Attachment G - CDR.pdf
PDF 234 KB Posted
- Solicitation number
- 36C78625Q0086
About this file
This document is a Contract Discrepancy Report (CDR) template designed to formally document and resolve contract performance issues. The template provides a structured format for identifying, reporting, and tracking discrepancies between a contractor and the government, with sections for describing the problem, capturing dates, obtaining contractor and government responses, and ultimately closing out the issue. Key instructions include generating a unique report number, detailing the specific discrepancy with reference to the Performance Work Statement (PWS), documenting corrective actions proposed by the contractor, and allowing for government evaluation and resolution of the identified problem.
The instructions outline a detailed process for completing the CDR, including specifying the base contract number, generating a unique tracking number, identifying relevant parties, recording critical dates, providing a concise explanation of the discrepancy, and ensuring proper signatures from the Contracting Officer's Representative (COR), Contracting Officer (CO), and contractor representative. The document emphasizes the importance of cross-referencing the discrepancy to specific contract sections, proposing corrective measures, and potentially initiating a cure notice if the issue cannot be satisfactorily resolved.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DISCREPANCY REPORT
1. CONTRACT OR AGREEMENT NUMBER: 2. REPORT NUMBER FOR THIS DISCREPANCY:
3. TO: 4. FROM:
5. DATES
a. DISCREPANCY IDENTIFIED: b. CDR DELIVERED/RECEIVED: c. INITIATE CORRECTIVE ACTION:
6. DISCREPANCY OR PROBLEM: (Describe in detail. Include reference to PWS section; use attached continuation sheet(s) if necessary.)
7. SIGNATURE OF COR: DATE:
8. SIGNATURE OF CONTRACTING OFFICER: DATE:
9a. TO: 9b. TITLE:
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable Quality Control Plan procedures or new procedures. Use attached continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE: DATE:
12. GOVERNMENT ACTIONS. (Acceptance, partial acceptance, rebuttal. Use attached continuation sheet(s) if necessary.)
13. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, rebuttal. Use attached continuation sheet(s) if necessary.)
14. CDR CLOSE OUT. (Following successful resolution of contract discrepancy(ies).)
ACKNOWLEDGEMENT: TO THE BEST OF MY KNOWLEDGE AND BELIEF - INITIALS DATE
a. CONTRACTOR: (I accept that appropriate corrective actions and close out remedies where employed.)
b. COR: (I accept that appropriate corrective actions and close out remedies where employed.)
c. CO: (I accept that the parties worked cooperatively to correct the discrepancy(ies).)
Attachment G: Contractor Discrepancy Report
INSTRUCTIONS FOR COMPLETION:
1. State the base contract or agreement number for which task/delivery orders are being issued against.
This includes agency awards which contain either A, C, or D in the numbering convention (e.g. VA118 16 C 0001) as well as VA FSS or NAC BPAs. This also includes MAS, GWACs, and other agency MACs authorized as either assisted acquisition or direct acquisition by another agency.
2. Generate a unique report number to track each CDR, using the current order number which contains F or J; or definitive contract number which contains C, followed by the initials ‘CDR’ and then a sequential number, as the official numbering convention (e.g. [VA118 16 F 0202]CDR 0001).
3. Print name of the Prime Contractor Company.
4. Print name of the division/department/party affected by the discrepancy.
5. Pertinent dates, (a) when was the discrepancy first identified, (b) when was the CDR delivered to the Contractor POC for their review/comment, and (c) after delivery of the CDR when does the Program Office require corrective actions to commence. (Note: The CDR is considered to be received by the Contractor at time of delivery).
6. Provide a concise yet vivid explanation of what the discrepancy is. Cross reference the discrepancy to the corresponding PWS, PRS and/or QASP sections in discrepancy.
7. COR signs, certifying delivery of the CDR.
8. CO signs, certifying notification of CDRs delivery.
9. Responsible Contractor POC name and title (e.g. ProgramManager, CEO, etc.).
10. The Contractor POC narrative explanation as to what, in their view, caused the discrepancy along with the proposed corrective measures.
11. The Contractor POC signs, certifying responsibility for correcting the CDR.
12. In the event there is shared responsibility for causing the discrepancy, the Government must also state actions it will take concurrent with Contractor actions, otherwise this is not applicable. (Note:
Government actions will be initiated commensurate with the date established at block 5(c).)
13. After corrective actions have been taken, evaluate whether actions had an impact in being able to resolve the discrepancy. In the event corrective actions are long term in scope, evaluate whether proposed actions provide adequate assurance of being able to resolve the discrepancy. For any matter that is not able to be resolved, the Program Office shall initiate steps for issuance of a cure notice.
14. Upon successful resolution of the discrepancy, or after determining that either a cure notice or stop work order is required, the CDR shall be acknowledged as a closed action.
File details come from the government source that posted it. Updated .