About this file
Summary of Attachment H - Scope of Work (North and Midtown Hubs)
This document is a Scope of Work attachment for a solicitation by the City University of New York (CUNY), Facilities Shared Services (FSS), for comprehensive maintenance and repair services of vertical transportation systems across the North and Midtown regional hubs. The North Region includes Lehman College, Hostos Community College, Bronx Community College, and Hunter College, while the Midtown Region comprises The City College of New York, Baruch College, Borough of Manhattan Community College, and John Jay College of Criminal Justice. The contract term is five years, commencing upon approval by the Attorney General and applicable state or city comptroller. The contractor must provide preventive maintenance labor including scheduled examinations, adjustments, cleaning, and lubrication of all machinery, with specific minimum monthly and quarterly requirements for hydraulic elevators (one hour monthly), traction elevators (two hours monthly), ADA wheelchair lifts and dumbwaiters (one hour per three months), escalators (six hours per three months), and vertical conveyors (three hours per three months). Services include 24-hour, seven-days-per-week maintenance and emergency response, with dedicated on-site mechanics during peak hours (7:00 a.m. to 4:00 p.m.) at five designated campuses.
The contractor must provide comprehensive repair, replacement, and adjustment services covering all component systems without additional cost, excluding only specified items such as car enclosures, underground hydraulic cylinders, and machine room power infrastructure. The contractor shall furnish all materials, labor, supplies, parts, equipment, and barricades necessary for maintenance procedures and must establish a central dispatch center with call-back response times of 15 minutes during peak hours and 30 minutes during off-peak hours. All work must comply with ASME 17.1/17.2 2022 A17.1 standards and applicable Authority Having Jurisdiction (AHJ) code requirements. The contractor is responsible for maintaining detailed work logs, monthly reports including entrapment and callback documentation, annual reports with statistics on callbacks and downtime, and correcting all violations cited by inspecting authorities. The pricing structure requires submission of hourly rates for regular-time work and identification of premium and overtime rates, with premium wage portions payable by CUNY upon receipt of properly documented bills.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment I North Hub Pricing Sheet.xls | XLS spreadsheet | |
| Attachment I Midtown Pricing Sheet.xls | XLS spreadsheet | |
| IFB FSS 06222026b North and Midtown.pdf | ||
| Midtown Hub Equipment List.xlsx | XLSX spreadsheet | |
| North Hub Equipment List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT H – SCOPE OF WORK
(NORTH AND MIDTOWN HUBS)
Background
The City University of New York (CUNY) Facilities Shared Services (FSS) provides centralized facilities support and maintenance services to campuses across New York City. As part of this solicitation, the participating campuses have been organized into the following geographic regions:
North Region: Lehman College, Hostos Community College, Bronx Community College, and Hunter College.
Midtown Region: The City College of New York (CCNY), Baruch College, Borough of Manhattan Community College (BMCC), and John Jay College of Criminal Justice.
The campuses included in this solicitation comprise a diverse range of facilities with varying operational requirements, building systems, and infrastructure.
These facilities include academic buildings, administrative offices, residence halls, athletic facilities, and other specialized campus environments that support the educational mission of the University.
Anticipated Contract Term
The Contract Term shall be for a period of Five (5) years, commencing upon approval of the Contract by the Attorney General and the New York State or New York City Comptroller, as applicable.
A. Preventive Maintenance Labor
1. The Contractor shall provide scheduled systematic examinations, adjustments, cleaning and lubrication of all machinery, machinery spaces, trusses for escalators, hoist ways and pits. The Contractor shall include the following minimums on site that are to be dedicated to routine preventive maintenance.
These are minimum requirements and in all cases the Contractor is responsible to provide the amount of time per device necessary to complete all tasks:
i. One hour per month per Hydraulic Elevator
ii. Two hours per month per Traction Elevator
iii. One hour per three-month period per ADA, Wheelchair Lift, and Dumbwaiter
iv. Six hours per three-month period per Escalator
v. Three hours per three-month period per Vertical Conveyor
2. The Contractor shall formulate its proposed schedule for the forthcoming month and/or quarter incorporating the "minimum" preventive maintenance requirements specified herein for all units. The schedule shall consist of the anticipated "out of service" times for each unit and the procedure to be performed. Deviations from this master schedule as desired by Contractor or mandated by other building and equipment conditions shall be reported to CUNY for approval.
3. When conditions warrant or CUNY requests a revised schedule be submitted for the balance of the year, the Contractor shall prepare same incorporating the record history of preventive maintenance procedures accomplished prior to the revision.
4. Prior to commencement of each site visit, the Contractor shall obtain a list of complaints or other recorded vertical transportation problems from the management representative for building services. Corrective actions shall be implemented based on the severity of the complaint, required extra work repairs and scheduled maintenance procedures as approved by CUNY or designee.
Prior to leaving each site visit, the Contractor shall review with CUNY or Designee the corrective action taken on each noted item. The Contractor shall provide a written report when requested.
5. The Contractor shall assign a manager’s representative(s) and manager's assistant(s) who shall be in charge of all Contractor personnel and services provided under this Project. The manager(s) shall have the overall responsibility on a 24-hour, seven days per week basis.
6. The Contractor's manager, assistant manager, superintendent, supervisor and/or foreperson shall each be authorized by the Contractor to receive and put into effect promptly all orders, directions, or other instructions from CUNY's designated representatives when they are in charge of operations at the building, provided such instructions do not adversely affect the Agreement nor the safe operations of the equipment or the Contractor's personnel and public safety. The Contractor's manager representative shall formulate a chain of command and time schedule for approval by CUNY representatives. During normal working hours, coordination of services shall be directed through an on-site representative or, when conditions warrant, a designated assistant.
