Attachment G Price Schedule Breakdown Sheet - 1 page.pdf
PDF 366 KB Posted
- Solicitation number
- 36C26325B0003
About this file
This is a Price Schedule Breakdown Sheet for project #437-24-105 "Correct AWE Boiler Plant Findings" at the Fargo VA Health Care System. The template provides a structured format for contractors to submit detailed cost breakdowns across multiple construction divisions.
The breakdown is organized into three main sections with subtotals: General Building Construction (Divisions 1-14), Mechanical and Electrical (Divisions 21-28), and Site Improvements (Divisions 31-34). Each section contains relevant division categories like General Requirements, Concrete, HVAC, Electrical, and Utilities. The form requires contractors to enter base project costs for each division, calculate subtotals, and add profit and overhead to arrive at a proposal grand total. A miscellaneous section is included for contractors to identify any additional costs not covered in the standard divisions.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Breakdown Sheet Project Title: Correct AWE Boiler Plant Findings Project Number: 437-24-105 Contractor:
Division # Division Title Base Project 1 General Requirements 2 Existing Conditions 3 Concrete 4 Masonry 5 Metals 6 Wood, Plastics and Composites 7 Thermal and Moisture Protection 8 Openings 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 14 Conveying Equipment Subtotal General Building Construction $
21 Fire Suppression 22 Plumbing 23 Heating, Ventilating and Air Conditioning 25 Integrated Automation 26 Electrical 27 Communications 28 Electronic Safety and Security Subtotal Mechanical and Electrical $
31 Earthwork 32 Exterior Improvements 33 Utilities 34 Transportation Subtotal Site Improvements $
Miscellaneous (Contractor shall identify any costs included)
Subtotal All Divisions & Miscellaneous (if any) $ Profit Overhead Proposal Grand Total $
File details come from the government source that posted it. Updated .