Attachment B - Statement of Work - NMC Pacific.pdf
PDF 220 KB Posted
- Solicitation number
- 36C78625Q0086
About this file
This Statement of Work details off-site inscription services for marble niche covers at the National Memorial Cemetery of the Pacific. The contract covers the period from October 1, 2025 through September 30, 2026, with four one-year optional extensions through September 30, 2030. The contractor will be responsible for performing off-site inscription services on government-furnished marble niche covers measuring 15 ¾" x 11 ¼" x ¾", including pickup, inscription, packaging, and delivery back to the cemetery.
Key requirements include completing normal deliveries within 10 calendar days, handling expedited deliveries for fallen service members at no additional cost, and maintaining strict quality assurance standards. The contractor must provide weekly status reports, maintain detailed records, and be subject to government quality inspections. The unit pricing will be all-inclusive and remain consistent regardless of the number of characters inscribed, covering the entire process from blank niche cover pickup to inscribed cover delivery at the cemetery's destination in Honolulu, Hawaii.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B – Statement of Work – NMC Pacific
STATEMENT OF WORK
1. Introduction
1.1 Background
The Department of Veterans Affairs (VA), National Cemetery Administration (NCA) furnishes headstones, markers, and niche covers (monuments) for deceased veterans worldwide. Memorial monuments are also furnished to memorialize veterans whose remains are non-recoverable.
1.2 Purpose
The purpose of this contract is to perform Off-Site Inscription Services on government furnished marble niche covers for National Memorial Cemetery of the Pacific.
1.3 Definitions
Words Used Interchangeably – Niche covers, markers, headstones blank covers and monuments.
Disposal – demolished or pulverized into small pieces with no portion of the inscription remaining legible and subsequent removal. Contractor would be responsible for any inscribed monuments under an on-site inscription contract. Cemetery is responsible for any inscribed rejects that are delivered to the Cemetery, i.e., Nationwide contracts, niche cover inscriptions, but at Contractor expense.
Replacement-in-Kind – The replacement of a government-furnished headstone, marker, or niche cover with one that resembles the original design (i.e., form, size, inscription font, emblem of beliefs, etc.), as closely as possible, within current contract specifications.
Security – Cemetery or on-site Contractor is responsible for storing monuments and equipment thus, preventing theft or damage due to vandalism.
Protection – Monuments should not be stored where they are subject to damage from the weather, i.e., stored inside a building or covered with a tarp or other protective material.
FOB – Free on Board
FOB Destination – Cemetery takes delivery of goods being shipped to it by the Contractor once the goods arrive at the Cemetery or when existing headstone/marker or niche cover located at the cemetery has been inscribed.
FOB Origin – Contractor’s obligation to deliver the product ends with loading of inscribed headstone/marker(s) onto a government transportation vehicle at the Contractor’s facility. A separate contract with a transportation company covers the headstone/marker delivery.
1.4 FOB Destination
National Memorial Cemetery of Pacific 2177 Puowaina Drive Honolulu, HI 966813-1729
• I1 – NICHE COVER, MARBLE, INSCRIPTIONS (15 ¾” x 11 ¼” x ¾”) Drawing: A-NCIS-1 & 2, Rev C dtd 2019-08-05
2. General Requirements
2.1 Scope of Work
This contract shall include all labor and materials necessary for offsite inscription services of government furnished I1 marble niche covers as noted in section 1.
2.2 Location of Services
Off-Site Contractor facility to perform Inscription Services on government furnished marble niche covers for National Memorial Cemetery of the Pacific
2.3 Performance Period
This contract covers the period from October 1, 2025 through September 30, 2026 with four (1) year options to extend the term of the contract through September 30.2030.
2.4 Contractor Responsibilities
The Contractor shall be responsible for providing all labor and material needed to manufacture, inscribe, package, palletize, and deliver completed niche covers to the cemetery FOB destination, inscriptions on Government Furnished blank marble niche covers.
The Contractor is responsible for pick-up and packaging to prevent damage during shipment and returning niche covers to the cemetery. The cemetery is responsible for making blank niche covers available to the Contractor and is not responsible for packaging the blank niche covers.
The Contractor must regularly pickup blanks from the cemetery to ensure work is completed within the required performance period. The Contractor is not responsible for unwrapping, uncrating, or installing completed niche covers. The Contractor must give the cemetery designated representative at least 24 hours’ notice for niche cover pick up or delivery.