Requirements for scheduling procedures, recording events, personnel employed, or other documentation shall be the responsibility of the designated Contractor's representative when the manager or his assistant is not on site or available to fulfill the mandated requirements.
7. The preventative maintenance specified herein is considered the minimum for all equipment. If specific equipment requires additional preventative maintenance for safe reliable operation, as specified by the manufacturer or by American Society of Mechanical Engineers (ASME) 17.1/17.2 2022 A17.1 standards, the Contractor shall perform the required additional preventative maintenance and all required testing without added cost to CUNY.
8. Any revisions of an agreed upon maintenance time schedule must have the prior written approval of CUNY. CUNY shall have the right to revise an established maintenance time schedule by giving the Contractor notice and at no additional cost to CUNY for work performed during regular working hours.
9. If for any reason CUNY managing agent notifies the Contractor that maintenance services are not allowed or required for any said month(s), the Contractor shall not be penalized for not performing their required hours.
B. Maintenance of Elevators, Wheelchair Platform Lifts, and Vertical Reciprocating Conveyors
The Contractor shall:
1. Use all reasonable care to keep the vertical transportation systems in proper, safe, and efficient operating condition, twenty-four hours per day, seven days per week, including legal holidays. The Contractor shall furnish all labor, materials, supplies, parts, equipment, temporary barricades, warning signs, and do all things necessary or proper for or incidental to such maintenance.
Maintenance hereunder shall be deemed to include such removal and replacement of equipment and materials as may be necessary or desirable to afford access to the equipment for maintenance or repair. All maintenance shall be at least in accordance with the provisions of law, as well as with governmental rules, regulations, and orders applicable. Whenever services are rendered, it will be the Contractor’s responsibility to contact CUNY to report the kind of service rendered.
2. Provide timely on-site mechanic.
3. Perform maintenance service for each vertical transportation system at the minimum frequencies indicated hereunder, subject to a time schedule submitted to and approved by CUNY, the Authority Having Jurisdiction (AHJ) code requirements and in accordance with ASME 17.1/17.2 2022 A17.1. The
"Schedule of Inspections, Checks and Services", indicates the minimum maintenance routines required to be performed. Preventative maintenance and/or testing procedures for vertical transportation equipment shall be performed on one (1) unit at a time within the same site during the normal working hours of Contractor as approved by CUNY.
4. Prior to commencement of services, formulate a schedule for the forthcoming year incorporating the "minimum" requirements specified herein for all units in a format developed in accordance with the mandated ASME 17.1/17.2 2022 A17.1 Maintenance Control Program. (MCP) For Cart conveyors, Plow lifts and other equipment that is not covered by ASME17.1/17.2 2022 A17.1, the Contractor shall formulate a schedule in accordance with manufacturer’s specifications and codes adopted by the AHJ for the specific equipment. In addition, a written MCP as outlined in A17.1 shall be provided to CUNY within ninety (90) days from the execution of a contract. This schedule shall consist of the anticipated "out of service" times for each unit and the procedure to be performed. The Contractor shall furnish the required outage time and duration prior to the equipment being removed from service. The schedule and associated downtime shall be confirmed and accepted by CUNY prior to commencement of the work. At no time shall a device be left offline for an extended period of time without prior approval from CUNY. Deviations from this master schedule as desired by Contractor or mandated by other Site and equipment conditions shall be reported to CUNY for approval. When conditions warrant or CUNY requests a revised schedule be submitted for the balance of the year, the Contractor shall prepare same incorporating the recorded history of preventative maintenance procedures accomplished prior to the revision.
5. Make at a minimum, the following scheduled inspections, checks, and services to each of the vertical transportation systems and all of their individual components, and at the indicated frequencies as further specified:
i. As Needed: Operate Vertical Transportation Systems: (From inside the car under normal operation.)
a. Check for any unusual noise or operation function.
b. Check floor stopping accuracy, leveling, pre-door opening.
c. Check alarm bell stop switch.
d. Check door protection operational appurtenances.
e. Perform necessary, immediate repairs and adjustments.
f. Check operating and signal equipment.
g. Check emergency communication system.
ii. As Needed: Machine Room and Secondary:
a. Observe controllers and relay panels. Check contactors for burning and wear. Inspect wiring and physical condition of components for deteriorations, heating, and contamination. Review hydraulic control valves and associated apparatus.
b. Motors and/or Generators - Check for proper lubrication of bearings. Inspect brushes and commutation with car in operation.
Check each unit for noise, vibration, overheating and clearances between rotating elements and poles.
c. Hoisting Machines and Brakes - Check all lubrication provisions, empty drip pans, and wipe down equipment. Observe worm gears for backlash and thrust play where applicable. Inspect brake components for wear and operation. Observe physical conditions in standing and operating modes.
d. Drive Sheaves and Wire Ropes - Observe physical conditions in standing and operating modes.
e. Overspeed Governor and Auxiliary Sheaves - Check for any unusual noise, vibrations, or other physical deteriorations.
f. Perform necessary immediate repairs and adjustments.
iii. Monthly (12 times per year)
a. Perform general inspection of machinery, traction motor, generator, brushes, gearbox, pulleys, brakes, governor, selectors, or floor controllers. Lubricate as required.
b. Empty drip pans, discard oil, check reservoir oil level, and add oil as needed.
c. Inspect and lubricate machinery, contacts, linkage, and gearing.
d. Clean and inspect the controller, selectors, relays, connectors, and contacts.
e. Ride the car and observe the operation of doors, leveling, reopening devices, and smoothness.
f. If rails are lubricated, check condition and lubrication. Service lubricators.
g. Check operation of all hoistway door interlocks.
h. Inspect all lighting associated with the vertical transportation systems, including, but not limited to pit lights, equipment room lights, shaft way lights, floor indication lights, car and hall station push button lights, interior and exterior direction lights, arrow lights, signal lantern lights, underfloor lights, cab, entrance, and roof lights.
