Room
ELEV.
ELEV.
ELEV.
STAIR #2
TOILET
237A
SCOPE OF CONSTRUCTION
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/3
/2
:0
:3
A
M C
U s e rs \l b y rd
\D o c u m e n ts \A
-2
-1
V
A F
W
A H
U lb y rd
V D
E K
F .r v t
A-003
LOGISTICS FLOOR PLANS
3 4LB
REPLACE AHU'S AND
CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
JULY 5, 2022
100% CONSTRUCTION DOCUMENTS
610A4-21-20320-187
JB
Scale: 1/16" = 1'-0"
BASEMENT FLOOR LOGISTICS PLAN
Scale: 1/16" = 1'-0"
FIRST FLOOR LOGISTICS PLAN
Scale: 1/16" = 1'-0"
SECOND FLOOR LOGISTICS PLAN
N
KEY PLAN
SCALE: NO SCALE
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
1 PATH OF CONTRACTOR ACCESS TO STAIR
AND ELEVATOR.
2 LOCATION OF CONTRACTOR ACCESS TO
BUILDING.
3 LOCATION OF CONSTRACTOR ELEVATOR
ACCESS FOR 1ST THROUGH 5TH FLOORS.
COORDINATE WITH COR TO DETERMINE
WHICH CAB TO USE.
4 LOCATION OF CONTRACTOR STAIR ACCESS
TO 1ST THROUGH 5TH FLOORS.
5 LOCATION OF WORK TO BE PERFORMED
1ST FLOOR.
6 LOCATION OF SCAFFOLDING OR JLG LIFT
TO ACCESS WORK ON 1ST FLOOR ROOF.
7 LOCATION OF WORK TO BE PERFORMED
ON THE 1ST FLOOR ROOF.
8 MECHANICAL WORK IN THIS AREA. SEE
MECH. DRAWINGS FOR MORE
INFORMATION.
A. PROJECT DUMPSTER TO BE LOCATED NEAR
PARKING LOT BEHIND BUILDING. COORDINATE
FINAL LOCATION WITH COR.
B. CONTRACTOR PARKING ON SITE ADJACENT TO
BUILDING IS LIMITED. COORDINATE ADDITIONAL
PARKING IN REMOTE LOTS WITH COR.
C. NO CONEX STORAGE UNITS ADJACENT TO
BUILDING. COORDINATE LOCATION IN REMOTE
PARKING LOT WITH COR.
D. PORTABLE TOILET UNITS LOCATED NEAR
PARKING LOT BEHIND BUILDING.
E. CONTRACTOR USE OF ELEVATOR AND
INTERIOR ACCESS PATH LOCATED ON SHEETS
A-003
CONTRACTOR TO KEEP NOISE AND
DISTURBANCE TO A MINIMUM INSIDE OF
FACILITY.
F. CONTRACTOR AND ALL SUBCONTRACTORS
REQUIRED TO UNDERGO COVID SCREENING
PROCEDURES PRIOR TO ENTERING THE SITE.
DEPENDING ON RESTRICTIONS IN PLACE,
BUILDING ENTRY MAY FLUCTUATE.
COORDINATE WITH COR WEEKLY FOR
UPDATES.
SCOPE OF WORK LEGEND
TO BE INCLUDED IN DEDUCT ALTERNATE NO.1. TO BE INCLUDED IN DEDUCT ALTERNATE NO.1.
TO BE INCLUDED IN DEDUCT ALTERNATE NO.1.
A-201
E
C
A
B
8 10 12 13 149 11
EXAM
EXAM
123A
EXAM
123B
EXAM
123C
OFFICE
OFFICE
EXAM
EXAM
EXAM
OFFICE
133A
134A
135A
+/- 11 3/8"
/8
Mm
Mm
E
C
A
B
8 10 12 13 149 11
EXAM
EXAM
123A
EXAM
123B
EXAM
123C
OFFICE
OFFICE
EXAM
EXAM
EXAM
132 OFFICE
133A
134A
135A
SCOPE OF CONSTRUCTION
OUT OF SCOPE
E
C
A
B
12 13 14 1516 1811
XRAY
BREAK
LOCKER
237B
CONFERENCE
240A
Room
A-001
SLOPESLOPE
S L O
P E
S L O
P E
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/3
/2
:5
:4
A
M C
U s e rs \l b y rd
\D o c u m e n ts \A
-2
-1
V
A F
W
A H
U lb y rd
V D
E K
F .r v t
A-101
FIRST AND SECOND FLOOR PLANS
4 4LB
REPLACE AHU'S AND
CONDENSING UNITS
2121 LAKE AVENUE
FORT WAYNE, IN 46805
JULY 5, 2022
100% CONSTRUCTION DOCUMENTS
610A4-21-20320-187
JB
A. ALL ROOF SURFACES WHERE WORK IS TO BE DONE
WILL BE PROTECTED THROUGHOUT CONSTRUCTION
WITH A PROTECTIVE SURFACE TO PREVENT ANY
PUNCTURES, RIPS, OR TEARS.
B. ALL NEW PENETRATIONS TO BE FULLY FLASHED,
CAULKED AND SEALED WITH STAINLESS STEEL FLASHING,
TERMINATOR STRIPS, OR TPO MEMBRANE FLASHING AS
REQUIRED BY MANUFACTURER'S STANDARD APPROVED
DETAILS.