2.5 Government Furnished Property
The Contractor shall be responsible for:
• The security and protection of Government Furnished Property provided to the Contractor in connection with this contract.
• Disposal of scrapped monuments at the Contractor’s location.
• Rejected and scrapped monuments (government blanks) shall be recorded on the weekly status report and submitted to MPSProgSupport@va.gov.
3. Pricing
3.1 Unit Price
The unit price is all-inclusive and covers the completed monuments delivered FOB destination.
The same unit price shall apply regardless of the total number of characters inscribed. The unit price shall be the total price paid for each niche cover inscribed by the Contractor meeting technical requirements as shown in the referenced drawings, FOB Destination to include pickup of blank niche covers from the cemetery and the return of inscribed niche covers.
3.2 Completion Point for Invoicing products delivered (FOB Destination) mailto:MPSProgSupport@va.gov
The Contractor’s responsibilities are deemed complete when satisfactorily prepared orders are delivered to the ordered destination.
4. Delivery Performance and Destination
4.1 Delivery Location
National Memorial Cemetery of Pacific 2177 Puowaina Drive Honolulu, HI 966813-1729
4.2 Normal Delivery
All inscriptions, except for those identified for accelerated delivery, ordered under this contract shall be completed within ten (10) calendar days following the date the order was sent by MPS.
4.3 Expedited and KIA Deliveries
It is the goal of NCA to ensure the grave of active-duty service members who die because of enemy action is marked on the day of interment. The Government will provide the inscription to the Contractor with not less than (2) calendar days advance notification and advise the Contractor when the inscription needs to be completed and delivered. All inscriptions identified as an accelerated delivery shall be provided at no additional cost to the government for the accelerated processing.
4.4 FOB Destination Responsibilities
The transportation for the product produced and shipped to consignees is the responsibility of the Contractor.
NOTE: If there is a noticeable trend of damaged shipments caused by a specific transportation carrier or driver, MPS will recommend that the carrier be eliminated as one of the Contractor’s carriers.
5. Material Specifications
5.1 Description of Products
• I1 – NICHE COVER, MARBLE, INSCRIPTIONS (15 ¾” x 11 ¼” x ¾”)
Drawing: A-NCIS-1 & 2, Rev C dtd 2019-08-05
6. Order Processing and Management
6.1 Order Receipt and Processing
Contractors shall provide a single email address for electronically receiving orders. MPS shall distribute orders electronically to the Contractor’s provided email address Monday through Friday. Contractors shall manufacture and ship individual orders on a first-in/first-out basis.
Each order for Normal Delivery shall be produced in numerical sequence based on the shipment number.
6.2 Normal Delivery
The Contractor shall have (10) business days, excluding federal holidays, as counted from the date following the day an order is sent to the Contractor until the monuments are produced and made available to the cemetery for receiving inspection and acceptance (FOB Destination).
6.3 Accelerated Deliveries
All headstones identified for accelerated delivery (sometimes called ten (10) day specials) shall be moved to the front of the production queue but behind any previous orders flagged as 10-day specials. The Contractor shall provide this service for accelerated production at no additional cost beyond the standard unit cost offered by the vendor.
6.4 Replacement In-Kind (RIK)
The intent is to replicate all or part of a preexisting inscription. In-kind replacements are stated in the remarks box or the last line of the inscription and must be provided at no additional cost. MPS will provide a photo to the Contractor to ensure the replacement inscription reflects the original headstone, contact MPS for a photo if not received.
6.5 Order Cancellations
Cancellations shall be emailed to the Contractor from the MPS Program Support Unit only within one (1) calendar day from the order. The Contractor shall confirm cancellations within one (1) business day.
7. Product and Workmanship
7.1 Product
The Contractor shall inscribe all information as contained on the monument order.
The end or limit of each line shall be indicated on a line-by-line basis as shown on the order. If any deviation from this is encountered, contact the MPS Program Support Unit at MPSProgSupport@va.gov.
7.2 Inscription Specifications and process
Inscriptions shall be made using an air blast abrasion method. The inscription shall be a depth consistent with the technical drawing and conform to the character and dimensions of letters, numbers, and emblems shown in the technical drawings. Inscription layouts shall conform to scenarios in the contract drawings.
7.3 Lithochrome Application
All orders shall state “ADD LITHICHROME” or “NO LITHICHROME” in the Remarks box or on the last line of the inscription whether lithichrome is required or not. If lithichrome is applied, it shall be N4 or lower as judged against the Munsell Neutral Value Scale, Matte (31-step scale).