Replace as needed. The Contractor shall repair all inoperative lights and so indicate in the checklist of the "Service Maintenance Form" specified hereinafter. Check all alarms and maintain them in proper working order. In addition, all car lighting, indicator, and other incandescent lighting is to be repaired within the first two months of the Term and every year thereafter.
i. Check fire service signals and operations and update the monthly testing log.
j. Remove litter, dust, oil, and other extraneous materials from all machine room equipment, door saddles, and other areas of the elevators not accessible from the elevator lobby.
k. Clean trash from pit and empty drip pans, discard oil. Examine plunger seals and correct excess leakage.
l. Confirmed that two-way communications are operable and clear communication to the call center designated by CUNY is functioning correctly within AHJ requirements.
iv. Quarterly (4 times per year)
a. Observe operation of vertical transportation systems throughout their full range and at all floors it serves to test controls, safety devices, leveling, re-leveling, and other devices.
b. Check door operation. Clean, lubricate and adjust brake checks, linkages, gears, wiring, motor, check keys, set screws, contacts, belts, chains, and cams.
c. Inspect the interior of the cab. Test telephone or communication system, normal and emergency lights, fan, emergency call system or alarm, miscellaneous hardware, control panel, and emergency lights.
d. Inspect hoist way and pit. Clean and lubricate equipment as required. Service guide rail lubrication.
e. Observe operation of motor, generator, brakes, governor, traction machinery, and sheaves.
f. Test the manual and emergency control applicable to systems.
g. Check oil level in car and counterweight oil buffers, oil hydraulic systems, add oil as required.
h. Visually inspect the controller, selector, contacts, and relays. Check adjustments and replace the contact as required.
i. Check hallway doors. Clean, lubricate, and adjust tracks, hangers and upthrust, eccentrics, linkage, gibs, and interlocks.
j. Clean, adjust and lubricate car door or gate tracks, pivots, hangers, car grille, and stile channels.
k. Correct all complaints and conditions recorded. Perform necessary immediate repairs and adjustments.
l. Operate Vertical Transportation Systems: (From inside the car under normal operations).
1. Check for any unusual noise or operational function.
2. Check floor stopping accuracy/leveling/pre-door opening.
3. Check alarm bell/stop switch.
4. Check door protection/operational appurtenances.
5. Check all operating and signal fixtures for illumination and audible functions.
6. Check interior ventilation provisions, emergency lighting, light controls, and auxiliary equipment.
7. Check and observe door operations. Inspect door alignment, guides, and closing pressure. Adjust door timing features as required.
m. Machine Room and Secondary:
1. Observe controllers and relay panels. Check contactors for burning and wear. Inspect wiring and physical condition of components for deterioration, heating, and contamination.
2. Service and calibrate seismic switch.
3. Check all controller resistance tubes, grids, and connections for obvious deficiencies
4. Remove controller fuses. Clean fuses and holders.
5. Inspect selector and/or encoder drive components and operating functions. Lubricate components per the Original Equipment Manufacturer (O.E.M.) specifications.
6. Inspect selector and/or encoder drive components and operating functions. Lubricate components per the O.E.M.
specifications.
7. Motors and/or Generators - Check for proper lubrication of bearings. Inspect brushes and commutation with the car in operation. Check each unit for noise, vibration, and heating.
Check brush tensioning and wear. Perform a visual inspection of armature, field coils, and interpole.
8. Windings, connections, leads, and commutator risers for physical deteriorations and damaged insulation.
9. Hoisting Machines and Brakes - Check all lubrication provisions, empty drip pans, and wipe down equipment.
Observe worm gears for backlash and thrust play. Inspect brake components for wear and operation. Check all machine component fastenings to include drive sheave and ring gear bolts, machine hold-downs, couplings, brake drum pulleys, isolation mounts, and covers. Inspect brake linings and drum surfaces.
10. Drive Sheaves and Wire Ropes - Observe physical conditions in standing and operating modes. Inspect the position of wire ropes in traction drive sheave grooves. Monitor rope slippage under normal operating modes. Inspect all speed monitoring and control apparatus.
11. Coded Belts - Observe physical conditions in standing and operating modes. Inspect the position of coated belts in traction drive sheave grooves. Monitor rope slippage under normal operating modes. Inspect all speed monitoring and control apparatus as outlined by the O.E.M. Ensure any coated belt monitoring device is functioning properly.
12. Overspeed Governor/Auxiliary Sheaves - Check for any unusual noise, vibrations, or other physical deteriorations.
Ensure seals and tags are properly affixed and legible.
Lubricate governor(s), selector drives, and auxiliary sheave components in accordance with O.E.M. specifications.
n. Car Top:
1. Clean, lubricate, and adjust the master door operator when conditions warrant. Adjust the clutch/vane to pick-up roller clearances.
2. Inspect car guides for wear and alignment. (Lubricate sliding shoe systems.) Adjust guide tensioning and observe operation.
3. Inspect the car and counterweight cable hitches. Replace worn or noisy rollers. Adjust the cab steadiers.
4. Inspect counterweight safety mechanism and component hitch connections.
5. Inspect counterweight derailment system.
6. Inspect counterweight assembly, alignment, and cable tensioning/wear.
7. Inspect door engaging equipment, car and shaft way door top track assemblies, safety interlock switches, and operating linkages for physical wear, dirt, or other deteriorations. Clean, lubricate, repair, and adjust systems when conditions warrant.