C. FOR CONDITIONS NOT ILLUSTRATED IN THESE
DOCUMENTS AND SPECIFICATIONS, PROVIDE FLASHING
DETAILS MEETING MANUFACTURER'S APPROVED
METHOD OF WATERPROOFING PRIOR TO
CONSTRUCTION.
D. NEW EQUIPMENT CURBS TO BE INSULATED.
E. ALL PATCHING AND REPAIRING OF ROOF MEMBRANE
REQUIRED FOR CONSTRUCTION, USE SAME MATERIAL,
MANUFACTURER, AND ROOF SLOPE AS EXISTING ROOF
MEMBRANE AND INSULATION.
F. ALL AREAS OF ROOF THAT ARE PATCHED WILL NOT
BE PERMITTED TO ACCUMULATE WATER. "BIRD
PONDING" NOT PERMITTED.
G. ALL NEW PATCHES, SEAMS, AND MEMBRANE
FLASHING TO BE FULLY WELDED TO PREVENT WATER
INFILTRATION INTO THE BUILDING.
H. WATERTIGHT INTEGRITY OF BUILDING TO BE
MAINTAINED THROUGHOUT CONSTRUCTION. PROVIDE
INTEGRITY PLAN TO DESIGN TEAM AND COR PRIOR TO
CONSTRUCTION.
Scale: 1/8" = 1'-0"
FIRST FLOOR RENOVATION PLAN
Scale: 1/8" = 1'-0"
FIRST FLOOR ICRA PLAN
SCOPE OF WORK LEGEND
1 TYPE A PLASTIC SHEET BARRIER WITH ZIPPER
ACCESS.
2 WALKOFF STICKY MAT.
3 PROPOSED LOCATION OF HEPA FILTER, ROUTE
DUCT OUT WINDOW TO EXTERIOR, KEEP
WINDOW ASSEMBLY WATER TIGHT DURING
CONSTRUCTION.
4 WORK IN THIS AREA TO BE DONE OFF PEAK
HOURS (NIGHTS/WEEKENDS). COORDINATE
SCHEDULE WITH COR.
5 ALL EXISTING FURNITURE AND FINISHES
REMAINNG IN THE ROOM TO BE COVERED AND
PROTECTED FROM DAMAGE THROUGHOUT
CONSTRUCTION. GC RESPONISIBLE TO REPLACE
ALL FURNITURE AND REPAIR ALL DAMAGES TO
FINISHES RESULTINGFG FROM WORK IN THE
AREA.
6 EXISTING MECHANICAL, ELECTRICAL, PLUMBING ,
LOW VOLTAGE, FIRE PROTECTION, OR FIRE
ALARM DEVICES LOCATED BEHIND NEW CHASE
TO BE RELOCATED TO FACE OF NEW CHASE.
7 NEW CHASE WALL TO RECEIVE PAINTED FINISH
TO MATCH EXISTING ADJACENT SURFACES.
8 TEMPORARILY RELOCATE ALL FURNITURE AND
SYSTEM FURNITURE AND EQUIPMENT TO
PROVIDE ROOM FOR CONSTRUCTION ACTIVITIES.
ALL FURNITURE, SYSTEM FURNITURE, AND
EQUIPMENT TO BE PROTECTED THROUGHOUT
CONSTRUCTION ACTIVITIES. GC TO REINSTALL
ALL RELOCATED ELEMENTS AT THE END OF
CONSTRUCTION IN THIS SPACE.
9 REMOVE EXISTING WALL BASE ADJACENT TO
NEW CHASE. INSTALL NEW WALL BASE TO MATCH
EXISTING ON NEW CHASE WALL AND EXISTING
WALL. ALIGN TO EXISTING BASE.
10 ALIGN FINISH SURFACES FOR SMOOTH LIKE NEW
CONDITIONS.
11 PROTECT ROOF MEMBRANE THROUGHOUT
CONSTRUCTION.
12 NEW CRICKETS TO PROVIDE POSITIVE DRAINAGE
AWAY FROM EQUIPMENT CURB. SLOPE AT 1/4"
PER FOOT. FLASH AND FULLY WELD SEAMS WITH
EXISTING ROOF MEMBRANE. FULLY ADHERE TO
INSULATION BELOW.
13 TEMPORARILY REMOVE CEILING TILE AND GRID
IN THE REQUIRED WORK AREA TO ALLOW MECH.
WORK. RE-INSTALL TILE AND GRID (AND REPLACE
DAMAGED TILES AS REQUIRED) FOR A FINISHED
APPEARANCE AT PROJECT COMPLETION.
14 NEW EQUIPMENT RAILS TO MATCH LENGTH OF
NEW EQUIPMENT. VIF. CAP AND SEAL ALL ENDS,
SIDES AND TOP OF RAIL PRIOR TO HVAC
INSTALLATION.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
SECOND FLOOR ROOF PLAN
1 REMOVE AND SALVAGE PORTION OF CEILING AT
LOCATION OF NEW CHASE. USE SALVAGE GRID AND
TILE TO REINSTALL CEILING AROUND NEW CHASE.
FINISH CONDITION TO MATCH EXISTING CEILING.
TO BE INCLUDED IN DEDUCT ALTERNATE NO.1.
TO BE INCLUDED IN DEDUCT ALTERNATE NO.1.TO BE INCLUDED IN DEDUCT ALTERNATE NO.1.
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .