Schedule of Items
Company:Project Title:Cerro Pelado Road Reconstruction
Date:Representative:
BASE Items
Item No.DescriptionUnitQuantityUnit CostAmount
151(01)MobilizationLSALL
201(01)Clearing and Grubbing, <0.5 Ac., Disposal Method (b) ScatteringLSALL
203(01)Removal of Structures and Obstructions, CMP removal and disposal, 18" dia. CMPLF26
203(02)Removal of Structures and Obstructions, 24" dia. CMP removal and disposalLF210
203(03)Removal of Structures and Obstructions, 36" diam. CMP removal and disposalLF30
203(04)Removal of Structures and Obstructions, 24' Cattleguard, Remove and SalvageEA1
204(01)Excavation and Embankment, Recontuour Small areas, <1.0 Ac. Total, Compaction Method (d)LSALL
204(02)Excavation and Embankment, Reconstruct Grade Dip, Compaction Method (d)EA2
204(03)Excavation and Embankment, Construct Rolling Dip, Compaction Method (d)EA15
204(04)Excavation and Embankment, Reconstruct Rolling Dip, Compaction Method (d)EA74
204(05)Excavation and Embankment, Place Common Backfill, Compaction Method (d)TON280
207(01)Earthwork Geosynthetics, Type 6 Non-woven geotextile, Install w/ 251(01) Check DamsLSALL
209(01)Structure Excavation and Backfill, 24" dia. CMP Culverts, Compaction Method (d)LF128
209(02)Structure Excavation and Backfill, 36" dia. CMP Culverts, Compaction Method (d)LF156
209(03)Structure Excavation and Backfill, 48" dia. CMP Culverts, Compaction Method (d)LF36
251(01)Riprap, Class 2, Construct ~9 small Check DamsTON20
251(02)Riprap, Gov Furnished Class 1, Install ONLYCY10
301(01)Aggregate Courses, Spot Gravel, R3-G FS Specs, Compaction Method (d)TON1400
301(02)Aggregate Courses, 4" Compacted, 14' w, R3-G FS Specs, Compaction Method (d), w/ initial Road ReconditioningMILE14.3
303(01)Road Reconditioning, Compaction Method (d)MILE8
418(01)Asphalt Concrete Pavement Patching, Type 1SY15
602(01)Culverts, Furnish/Install 24" CMP, 16 GA, Galvanized, Compaction Method (d)LF278
602(02)Culverts, Furnish/Install 36" CMP, 16 GA, Galvanized, Compaction Method (d)LF30
602(03)Culverts, Furnish/Install 48" CMP, 16 GA, Galvanized, Compaction Method (d)LF36
619(01)Cattleguard, Install 24' wide CG w/ wings and wing posts, U-80 SpecsEA1
619(02)Cattleguard, MaintainEA1
633(01)Permanent Traffic Control, Install Type III Object Markers w/ Cattleguard installation, Contractor FurnishedEA4
635(01)Temporary Traffic Control, w/ message boards, message boards NTE 3 DaysLSALL
704(01)Soil, Common Backfill, Contractor FurnishedTON500
BASE Subtotal
NMGRT
BASE TOTAL
Option Item A
Item No.DescriptionUnitQuantityUnit CostAmount
201(01)aClearing and Grubbing, <0.5 Ac., Disposal Method (b) ScatteringLSALL
314(01)aStockpiled Aggregates, R3-G Specifications, within project boundaryTON500
Option A Subtotal
NMGRT
Option A TOTAL
Option Item B
Item No.DescriptionUnitQuantityUnit CostAmount
201(01)bClearing and Grubbing, <0.5 Ac., Disposal Method (b) ScatteringLSALL
314(01)bStockpiled Aggregates, Class 0 Riprap, within project boundaryTON500
Option B Subtotal
NMGRT
Option B TOTAL

Total w/ BASE & Option A

Total w/ BASE & Options A & B