8. Observe the condition of upper slow-down, directional, and final limit switch devices.
9. Inspect wire rope or coated steel belt conditions and equalization at a minimum of six points in the shaft way.
10. Inspect hoist way landing, leveling, and encoding equipment for alignment, operation, and physical condition.
11. Inspect top of car operating station, emergency exit cover, work lighting, auxiliary safety switches, tapes, tape readers, and appurtenances.
o. Pit Area:
1. Clean and lubricate the governor tension sheave assembly.
Check weighted clearance. Inspect cable condition.
2. Observe the condition of buffer equipment and mountings, strikers, plates, switches, and blocking.
3. Check stop switch and lighting provisions. Inspect and service oil hydraulic return systems.
4. Inspect compensation equipment. Lubricate applicable component parts and check electrical or other safety provisions for physical deterioration.
5. Inspect bottom car guides for wear, alignment, and tensioning.
Replace worn or noisy rollers.
6. Inspect the bottom of the car, safety mechanisms, electrical traveling cables, and component hitch connections.
7. Observe the condition of bottom terminal slow-down, directional, and final limit switch devices, pit area, and remove all trash and debris.
8. Check counterweight run by clearance.
9. Inspect sump pump and piping.
p. Miscellaneous:
1. Check all indicating lights, lanterns, gongs, and audible and visible signals for proper operation.
2. Check all hall push buttons for proper operation.
3. Verify that mandated emergency operation testing has been performed per local law requirements, governing authority regulations, and as directed by CUNY.
4. Record all inspection and lubrication procedures completed in the machine room log and issue a copy of check sheets or other recorded data to CUNY with written recommendations for work procedures to be done by others or as an extra cost to CUNY by the Contractor.
5. Perform immediate repairs and adjustments. Notify CUNY and schedule major procedures necessitating extended out-of-service time within forty-eight regular working hours of the preventative maintenance inspection with CUNY prior consent and approval.
v. Semi-Annual (Two times per year)
a. Check all indicating lights, lanterns, gongs, and audible and visible signals for proper operation.
b. Inspect car-safety mechanism, clean and keep free of rust and dirt, and lubricate, as necessary.
c. Monitor the sequence of operation and compare the same to the O.E.M. design specification. Check and record individual car performance levels:
1. Door open cycle time.
2. Door close cycle time.
3. Long door non-interference dwell time.
4. Short door non-interference dwell time.
5. Reduced door non-interference dwell time.
6. Floor to Floor (Brake to Brake) time.
7. Brake-to-Brake (Flight) time.
8. Door closing pressure.
9. Speed up direction.
10. Speed down direction.
d. Check all fire control manual operations and signals to include Alternate Floor Recall.
e. Check all safety switches for doors, gates, or other passenger protection devices.
f. Ensure hoistway doors are properly aligned, set, and self-closing.
g. Check emergency cab interior lighting system and communication device operations.
h. Check car door locking, safety switches, and passenger protection for proper operation.
i. Observe elevator system operation for quality of ride, acceleration, deceleration, noise, and floor stopping accuracy. Preopening, re-leveling, or other operational features are checked from inside each car.
j. Perform immediate minor adjustments or repairs to maintain O.E.M.
performance standards.
k. Prepare a written report for all examinations performed and issue the same to CUNY.
vi. Annual (Once per year)
a. Check controllers and selectors. Clean with a blower, check alignment of switches, relays, timers, contacts, hinge pins, and other controller components, adjust, and lubricate. Check all resistance tubes and grids. Check oil in overload relays, settings, and operation of overloads. Clean and inspect fuses and holders, and all controller connections. Verify operation of Seismic Protection Systems, Emergency Evacuation Systems, and/or Battery Lowering and replace batteries, if needed.
b. In the hoistway, examine guide rails, cams and fastenings, hoist and governor wire ropes, and counterweight. Inspect and test limit and terminal switches. Check and adjust car shoes, gibs, or roller guides.
Adjust or replace as needed. Lubricate hoist wire ropes in accordance with ASME 17.1/17.2 2022 A17.1.
c. Clean all overhead beams, sills, bottom of platform, car tops, and hoistway walls.
d. Clean car light fixtures.
e. Thoroughly clean car and counterweight guide rails using a nonflammable or high flash point solvent to remove lint, dust, and excess lubricant in accordance with ASME 17.1/17.2 2022 A17.1 prevailing standards and/or AHJ requirements.
f. Thoroughly clean the machine room, pit, top and bottom of the car, and all other elevator system components and areas.
g. Dismantle machine brake assembly. Inspect all pivot pins, bushings, collars, sleeves, guides, bearings, or other operating apparatus for wear. Replace worn component parts, provide new spacers, washers, and fittings to ensure unrestrictive operation. Readjust assembly in accordance with O.E.M. design criteria.
h. Drain and flush machine housings, oil hydraulic storage tanks, bearings, and lubrication parts. Inspect all exposed equipment for wear. Replace worn or damaged bearings, seals, packings, and gaskets.
i. Blow out or vacuum windings in rotational equipment, inspect apparatus for internal damages, overheating, or other deteriorations.