E-mail MPSProgSupport@va.gov for clarification on any order without lithichrome instructions.
7.4 Quality of Workmanship
Each monument shall be free from defects in workmanship.
• Chips, cracks, open seams, or abraded edges shall not be permitted
• Repair or patching of any such defects is prohibited and shall cause rejection.
• Monuments shall be free of ink, oil, crayon marks, dirt, coatings, sealers, and stone dust.
• Inscriptions shall be free from defects due to broken or blown-out lettering.
• Notify MPSProgSupport@va.gov of any poor-quality government furnished blanks by type and do not use.
8. Packaging
8.1 Packaging Materials and Banding
Monuments must be packaged to meet industry standards and commercial best practices, ensuring acceptance by common carriers. Avoid colored or staining materials (e.g., uncoated cardboard, certain wood types) that could discolor the stone during storage.
8.2 Single Packaging
Use two-part cartons of double-wall corrugated board for single monument packaging. The front and back of the carton should fully cover and protect at least half of each surface. Secure cartons with ½” plastic banding or 2” filament tape. Ensure proper packaging to prevent damage during multiple shipments and handling, using stringers or runners to allow safe handling with forklifts or hand trucks.
8.3 Labeling
The front and back of each individual package or on each side shall be labeled with the words, HANDLE WITH CARE, in one-inch-high red letters. Commercial labels may be used.
8.4 Replacement of Damaged Monuments
The Contractor shall replace monuments at no additional cost to the Government if damage is incurred during transport. The MPS Program Support Unit will notify the Contractor of damaged headstones within five business days, and the Contractor shall replace them within ten calendar days of notification.
9. Quality Assurance (QA) Inspections
9.1 Government QA Inspections
Quality assurance (QA) inspections of the Contractor’s manufacturing facility and products may be performed by the designated COR of the Memorial Programs Service to assure satisfactory contract performance. The Government reserves the right to inspect the quality of blanks and the inscription process without prior scheduling or notifications to the Contractor.
9.2 Site Inspections Areas of Assessment
During each QA visit at production sites, a complete assessment of the Contractor’s operation will be made, to include the following areas:
• Packaging and palletizing of product that promotes damage-free shipments and compliant with all contractual requirements.
• Execution of quality control procedures.
• Maintaining QA records as required, with the records indicating the quality of the headstones as shipped.
9.3 Contractor Assistance
When at the Contractor’s production facility, the Contractor shall assist the designated COR by providing adequate, well lighted inspection area and personnel for assistance lifting, handling, and moving product.
10. Quality Assurance System
10.1 Required Documentation
The Contractor must develop and maintain a written inspection system that documents the quality and timeliness of finished products.
10.2 Weekly Status Reports
Weekly reports must be emailed to MPS at MPSProgSupport@va.gov, attention to the designated COR by the close of business, Tuesday of the next week. Should this day fall on a holiday, the report must be submitted no later than the next business day. Each report must include the following information:
• Date order was received.
• Obligation number
• Shipment numbers
• Decedent’s Name
• Destination
• Date shipped.
• Carrier’s name
• Carrier’s tracking number
• Quantity of orders shipped.
• Items damaged during transport and subsequently destroyed.
• Quantity of orders pending
• Estimated ship dates for pending orders.
• Number of orders cancelled.
• Late orders
• Quantity of scrapped blanks.
Report delinquencies and any issues that may cause delinquencies with a remedy and resolution date upon discovery to.
10.3 Contractor Files
The Contractor shall maintain records and files of all documents relating to each order filled under each Government Headstone and Marker contract. These records shall include, at minimum, copies of all orders, quality assurance records, inspection results, shipping documents (bearing carrier’s name and PRO tracking numbers) and invoices. These records shall be made available, upon request, to the designated MPS Program Support Unit COR during on-site Quality Assurance inspections.
10.4 Drawings and References
The Contractor shall ensure copies of all relevant Government drawings for production of monuments are maintained on file and are available to the designed COR, upon request, during on-site Quality Assurance inspections.
