ATTACHMENT G- Mandatory Requirements Checklist RFP final.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Kentucky Historical Society - POS/CRM System RFP
- Solicitation number
- RFP 758 2000000153 5
- Issued by
- Elliott County, Kentucky
About this file
This document is a Mandatory Requirements Checklist for RFP 758 1900000153, establishing the compliance framework for proposal submissions. The checklist is divided into two primary sections: Section 30, which contains 25 mandatory requirements (Sections 30.1 through 30.5), and Section 50, which contains an extensive list of mandatory requirements (Sections 50.6 and subsections A1 through A22, B1 through B26, C1 through C4, and E1 through E21). Offerors must indicate compliance with each mandatory requirement by responding "YES" to demonstrate conformity. Proposals that fail to satisfy all mandatory requirements will be deemed non-responsive and will not be considered for award. Attachment O must be submitted concurrently with the Technical Proposal.
The checklist establishes a binary compliance framework where offerors select either "YES" or "NO" for each listed requirement. The document does not provide specific details regarding pricing terms, set-asides, funding amounts, or contract duration, as these elements are contained within the referenced RFP sections rather than in this checklist itself. This mandatory requirements checklist serves as a gatekeeping mechanism to ensure only responsive proposals advance in the evaluation process.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT G MANDATORY REQUIREMENTS CHECKLIST - RFP 758 1900000153 | ||
| Offeror shall indicate compliance with each mandatory requirement by responding YES. Proposals that do not meet all mandatory requirements shall be deemed non responsive and shall not be considered. Attachment O must be submitted with the Technical Proposal. | ||
| YES | NO | |
| SECTION 30 MANDATORY REQUIREMENTS | ||
| Section 30.1 | ||
| Section 30.2 | ||
| Section 30.3 | ||
| Section 30.4 | ||
| Section 30.5 | ||
| Section 30.6 | ||
| Section 30.7 | ||
| Section 30.8 | ||
| Section 30.9 | ||
| Section 30.10 | ||
| Section 30.11 | ||
| Section 30.12 | ||
| Section 30.13 | ||
| Section 30.14 | ||
| Section 30.15 | ||
| Section 30.16 | ||
| Section 30.17 | ||
| Section 30.18 | ||
| Section 30.19 | ||
| Section 30.20 | ||
| Section 30.21 | ||
| Section 30.22 | ||
| Section 30.23 | ||
| Section 30.24 | ||
| Section 30.25 | ||
| SECTION 50 MANDATORY REQUIREMENTS | ||
| Section 50.6 | ||
| Section 50.6 A1 | ||
| Section 50.6 A3 | ||
| Section 50.6 A4 | ||
| Section 50.6 A5 | ||
| Section 50.6 A6 | ||
| Section 50.6 A7 | ||
| Section 50.6 A8 | ||
| Section 50.6 A9 | ||
| Section 50.6 A10 | ||
| Section 50.6 A13 | ||
| Section 50.6 A14 | ||
| Section 50.6 A15 | ||
| Section 50.6 A16. | ||
| Section 50.6 A19 | ||
| Section 50.6 A20 | ||
| Section 50.6 A21 | ||
| Section 50.6 A22 | ||
| Section 50.6 B1 | ||
| Section 50.6 B2 | ||
| Section 50.6 B8 | ||
| Section 50.6 B11 | ||
| Section 50.6 B12 | ||
| Section 50.6 B13 | ||
| Section 50.6 B14 | ||
| Section 50.6 B14a | ||
| Section 50.6 B14b | ||
| Section 50.6 B14c | ||
| Section 50.6 B15 | ||
| Section 50.6 B19 | ||
| Section 50.6 B20 | ||
| Section 50.6 B21 | ||
| Section 50.6 B24 | ||
| Section 50.6 B25 | ||
| Section 50.6 B26 | ||
| Section 50.6 C1 | ||
| Section 50.6 C2 | ||
| Section 50.6 C4 | ||
| Section 50.6 E1 | ||
| Section 50.6 E2 | ||
| Section 50.6 E3 | ||
| Section 50.6 E4 | ||
| Section 50.6 E5 | ||
| Section 50.6 E6 | ||
| Section 50.6 E7 | ||
| Section 50.6 E8 | ||
| Section 50.6 E9 | ||
| Section 50.6 E10 | ||
| Section 50.6 E11 | ||
| Section 50.6 E12 | ||
| Section 50.6 E13 | ||
| Section 50.6 E14 | ||
| Section 50.6 E15 | ||
| Section 50.6 E16 | ||
| Section 50.6 E17 | ||
| Section 50.6 E19 | ||
| Section 50.6 E21 |
File details come from the government source that posted it. Updated .