Clean and service contaminated brush riggings, inspect bearings and shafts for wear. Apply insulating varnish to exposed windings and ensure all leads, connections, or other electrical apparatus are properly insulated. Inspect grounding provisions and take necessary actions to correct deficiencies. Adjust brush settings, compounding, and/or other apparatus to ensure proper operation and efficiencies are maintained.
j. Provide standby labor for emergency power testing, including full operational functions.
k. Record all Periodic Testing procedures completed under annual preventative maintenance program per ASME 17.1/17.2 2022 A17.1
Part 8 Standards and issue CUNY a report incorporating extraordinary repairs/adjustments necessary, suggested modifications, component upgrading, or other recommendations for improved safety, reliability, and performance.
l. Formulate a Master Maintenance Schedule (ASME 17.1/17.2 2022 A17.1 Part 8 Standards) for the forthcoming year, incorporating the "minimum" requirements specified herein for all units. The schedule shall consist of the anticipated "out of service" times for each unit and the procedure to be performed. Deviations from this master schedule as desired by the Contractor or mandated by other site and equipment conditions shall be reported to CUNY for approval. When conditions warrant or CUNY requests a revised schedule be submitted for the balance of the year, the Contractor shall prepare the same, incorporating the recorded history of preventative maintenance procedures accomplished prior to the revision.
m. Inspect cameras on elevators.
vii. Biennially (Every two years)
a. Drain, flush, and refill reservoirs on each hoisting machine if required.
b. Perform a thorough shaft cleaning.
viii. Triennially (Every three years)
a. If provided, each VVVF traction elevator battery backup leveling device’s battery shall be replaced and tested.
C. Maintenance of Escalators
The Contractor shall:
1. Use all reasonable care to keep the escalators and cart conveyors in proper, safe, and efficient operating condition, twenty-four hours per day, seven days per week, including holidays. The Contractor shall furnish all labor, materials, supplies, parts, equipment, temporary barricades, warning signs, and do all things necessary or proper for or incidental to such maintenance. The selection of parts, along with the extent and schedule of maintenance, should take operating conditions into account, including temperature and weather conditions. Maintenance hereunder shall be deemed to include such removal and replacement of equipment and materials as may be necessary or desirable to afford access to the equipment for maintenance. All maintenance shall be at least in accordance with the provisions of law, as well as with governmental rules, regulations, and orders applicable. Whenever services are rendered, it shall be the Contractor's responsibility to contact CUNY to report the kind of service rendered.
2. Maintain each escalator/Cart conveyor in proper adjustment for smooth, quiet operation. Escalator/Cart conveyors manufacturer's approved lubricants and cleaning materials or the equivalent approved by CUNY, shall be furnished by the Contractor.
3. Perform maintenance service for each unit at the minimum frequencies indicated hereunder, subject to a time schedule submitted to and approved by CUNY and the AHJ code requirements. The "Schedule of Inspections, Checks and Services" indicates the minimum maintenance routines required to be performed. Compensation for such maintenance routines shall be included in the Contract Sum. Any revisions of an agreed-upon maintenance time schedule must have the prior written approval of CUNY. CUNY shall have the right to revise an established maintenance time schedule by giving Contractor notice and at no additional cost to CUNY for work performed during regular working hours.
4. Make at a minimum, the following scheduled inspections, checks, and services to each of the escalators and cart conveyors and all of their individual components, and at the indicated frequencies as further specified:
1. Quarterly (4 times per year)
a. Ride and Observe
1. 1.Check all decking surfaces (panels, skirts, outer and inner decking) for protrusions and gaps. Remove and repair protrusions of 3/16 inch or greater.
2. Check that all anti-slide devices are present and securely attached. Replace and secure where required.
3. Verify that all side (skirt) brushes are intact and securely mounted. Replace and secure where required.
4. Listen for any unusual noise and feel for vibrations or roughness in the ride. Investigate and correct all defects.
5. With the escalator running, visually inspect all step treads and risers for defects and damage. Report defects and damages to the Contractor’s immediate supervisor and
CUNY.
6. Where ceiling intersection guards are provided, check for damage, and ensure Exhibit is securely mounted. Replace and secure as needed.
7. Check that the lighting above the escalator is adequate.
Correct as needed. Inform the Contractor’s immediate supervisor and CUNY if another department is needed to make the correction.
8. Verify that the demarcation, skirt, comb plate, balustrade, under handrail, and landing plate lights and covers at both landings are operating and clean. Clean light covers and replace defective bulbs as needed.
9. Verify that nothing is protruding below seven feet above the escalator, measured from the nose line of the steps and landing plates. Correct as needed. Inform the Contractor’s immediate supervisor and CUNY if another department is needed to correct.
b. Entrance and Egress
1. Check all decking surfaces (panels, skirts, outer and inner decking) for protrusions and gaps. Remove and repair protrusions of 3/16 inch or greater.
2. Verify there are “caution” signs on both sides of the upper and lower landings. Verify the “caution” signs are in good condition. Clean as needed. Replace any worn or damaged signs.
3. Clean the gap between the comb segments and the landing plate on the escalator.
4. While the escalator is running check that the steps are properly indexing, and the steps are engaging squarely with the combs. Repair and adjust as required.
5. Public Areas – These devices are exposed to various weather conditions and as such should be checked more frequently including but not limiting to the impact plates and supporting heaters. They should be cleaned and free of debris that may impact the operation.
c. Start / Stop Station
1. Check both the starting and emergency stop buttons stations for missing parts, defects, and damage. Repair and replace as needed.
2. Verify the escalator will start from either the upper or lower station.
3. Verify the escalator will stop when either emergency stop button is pressed.
4. Verify the escalator will start without a control set.
d. Handrail
1. Visually inspect the handrails for pinch points. Correct and repair as needed. Visually inspect handrail capping for cuts, cracks, and gouges. If damaged, inform Contractor’s immediate supervisor and CUNY.
2. Look for rubber filings on the balustrade. If filings are found, inspect further as this may indicate improper handrail tension. Adjust as needed.
