NFSR 270 - Cerro Pelado

B M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

0.000 BOP I-sect NFSR 10 & NFSR 270. Begin Road

Reconditioning. Beginning of Project.

0.001 CMP 1 24" CMP, Maintain

0.050 CCC 1 18" Culvert, Maintain using hand tools. Protect.

0.093 CMP 1 24" CMP, Maintain

0.143 CMP 1 24" CMP, Maintain

0.196 CMP 1 24" CMP, Maintain

0.256 CMP 1 36" CMP, Maintain

0.323 CMP 1 24" CMP, Maintain

0.448 CMP 1 24" CMP, Maintain

0.478 CMP 1 24" CMP, Maintain

0.550 CMP 1 18" CMP, Maintain

0.611 CMP 1 24" CMP, Maintain

0.653 CMP 1 24" CMP, Maintain

0.756 CMP 1 24" CMP, Maintain

0.822 CMP 1 24" CMP, Maintain

0.866 CMP 1 24" CMP, Maintain

0.947 CMP 1 24" CMP, Maintain

0.991 CMP 1 24" CMP, Maintain

1.019 INT I-sect right, NFSR 270/270CG/270B

1.102 INT I-sect right, NFSR 270CA

1.105 CMP 1 24" CMP, Maintain

1.106 1.155 CY, DIT 259 60 Reconstruct ditch left, 60 CY Spot Gravel.

1.155 CMP 22 Install 24" x 22' L CMP, Downhill on NFSR 270CA.

1.159 1.170 CY 20 20 CY Spot Gravel

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

Description of Work NFSR 270 1

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

NFSR 270 - Cerro Pelado

1.236 CMP, CY 10 Remove/Dispose 24" x 22' L CMP, 20 CY Backfill, 10 CY Spot Gravel.

1.246 R/D 1 Reconstruct.

1.275 R/D 1 Reconstruct.

1.283 CMP 26 Remove/Replace 24" x 26' L CMP.

1.284 1.292 DIT 42 Reconstruct ditch left.

1.296 SLP Repair slump. ~10 CY.

1.314 R/D 1 Reconstruct.

1.315 1.337 DIT 116 Reconstruct ditch left.

1.338 CMP, CY 40 Remove/Dispose and Replace 24" x 40' L CMP, 20 CY Backfill.

1.339 1.436 DIT 512 Reconstruct ditch left.

1.437 CMP 1 24" CMP, Maintain

1.480 1.517 DIT 195 Reconstruct ditch left.

1.518 CMP 26 Remove/Replace 24" x 26' CMP.

1.547 R/D 1 Reconstruct.

1.561 CMP 24 Remove/Replace 24" x 24' L CMP.

1.576 CMP 1 24" CMP, Maintain

1.613 R/D 1 Reconstruct.

1.631 R/D 1 Reconstruct.

1.632 1.646 DIT 74 Reconstruct ditch left.

1.663 C/G 1 Maintain.

1.680 INT Intersection.

1.695 CMP 24 Install 24" x 24' L CMP.

1.708 1.727 DIT 100 Reconstruct ditch left.

1.729 R/D 1 Reconstruct.

Description of Work NFSR 270 2

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

NFSR 270 - Cerro Pelado

1.730 1.767 DIT, CY 195 40 Reconstruct ditch left, 40 CY Spot Gravel

1.778 R/D 1 Reconstruct.

1.779 1.815 CY, DIT 190 40 40 CY Spot Gravel, Reconstruct ditch left.

1.824 CMP 36

48" x 36' L CMP, Install w/ 20 CY Rip Rap and 20 CY Backfill.

1.838 R/D 1 Reconstruct.

1.839 1.871 DIT 169 Reconstruct ditch left.

1.876 R/D 1 Reconstruct.

1.877 1.900 DIT 121 Maintain ditch left.

1.901 R/D 1 Reconstruct.

1.930 CMP, CY

Relocate 36" x 24' L CMP, 40 CY Backfill, Reshape embankment. COR to stake location.