Description: Letters, Fonts, Numbers and Other Characters (3 Drawings) Drawing number: A-LFN & OC-1, Rev C dtd 2016-6-13, A-LFN & OC-2, Rev C dtd 2016-6-13, and A-LFN & OC-3, Rev C dtd 2016-6-13
Description: Niche Cover, Inscription Scenarios (2 Drawings) Drawing number: A-NCIS-1, Rev C dtd 2019-08-05, and A-NCIS-1, Rev C dtd 2019-08-05
Description: Emblems of Belief – Specifications (7 Drawings) Drawing number: A-EM Cover Page, Rev P dtd 2021-10-14, A-EM-1, Rev I dtd 2017-12-23, A- EM-2, Rev H dtd 2017-12-23, A-EM-3, Rev H dtd 2017-12-23, A-EM-4, Rev H dtd 2017-12-23, A-EM-5, Rev L dtd 2021-04-13, and A-EM-6, Rev P dtd 2021-10-14
11. Quality Assurance Complaints
11.1 Handling Damages and Quality Issues
The receipt of complaints concerning unsatisfactory quality or non-compliance with the contract specifications shall be considered reason for an immediate visit and review of the Contractor’s quality assurance program. The Government reserves the right to inspect 100% of the production for an indefinite period due to quality problems.
11.2 QA/Inspection Acceptance Criteria
Cemetery personnel are responsible for a final inspection and acceptance of the completed monuments utilizing the Monument Order Acknowledgement Report (MOAR).
11.2.1 Use of Appendix B
Cemetery personnel will be responsible for completing Appendix B – Transfer of Government- Furnished Headstones, Markers or Niche Covers form (NCA Handbook 3320), stating the quantity of blanks for each type that has been inspected for pick-up by the Contractor. A copy of Appendix B should be included in the shipment, a copy retained by the cemetery and a final copy emailed to the Contractor and MPS.
11.2.2 Use of Appendix C
The Contractor will be responsible for completing Appendix C – Completion of Inscription Service(s) form. The Contractor will complete the top portion of the form, the quantity of monuments, and shipment numbers of monuments completed. The Contractor will provide cemetery staff the completed Appendix C.
11.2.3 QA/Inspection
Government Provided Blanks Once a return shipment is received, Cemetery personnel are responsible for a final inspection and acceptance of the completed monuments utilizing the Monument Order Acknowledgement Report (MOAR). Any rejects will be noted on the form (Appendix C) and the cemetery inspector will sign and date for the cemetery.
11.2.4 Acceptance Criteria
The cemetery will be responsible for emailing a copy of the Appendix C form, to the MPS COR, which will be used when certifying invoices for payment by the Contractor.
11.3 Deficiency Notification and Resolution
The designated COR or a designated inspector for this contract will inform the Contractor of the deficiencies. The inspecting COR and the COR will generate a site inspection report and discuss with the Contractor what corrective action(s) shall be taken and the correction completion time frame. If a quality or contract performance issue cannot be resolved between the Contractor and the Government, the Contracting Officer will make a final determination as to whether the monument shall be replaced at the Contractor’s expense or the Government’s expense.
11.4 Timeliness and Delivery Performance
The Government will monitor Contractor performance through routine inspections, documented observations, and Contracting Officer’s Representative (COR) oversight. Upon identification of a performance deficiency, the COR will verbally or in writing notify the Contractor. The COR will record the issue, date/time of observation, and Contractor notification. This notice provides an opportunity for immediate correction. If deficiencies persist or are significant, the Contracting Officer (CO) will issue a Contract Discrepancy Report (CDR). The Contractor shall respond within three (3) calendar days, providing an explanation and a corrective action plan. The CO will review the response and determine next steps. Following a CDR, the CO may convene a meeting with the Contractor and COR. The Government will document the discussion and circulate meeting minutes. If the Contractor disagrees with the minutes, objections shall be submitted in writing within three (3) calendar days. The CO will respond in writing with a final determination. Upon acceptance of a corrective action plan, the Contractor will have seven (7) calendar days to implement it. Continued deficiencies may lead to further remedies in accordance with FAR 52.212-4, up to or including termination for cause or default. Performance issues resulting from Government error, Government delay, or Acts of God will not be attributed to the Contractor.
12. Procedures and Government Responsibilities
12.1 Coordination Between Government and Contractor: The administration of the contract will require coordination between the Government and the Contractor.
The Contracting Officer’s Representation (COR) is the Point of Contact (POC) for normal communication and notification of events impacting the Contractor’s operations.
12.2 Designation of Contracting Officer’s Representatives (CORs) The Contracting Officer will provide, at the time of the contract’s award, the name of one or more individuals authorized to act as Contracting Officer’s Representatives (CORs) during the coordination.
12.3 Government Points of Contact (POC)
E-mail to: MPSProgSupport@va.gov
End of Statement of Work