3. From the lower landing firmly grip each handrail and verify that the handrail does not stall under moderate force. If either handrail stalls, adjust handrail traction.
4. While riding the escalator, verify that the handrails are traveling smoothly and at substantially the same speed with the steps, without jerking and hesitation. Correct and repair as needed.
5. Visually inspect the handrail inlet devices. Verify that the handrail inlet brushes are securely mounted and are in good condition. Tighten and replace if defective damaged.
e. Housekeeping
1. Check machine space for any water infiltration.
2. Ensure the equipment in the machine space is protected from the elements.
3. Perform an annual clean down and as required by code.
4. Clean upper and lower pans.
f. Broken Main Drive Chain Device
1. Verify that the lever pad or roller is in good condition and moves freely. Check that the chain guard is present and securely fastened. Verify that the broken main drive chain switch device activates and stops the escalator when the arm drops. Verify that the escalator will start only when the arm is returned to its normal position and a controller reset is made. Adjust the switch as needed.
g. Gear Reducer / Handrail Transmission
1. Check the oil levels in the external and internal gearboxes and handrail transmissions. Add oil if needed.
2. Check gear and transmission cases for oil leakage and excessive vibration, noise, and heat. Record all defects and damages in the maintenance log and inform Contractor’s immediate supervisor and CUNY.
3. Check that the oil is not milky white, burnt, rancid, or foaming excessively. Record all defects in the maintenance log and inform Contractor’s immediate supervisor and CUNY.
4. Examine sprockets for tooth wear and coupling engagement. Inform Contractor’s immediate supervisor and CUNY.
h. Motor Speed Monitor
1. If applicable, check that the four inductive sensors are clean and are surely mounted to the holding device installed between the brake unit and gear case. Verify the sensors wires are securely connected and are in good condition. Clean sensors. Repair damaged wires and secure all connections. Where displayed, record motor speed on the maintenance check sheet.
i. Controller
1. With the escalator running visually inspect escalator controller components. Look and listen for excessive arcing, signs of excessive heat, and sounds of excessive noise (chatter, humming).
2. Verify that components are working as designed. Correct all items, as needed.
3. With the escalator running, measure and record main line currents and phase-to-phase and phase-to-ground voltages.
4. With the power removed inspect the escalator controller for loose wire connections and for wire damage. Tighten, repair, and replace when needed.
5. Verify that the main line and controller fuses are the same value as recorded on the escalator print.
j. Lubrication
1. Fill the automatic oiler reservoir to operating level.
2. Where no automatic oiler is provided, manually lubricate all chains.
3. Visually verify the automatic oiler is operating as designed. Correct and repair as needed.
4. Visually check all chains are being lubricated. Correct
5. and Repair as needed.
k. Machine Brakes
1. If applicable, Internal Primary: Verify that the brake lining has a minimum thickness of 3mm and that the brake lining and the brake surface are free of oil and grease.
Check that all wires are in good condition and the connections are secured. Clean, correct, and repair as needed.
2. If applicable, External Primary: Verify that the brake pad clearance is .5mm. Check that all brake surfaces are free of oil and dirt. Check that all wires are in good condition and the connections are secured. Clean, correct, and repair as needed.
l. Safety Brake (Smart Brake)
1. If applicable, check fluid level in the smart brake reservoir; add fluid if needed. Examine and clean sensors, pump unit, solenoids, and gauges. Verify that all wires are in good condition and are securely fastened.
Verify that the safety brake is operating as designed when the broken main drive chain device is actuated.
Verify that the escalator will not run until a controller reset is made. Visually check the brake system stops the escalator within 12 to 18 inches.
2. If applicable, check fluid level in the smart brake reservoir; add fluid if needed. Examine and clean sensors, pump unit, solenoids, and gauges. Verify that all wires are in good condition and are securely fastened.
Verify that the safety brake is operating as designed when the broken main drive chain device is actuated.
Verify that the escalator will not run until a controller reset is made. Visually check the brake system stops the escalator within 12 to 18 inches.
m. Main Drive Chain
1. 1.Check the adjustment of the main drive chain; verify it is properly tensioned. Adjust as needed.
2. Examine all sprockets and chain for wear. Inform Contractor’s immediate supervisor and CUNY if defective and/or damaged.
n. Carriage
1. Verify that the carriage moves freely, and the steps are engaging the comb segments squarely. Remove enough steps to give a clear view of the carriage and finger tracks.
2. Examine the tracks and carriage springs for defects and damage. Inform Contractor’s immediate supervisor and CUNY if any defects and/or damage are found.
3. Clean lower pan, tracks, and switches.
4. Remove the tension on both carriage springs.
5. Move the carriage back and forth. Verify that it is free of obstacles and that it moves smoothly without binding and dragging.
6. Verify that the finger tracks stay engaged throughout carriage movement.
7. Lubricate and grease carriage (rails) tracks and bearings.
8. Compress both carriage springs to the same manufacturer’s specifications. Record actual measurement in the space provided on the checklist sheet.
9. Place the broken step chain monitors to the correct tripping position. Trip each monitor. Verify that the escalator does not start until the monitors and controller are manually reset.
10. Reinstall the steps.
11. While the escalator is running, check that the steps are properly indexing, and the steps are engaging squarely with the combs. Repair and adjust as required.
12. Verify that the threaded carriage rods are at a right angle to the bearing blocks. Adjust as needed.
o. Inspection Operation
1. Run the escalator in both directions in inspection mode.
Verify that the escalator is operating as designed.
p. Comb
1. Check that all comb segments are in good condition, are securely fastened, and there are no missing screws. Tighten and replace as needed.