1.931 1.948 DIT 90 Reconstruct left.

1.949 R/D 1 Construct.

1.950 1.983 DIT 174 Reconstruct left.

2.001 CMP 1 24" CMP, Maintain

2.050 CMP 28 Remove/Replace 24" x 28' L CMP.

2.077 CMP 36 Install 36" x 36' L CMP.

2.078 2.096 DIT 95 Reconstruct left.

2.107 R/D 1 Reconstruct.

2.147 CMP 1 24" CMP, Maintain

2.148 2.166 DIT 95 Reconstruct left.

2.217 CMP 26 Remove 18" x 26' L, Replace w/ 36" x 26' L.

2.220 2.252 DIT 169 Reconstruct left.

2.261 R/D 1 Reconstruct.

Description of Work NFSR 270 3

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

NFSR 270 - Cerro Pelado

2.285 CMP 1 18" CMP, Maintain

2.303 R/D 1 Reconstruct.

2.323 R/D 1 Reconstruct.

2.366 R/D 1 Reconstruct.

2.405 CMP 1 18" CMP, Maintain

2.422 R/D 1 Reconstruct.

2.423 2.486 CY 60 60 CY Spot Gravel.

2.493 R/D 1 Reconstruct.

2.525 R/D 1 Reconstruct.

2.549 CMP 1 18" CMP, Maintain

2.550 2.575 DIT 132 Reconstruct left.

2.581 R/D 1 Reconstruct.

2.582 2.657 CY 40 40 CY Spot Gravel.

2.813 R/D 1 Reconstruct.

2.848 R/D 1 Reconstruct.

2.886 R/D 1 Reconstruct.

2.943 R/D 1 Reconstruct.

2.987 R/D 1 Reconstruct.

3.016 CMP 1 24" CMP, Maintain

3.017 3.112 DIT 502 Reconstruct left.

3.120 R/D, CY 1 Construct, 10 CY Backfill.

3.164 CMP 1 18" CMP, Maintain

3.165 3.213 DIT 253 Reconstruct left.

3.217 R/D 1 Reconstruct.

3.265 R/D 1 Recontruct.

Description of Work NFSR 270 4

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

NFSR 270 - Cerro Pelado

3.277 CMP 1 18" CMP, Maintain

3.297 INT I-sect left. Reconstruct 0.25 mile, 60 CY Backfill, Reconstruct Ditch, Reshape to drain.

3.358 CMP 1 18" CMP, Maintain

3.359 3.380 DIT 111 Reconstruct left.

3.382 R/D, CY 1 Construct, 10 CY Backfill.

3.383 3.423 CY 20 20 CY Spot Gravel.

3.424 R/D 1 Reconstruct.

3.480 CMP 40 Remove/Replace 36" x 40' L CMP.

3.510 R/D 1 Reconstruct.

3.542 R/D 1 Reconstruct.

3.577 R/D 1 Reconstruct.

3.588 R/D 1 Reconstruct.

3.623 R/D 1 Construct w/ Lead-out and Ditch.

3.864 CMP 1 36" CMP, Maintain

3.910 R/D 1 Reconstruct.

3.950 CCC 1 18" CMP, Maintain using hand tools. Protect.

3.951 3.978 DIT 143 Reconstruct ditch left.

3.979 R/D 1 Reconstruct.

4.007 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.008 4.046 DIT 201 Reconstruct ditch left.

4.054 R/D 1 Reconstruct.

4.055 4.101 DIT 243 Reconstruct ditch left.

4.107 R/D 1 Reconstruct.

4.108 4.142 DIT 180 Reconstruct ditch left.

Description of Work NFSR 270 5

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

NFSR 270 - Cerro Pelado

4.149 R/D 1 Reconstruct.

4.309 R/D 1 Reconstruct.

4.310 4.330 DIT, CY 106 Reconstruct ditch left, 30 CY Backfill.

4.343 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.369 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.391 R/D 1 Reconstruct.

4.445 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.443 R/D 1 Reconstruct.

4.444 4.503 DIT, CY 312 Reconstruct ditch left. 30 CY Backfill.

