Attachment_G_-_Price_Schedule_2025.1.14.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- CNC Production Router (Second Posting)
- Solicitation number
- 2000016469
- Issued by
- Blue Earth County, Minnesota
About this file
This is a price schedule (Attachment G) for RFP Event #G0210-2000016469 for a Computer Numerical Control (CNC) Router system. The schedule outlines six primary line items including: one CNC Production Router System, technical support, online training, initial facility training, additional on-site training, and basic training courses for two people, all as specified in Attachment F.
The pricing format is structured with unit price and extended price columns, with vendors required to provide pricing for each line item and a total sum. Delivery charges must be included in equipment pricing, and taxes should be excluded. The schedule also requests vendors to specify a percentage discount off manufacturer list price for repair parts and provide additional pricing for optional on-site training and support/maintenance, including trip charges and hourly labor rates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C-1170_Attachments_A-E_CNC_R2.docx | DOCX document | |
| C-1170_RFP_CNC.docx | DOCX document | |
| C-1170_addendum1.docx | DOCX document | |
| CNC_Production_Router_(Second_Posting).pdf | ||
| C-1170_Attachment_F_updated_2025.1.14.xlsx | XLSX spreadsheet | |
| C-1170_Sample_Contract_and_Exhibits_CNC_AAY.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT G - PRICE SCHEDULE
RFP EVENT #G0210-2000016469/CNC Router
Any delivery charges are to be included in equipment pricing below. Do not include tax in your prices.
| Description | Quantity | Unit Price | Extended Price | |
| 1 | Computer Numerical Control (CNC) Production Router System as specified in Attachment F | 1 | $0.00 | |
| 2 | Technical Support as specified in Item 16 of Attachment F | 1 | $0.00 | |
| 3 | Online Training as specified in Item 17 of Attachment F | 1 | $0.00 | |
| 4 | Intitial Facility Training as specified in Item 18 of Attachment F | 1 | $0.00 | |
| 5 | Additional On-Site Training as specified in Item 19 of Attachment F | 1 | $0.00 | |
| 6 | Basic Training Courses for 2 as specified in Item 20 of Attachment F | 1 | $0.00 |
TOTAL $0.00
Repair parts: Discount off Mfg. List _____________%
Options: Additional on-site training and support/maintenance as needed - List pricing for this in the spaces below, including but not limited to trip and hourly labor charges.
File details come from the government source that posted it. Updated .