2. Replace all broken comb segments and those comb segments with two back-to-back broken teeth.
3. Verify that the gap between the comb segments and the landing plate is free of dirt and debris. Clean as needed.
4. While the escalator is running, check that the steps are properly indexing and that the steps are engaging squarely with the combs. Repair and adjust as required.
5. Verify that the comb stops functions as designed: Remove the inner decking panel above the comb stop switch (upper landing right side at lower landing left side).
6. Remove the center comb segment and lay a piece of flat stock on the center part of the step tread.
7. Place a pry bar under the comb plate frame angle near the step entrance and apply force to move the plate up.
8. Observe the comb stop switch mechanism to ensure cam rotation occurs as the comb plate is lifted up. Clean and lubricate all pivot points.
9. Verify that the escalator will not run when the cam rotation opens the normally closed contacts on the comb stop switch.
10. Verify that the escalator will run when the comb plate is returned to the correct position. Note: a control reset is not needed.
11. Clean the gap between the comb segments and the landing plate.
12. Remove the floor plate and comb segments. Inspect theTeflon strip; verify it is intact and in good condition.
13. Move the actuating rod horizontally. Check that the rod via the linkage actuates the switch and the normally closed contacts open. Clean and lubricate all pivot points.
14. Replace the outer (end) comb segments and screws. Set the screws to a torque setting 1.75nm. Replace thinner (center) comb segments and screws. Set these screws to a torque setting of 3.25nm.
q. Demarcation / Landing Lights
1. Verify that the landing, comb plate, balustrade, under handrail and demarcation lights are operating and are visible at both landings. Clean all light covers and replace defective bulbs.
r. Step Sag / Step Level Device
1. With steps removed and on inspection mode, move the opening to the step sag switch. Verify that the switch will trip if the step riser sags 3mm on the load side or lifts 3mm on return side. Clean and lube the moveable mechanical arms, pivot points, and switches. Verify that the escalator will not start until a manual controller is made.
s. Step Up Thrust Device
1. Lift the ends of each up thrust track; check that they move freely and return to their normal resting position without binding. Verify that each switch trips after 1mm of vertical movement is made. Check that the vertical clearance between the dog ear brackets and the upthrust track is 3mm.
Clean and lubricate all pivot points. After each switch is tripped, verify that the escalator will not start until a manual controller reset is made.
t. Skirt Monitor / Skirt Obstruction Devices
1. Check for a 3mm clearance between the step and skirts throughout the length of the escalator. Verify that the escalator will not start when a 2 mm feeler gauge is inserted between any of the switch actuators and the inner side of the skirt panel (repeat for all skirt switches). Verify that the escalator will not start until a manual controller reset is made.
u. Missing Step Switch
1. Verify that the proximity sensor is securely fastened and clean. Inspect all wiring and switch functioning. With the escalator off inspection mode, run the escalator with a step removed. Verify that the missing step switch shut the escalator off. Verify that the escalator will start only with the step-in place and when a controller reset is manually made.
2. With the escalator on inspection mode and a step removed, verify that the step roller is center of the step edge. Verify that the mechanical switch is securely fastened and clean.
Clean and lubricate all pivot points. Inspect all wiring for fraying and secure connections. With the escalator off inspection mode, run the escalator with the step removed.
Verify that the missing step switch shuts the escalator off.
Verify the escalator will only start when the step is replaced, and a manual controller reset is made.
v. Step-Band Locking Device
1. If applicable, check that the step band locking device is tightened and secure. Verify that the escalator will not start when the step band locking device is engaged. Clean and lubricate arm and pivot points.
w. Pit
1. Clean the lower pan and pit floor.
2. Verify that the sump pump is working as designed. Repair as needed.
x. Broken Step Chain Monitoring Device
1. Depress the broken step chain switch actuator until switch trips. Verify that the switch is working by trying to start the escalator. If the switch is working properly, the escalator will not start.
2. Verify that the escalator will start only when the broken step device is in the correct position and a manual controller reset is made.
3. Check for broken and loose wires. Repair, replace, and tighten as needed.
4. Verify that the switch lobe (actuator Roller) is centered in actuating indentation.
2. Semi-Annual (Two Times Per Year)
a. Handrail
1. Visually inspect the handrail guides on the load and return sides for defects and damage. Correct and repair as needed.
2. Inspect handrail drive systems: newel sheaves, rubber bands, and pressure rollers for defects and damage.
Correct, repair, and adjust as needed.
3. Clean and lubricate all pivot points and linkages and grease all bearings.
a. Broken Handrail Monitors
1. Verify the escalator will not start until the lever is in the correct position and a manual controller reset is made. Clean and lubricate lever pivot points.
c. Handrail Speed Monitors
1. 1.Verify that the handrail speed monitoring device immediately sounds when the handrail stalls or a speed deviation of 15% between the handrail and step occurs for two or more seconds. Verify the escalator will not start until a manual controller reset is made. Check that the monitor roller is in good condition and free of residue buildup, and that it is making firm contact with the handrail. Repair or replace as required. Where handrail speed is displayed, record the same on the maintenance sheet.
d. Handrails, Inlets, Brushes, and Devices
1. Check that the handrail inlet device will stop the escalator when the lever moves and the switch is actuated. Correct and adjust as needed.
2. Verify that the escalator will not start until a manual controller reset is made. Clean and lubricate pivot points.
e. Broken Step Chain Monitoring Device
1. If applicable, verify that the springs on both sides are compressed to the same manufacturer specification. Correct and adjust as needed.