4.506 R/D 1 Reconstruct.

4.535 SLP Slope Stabilization. 30 CY Backfill.

4.567 R/D 1 Reconstruct.

4.613 R/D 1 Construct.

4.626 4.727 CY 60 60 CY Spot Gravel.

4.715 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.728 R/D 1 Reconstruct.

4.729 4.767 DIT 201 Reconstruct ditch left.

4.768 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.769 4.785 CY 20 20 CY Spot Gravel.

4.780 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.786 R/D 1 Reconstruct.

4.793 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.816 R/D, CY 1 Construct. 10 CY Backfill.

4.817 4.836 DIT 101 Reconstruct ditch left.

4.837 CCC 1 18" CMP, Maintain using hand tools. Protect.

Description of Work NFSR 270 6

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

NFSR 270 - Cerro Pelado

4.838 4.864 DIT 137 Reconstruct ditch left.

4.865 CCC 1 18" CMP, Maintain using hand tools. Protect.

4.866 4.909 DIT 227 Maintain ditch left.

4.910 R/D 1 Reconstruct.

4.942 4.946 CY 60 60 CY Spot Gravel.

5.010 R/D 1 Reconstruct.

5.011 5.070 CY 60 60 CY Spot Gravel.

5.071 R/D 1 Reconstruct.

5.072 5.110 CY 30 30 CY Spot Gravel.

5.111 R/D 1 Reconstruct.

5.112 5.140 CY 20 20 CY Spot Gravel.

5.150 CCC 1 18" CMP, Maintain using hand tools. Protect.

5.144 R/D Reconstruct w/ Lead-out ditch.

5.145 5.190 CY 40 40 CY Spot Gravel.

5.192 R/D 1 Reconstruct w/ Lead-out ditch.

5.193 5.241 CY 40 40 CY Spot Gravel.

5.215 CCC 1 18" CMP, Maintain using hand tools. Protect.

5.241 CCC 1 18" CMP, Maintain using hand tools. Protect.

5.242 R/D 1 Reconstruct w/ Lead-out ditch.

5.243 5.295 CY 60 60 CY Spot Gravel.

5.291 CCC 1 18" CMP, Maintain using hand tools. Protect.

5.320 CCC 1 18" CMP, Maintain using hand tools. Protect.

5.350 CCC 1 18" CMP, Maintain using hand tools. Protect.

5.351 R/D 1 Reconstruct w/ Lead-out ditch.

Description of Work NFSR 270 7

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

NFSR 270 - Cerro Pelado

5.352 5.391 CY 60 60 CY Spot Gravel.

5.392 R/D 1 Reconstruct w/ Lead-out ditch.

5.486 R/D 1 Reconstruct w/ Lead-out ditch.

5.487 5.545 CY 60 60 CY Spot Gravel.

5.546 R/D 1 Reconstruct w/ Lead-out ditch.

5.547 5.587 CY 40 40 CY Spot Gravel.

5.588 R/D 1 Reconstruct w/ Lead-out ditch.

5.599 CY 30 30 CY Spot Gravel.

5.627 R/D, CY 1 60 Construct w/ Lead-out ditch. 60 CY Spot Gravel.

5.628 5.753 CY 100 100 CY Spot Gravel.

5.754 INT Communication Tower left.

5.755 5.802 CY 30 30 CY Spot Gravel.

5.839 CY 20 20 CY Spot Gravel.

5.840 R/D 3 Construct. COR to stake locations.

5.855 CCC 1 18" CMP, Maintain using hand tools. Protect.

5.856 6.579 CY Spot Graveling possible in this section.

6.579 EOP End Road Reconditioning. End of Project.

Description of Work NFSR 270 8

M

P

EM

P

SP

EC

FE

A

TU

R

E

U N

IT

S

(fe et

U N

IT

S

(m ile

U N

IT

S

(E ac h)

U N

IT

S

(C .Y

DESCRIPTION OF WORK

BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary

Description of Work NFSR 270 9

NFSR 270