36C26325B0003 0002.docx
DOCX document 47 KB Posted
- Solicitation number
- 36C26325B0003
About this file
This is Amendment 0002 to solicitation 36C26325B0003, issued by the Department of Veterans Affairs Network 23 Contracting Office in St. Paul, MN, effective January 8, 2025. The amendment provides answers to questions posed during a site visit for a boiler plant construction project at the Fargo VA Health Care System.
The amendment clarifies technical requirements including: insulation must be restored to original condition after weld-o-let installations; X-ray weld inspections are not required but certified welders must perform all header welds; the use of door end switches is acceptable for auxiliary combustion air requirements instead of outdoor air dampers; and detailed specifications for turbine water flow sensors are provided, including operating conditions of 125 psig, 30-250°F temperature range, and 0.5-40 feet per second velocity range. A site visit sign-in sheet is attached to the amendment.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 01-08-2025 437-25-1-6602-0003 437-24-105 36C263 Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul
MN
55101 Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul
MN
55101 To all Offerors/Bidders
36C26325B0003 12-12-2024
X X X See Solicitation X The purpose of this amendment is to:
A. Publish the answers to the questions posed after the site visit.
B. Publish the sign-in sheet from the site visit (Attached).
////LAST ITEM////
Zachary Koutz Contracting Officer
VA-VHA-RPOC-2024-0073
1. Existing header instrumentation and condensate piping is not insulated. Please verify new piping for temperature and pressure stations is not required to be insulated. If insulation is required, please provide insulation specifications.
The requirement is that any current insulation on the header and piping is returned to its original condition once the weld-o-lets are added. On the areas that Insulation will have to be removed to add the weld-o-lets and we want the piping re-insulated after the work is completed
2. Please verify if X-Ray procedure/inspection is required for weld-o-lets added to steam header supply piping for installation of temperature and pressure stations. If yes, will the VA provide these services or are they the responsibility of the installing contractor?
X-ray weld inspections are not necessary, but a certified welder is required for all welds on the header.
3. A large auxiliary outdoor air damper is required to meet the minimum combustion air requirements (9600 CFM). Because many of the VA steam plants are treated as historical, often the use of man doors and end switches is allowed for auxiliary combustion air. The south double door near the tool bench measures 70"x94.5" and could be utilized as auxiliary plant air with minimal potential for pipe freeze damage but is double the size that we need. The main door near the boiler operator office is also an option. An outdoor air louver with actuator would also not be conditioned air. We propose adding end switches to prove the door or doors are in the open position and would interlock with the boiler flame safeguard safety circuit. This has been performed at other VA facilities. Will this be accepted as a solution?
We are fine with this. It would be the easiest way to meet the requirement.
4. In spec section 25 10 10 page 9 paragraph D. Turbine flowmeters #1 “flowmeter shall be as specified in Section 23 09 23 “water flow sensors” paragraph. However, there are only (2) spec sections, 22 05 19 Meters and gauges for plumbing piping and 25 10 10 Advanced utility metering system. Please advise.
Turbine Water Flow Sensors: shall be insertion turbine type with turbine element, retractor and preamplifier/transmitter mounted on a two-inch full port isolation valve; assembly easily removed or installed as a single unit under line pressure through the isolation valve without interference with process flow; calibrated scale shall allow precise positioning of the flow element to the required insertion depth within plus or minus minute 1 mm (0.05 inch); wetted parts shall be constructed of stainless steel. Operating power shall be nominal //24 VDC// or //24 Volt AC//. Local instantaneous flow indicator shall be LED type in NEMA 4 enclosure with 3-1/2 digital display, for wall or panel mounting.
Performance characteristics:
Ambient conditions: -40 degrees C to 60 degrees C (-40 degrees F to 140 degrees F), 5 to 100 percent humidity.
Operating conditions: 850 kPa (125 psig), 0 degree C to 120 degrees C (30 degrees F to 250 degrees F), 0.15 to 12 meters per second (0.5 to 40 feet per second) velocity.
Nominal range (turn down ratio): 10 to 1.
Preamplifier mounted on meter shall provide 4-20 mA or 0-10 VDC, a divided pulse output or switch closure signal for units of volume or mass per a time base. Signal transmission distance shall be a minimum of 1,800 meters (6,000 feet). // Preamplifier for bi-directional flow measurement shall provide a directional contact closure from a relay mounted in the preamplifier //.
Pressure Loss: Maximum 1 percent of the line pressure in line sizes above 100 mm (4 inches).
Ambient temperature effects, less than 0.005 percent calibrated span per degrees C (degrees F) temperature change.
RFI effect - flow meter shall not be affected by RFI.
Power supply effect less than 0.02 percent of span for a variation of plus or minus 10 percent power supply.
(See spec section 23 09 23 above)
And VA requirements below
See attached document: S04 Site Visit Sign In Sheet.