2. Verify that the escalator will not start when either broken step chain monitor device is tripped.
f. Tracks
1. Inspect track systems, load, and return sides. Look for defects and damage. Correct and replace as needed.
2. Check for missing and loose track bolts. Replace and tighten all track bolts.
3. Verify that the tracks are properly aligned and are spaced to the manufacturer’s specifications. Correct as needed.
g. Step Band Rollers/Wheels
1. Inspect all rollers/wheels for defects, damage, and wear.
Replace defective and damaged rollers/wheels.
h. Step Inspection
1. Visually verify that the step threads and “A”-frame bolts are not missing and are secured. Replace missing and tighten all step thread and “A”-frame bolts as needed.
2. Check for missing and loose step connection bolts. Replace missing and tighten step connecting bolts as needed.
3. Check for missing tab washers. Verify that the tab washers are peen over the step connecting bolts heads. Replace and peened tab washers as needed.
4. Visually inspect steps for defects and damage. Correct, repair, and replace defected and damaged steps. Inform Contractor’s immediate supervisor and CUNY if steps cannot be repaired or replaced.
i. Lubrication Lines
1. Verify that the oil and grease lines are free of kinks and are properly connected and securely fasten. Correct, repair, and replace as needed.
D. Repair, Replacement, Adjustment, and Related Service Coverage The Contractor shall:
1. Provide fully comprehensive repair, replacement, adjustment, and related service coverage for all component systems including spare or replacement parts unless specifically excluded herein. Failure to provide a particular component, service or other procedure does not limit Contractor's obligation or liability to provide the necessary work or service.
2. Perform complete maintenance of all elevator devices to ensure they may be operated safely in accordance with performance standards and other criteria specified in this agreement. Coverage shall be for twenty-four hours per day, seven days per week except for scheduled preventative maintenance and safety test procedures approved by CUNY.
3. Furnish all materials, labor, supplies, parts, equipment barricades, warning signs, semi-permanent structures, or other apparatus necessary or proper for and incidental to maintenance procedures.
4. Be responsible for clearing and paying for any violations and fines related to the Equipment. Violations shall be cleared within the time limits imposed by the AHJ.
5. Be responsible for keeping the exterior of the machinery and any other parts of the equipment free from rust.
6. Cover all associated parts, apparatus and procedures whether specifically defined or not and shall include the necessary hoisting, rigging or other procedures required for execution of the repair, replacement, adjustment, and service of equipment. The following list of equipment is provided as a means to establish the full comprehensive intent:
i. Automatic door systems, power-operated door systems, and manual door/gate systems complete:
a. Power operator and engagement linkages
b. Car door top track and hanger roller assemblies.
c. Car doors and gate, eccentrics, stops, bumpers, and related operating mechanisms for multiple speed or multiple panel doors and gates.
d. Car gates, bottom guides, retainers, fire stops, gibs, entrance sills and threshold plates, gate handles, and protection guards.
e. Electrical safety switches and activation mechanisms, door protective and/or retracting devices, and power door operators.
f. Electromechanical safety interlock assemblies, related operating mechanisms, clutch, vane, or other master system engaging devices, linkages, zoned locking devices, and self-closing devices.
ii. Car frame, platform, and car safety devices complete:
a. Crosshead, stiles, hitch plates, anti-spin devices, tie rods, supports, and related structures.
b. Car guides, car rollers, shoes, stands, spindles, gibs, rollers and tensioning devices.
c. Sub-platform, under car platform fireproofing, car sills with support cradles, load weighing devices, top/side exit access operating/safety hardware, cab steadiers and electrical switches.
d. Car fans, blowers, and cab ventilation systems.
iii. Hoisting machinery, and rotating power drives with mounting supports and beams, raised platforms and weighted foundations and structures complete:
a. Geared traction and winding drum units, gearless traction, and related systems complete.
b. Worms, gears, shafts, couplings, drive sheaves, deflector sheaves, 2:1 sheaves, bearings, support/mounting apparatus, brake assembly, rotating elements and all associated castings, guards, retainers, and hardware.
c. Integral and free-standing brake units, drums, discs, pulleys, shoes, linings, pads, pins, sleeves, plungers, coils, caps, adjustment devices and hardware complete.
d. AC and DC motors, motor generators, rotating regulators, and exciters; armatures, field coils, pole pieces, interpoles, commutators, brush riggings, brush holders, carbon brushes, stator windings, fan or other ventilation mechanisms, bearings, bushings, shafts, caps, packings, seals, junction boxes, leads, connectors and related wiring.
iv. Controls, selectors, solid state power drives, encoding devices, transformers with related wiring, conduit, and circuitry complete.
a. Relays, contactors, switches, capacitors, resistors, fuses, circuit breakers, overloads, power supplies, regulators, tach generators, arc shields, shunts, holders, and hardware.
b. Circuit boards, transmitters, encoders, transformers, rectifiers, transistors, solid state switching devices, insulators, timing devices, suppressors, and computer apparatus devices to include software, software upgrades, monitors, keyboards, touch screens/pads and printers.
c. Filters, fans, blowers, control cabinet air conditioning, wiring, studs, terminal blocks, plug connectors, system monitors and other diagnostic devices.
d. Cabinets, frames, isolation pads, isolation transformers, chokes, diagnostic tools, status indicators, solid state, and hard-wire circuitry.
e. Verify operation of Emergency Evacuation Systems annually and/or Battery Lowering and replace batteries, if required.
v. Car and counterweight safety systems
a. Overspeed governors and electromechanical safety devices, wire ropes and tensioning devices with related hitch and connection apparatus complete.
b. Car and counterweight safety devices, drums, rods, linkages, clamps, and hardware.
c. Rope grippers and similar apparatus used for compliance with ASME 17.1/17.2 2022 A17.1 Rule 2.19.
vi.