Attachment F2_NFSR_10AE_road_log_DRAFT_127EAX26Q0056.pdf
PDF 98 KB Posted
- Attached to
- Solicitation is Restricted to the Current Region 3 FERM BPA Holders - USDA Forest Service
- Solicitation number
- 127EAX26Q0056
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Description of Work document for NFSR 10AE, a National Forest System Road project that outlines specific work activities and their locations along the road corridor.
The project encompasses three primary work items: (1) cut and fill operations at a Corrugated Metal Pipe (CMP) location totaling approximately 135 cubic yards, with payment to be processed under Line item 204(01); (2) construction of a rolling dip with lead out ditch (R/D with LOD) at one location; and (3) project completion at the end of project marker. The document includes a comprehensive legend defining standard abbreviations and terminology used in road maintenance and construction, including drainage infrastructure (DIT, CMP, LWC), earthwork operations (CAF, G/D, C/G), road features (R/D, C/W, ALN), and administrative designations (BOP, EOP, LOD, OSL, ISL). Measurements are provided in multiple units including feet, miles, and cubic yards to accommodate different work specifications. The scope represents routine road maintenance and drainage improvement work on this National Forest System Road segment.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NFSR 10AE
B M
P
EM
P
SP
EC
FE
A
TU
R
E
U N
IT
S
(fe et
U N
IT
S
(m ile
U N
IT
S
(E ac h)
U N
IT
S
(C .Y
DESCRIPTION OF WORK
0.000 0.049 CAF 135
Cut and fill at CMP. (~135 CY) Paid under Line item 204(01).
0.050 R/D 1 Construct w/ LOD.
0.055 EOP End of Project.
BOP = Beginning of Project DIT = Drainage Ditch CMP = Corrugated Metal Pipe CY = Cubic Yards EOP = End of Project SLP = Slump INT=Intersection TO = Turnout LWC = Low Water Crossing R/D = Rolling Dip C/W = Curve Widening CCC = Civilian Conservation Corp. (Historic) G/D = Grade Dip C/G = Cattleguard SGN = Sign CLR = Establish 4' Clearing Limits ALN = Realignment PVT = Private Property BDY = Boundary LOD = Lead Out Ditch OSL = Outslope ISL= Inslope CAF = Cut and Fill
NFSR 10AE
Description of Work NFSR 10AE 1
NFSR 10AE
File details come from the government source that posted it. Updated .